ML20206P670
| ML20206P670 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 03/31/1987 |
| From: | Musolf D, Myrabo A NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 8704210245 | |
| Download: ML20206P670 (5) | |
Text
' l Q ;
OPERATING DATA REPORT s
DOCKET NO.
50-263 DATE 4-1-87 COMPLETED.BY A.
L.
Myrabo TELEPHONE 612/295-5151 OPERATING STATUS (Notes
- 1. Unit Name :
Monticello 1
1
- 2. Reporting period:
MARCH 1
- 3. Licensed Thermal Power (MWt):
1670.
I 1
- 4. Nameplate Rating (Gross MWe):
569-1 1
- 5. Design Electrical Rating (Net MWe):
545.4 1
1
- 6. Maximum Dependable Capacity (Gross MWe):
564 1
1
- 7. Maximum. Dependable Capacity (Net MWe):
- 536 1
J!
8.
If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any: __N/A This Month Yr.-to-Date Cumulative
.11. Hours In Reporting Period 744 2160 138073
- 12. Number Of Hours Reactor Was Critical 744.0 1996.6 107230.7
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
- 14. Hours Generator On-Line 744.0 1953.7 104898.1
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1224614 3163278 159805630
- 17. Gross Electrical Energy Generated (MWH) 415156 1075053 54253665
- 18. Net Electrical Energy Generated (MWH)
- 399644
- 1033466
-~51880855
- 19. Unit Service Factor
- 100.0%
90.4%
76.0%-
- 20. Unit Availability Factor
- 100.0%
90.4%
76.0%
- 21. Unit Capacity Factor (Using MDC Net)
[ 100.2%
89.3%
70.1%
- 22. Unit Capacity Factor (Using DER Net)
___ 98.5%
87.7%
68.9%
- 22. Unit Forced Outage Rate 0.0%
3.9%
4.6%
- 24. Shutdowns Scheduled Over Next 12 Months TType, Date, and Duration of Each)
__1987 refueling outage - October 21, 1987 - 42 days
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 87042)hhhk h
Ngfkl PDR s\\\\ l
.J
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263 UNIT Monticello
~~
DATE 4-1-87 COMPLETED BY A.
L.
Myrabo TELEPHONE 612/295-5151 MONTH MARCH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) i 1
537 17 545 2
545 18 544 3
548 19 545 4
500 20 544 5
447 21 543 6
545 22 542 7
550 23 543 8
535 24 544 9
545 25 543 10 548 26 544 11 542 27 545 12 547 28 545 13 546 29 542 5
14 471 30 547 15 542 31 546 16 544 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
+
-NARRATIVE"
SUMMARY
OF OPERATING. EXPERIENCE DOCKET NO.
50-263-DATE 4-1-87 4
COMPLETED BY A.
L. Myrabo-TELEPHONE 612/295-5151 MONTH MARCH i
3 87 3 87.
Power operation.
to 3 87 Reduced power to repair CRD pump (s).
3 87
.to Power operation.
i 3 87 3 87 Reduced power to. repair condensate pump seal water line.
3 87
)
to Power operation.
3 87 4
SPENT FUEL STORAGE UPDATE i
Fuel assemblies in core 484 Fuel assemblies in spent fuel storage pool 284 Licensed capacity 2237 Date of last refueling that can be 2010 discharged with present capacity Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
i t.
I i
1
)
-n e
. o:.
- i.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCEET NO. 50-263 UNIT NAME Monticello DATE February 2,
1987 COMPLETED 1BT A.
L.
MYRA50 REPORT MONTH
/ebruary TELEPHONE 612/295-5151 No.
Date Type Duration Reason Method ~
LER System Comp.
Cause & Corrective (1)
(hours)
(2) of No.
Code Code Action to shutdown (4)
(5)
Prevent Recurrence (3) 7 3-4-87 F
0.0 A
4 N/A AA P
Reduced reactor power to 25% in anticipation of CRD pump failure - Repaired standby pump, 1
2 3
4 F
Forced Reason Methodt Draft IEEE Standard St Scheduled A-Equipment railure (Explain) 1-Manual 805-1984(P405-DS)'
3 Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5
D-Regulator' Restriction 4-Other (Explain)
ZEEE Standard 803A-1983 T-Operator Training' & License Examination F-Administrative G-Operational Error (Esplain).
N-Other'(Explain) 4
,_...-_l
....4 Northern States Power Company 414 Nicollet Mall Minneapohs. Minnesota 55401 Telephone (612) 330 5500 April 9, 1987 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report April, 1987 Attached is the Monthly Operating Report for March, 1987 for the Monticello Nuclear Generating Plant.
D D b-%.
David Musolf Manager of Nuclear Support Services DMM/MMV/ dab c: Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector MPCA Attn: J W Ferman Attachment
%