Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With + (ML20206P457)
- ML20206P458 + (ML20206P458)
- ML20206P462 + (ML20206P462)
- 05000295/LER-1986-024, :on 860529,open Hole Discovered Penetrating Floor of Svc Water Pump Room Along West Wall Located in Crib House.Caused by Not Reclosing Penetration Originally Cut to Accommodate Cable Tray Riser + (ML20206P463)
- ML20206P464 + (ML20206P464)
- ML20206P469 + (ML20206P469)
- ML20206P472 + (ML20206P472)
- ML20206P475 + (ML20206P475)
- ML20206P476 + (ML20206P476)
- ML20206P477 + (ML20206P477)
- IR 05000461/1986030 + (ML20206P478)
- IR 05000352/1987005 + (ML20206P481)
- ML20206P482 + (ML20206P482)
- ML20206P483 + (ML20206P483)
- ML20206P485 + (ML20206P485)
- JPN-98-055, Informs That Authority Is Withdrawing License Amend Request Re Inservice Leak & Hydrostatic Testing Operation.Licensee Plans on Submitting Special Operations Section 3.10.1 as Part of Improved TS for Plant + (ML20206P486)
- ML20206P489 + (ML20206P489)
- ML20206P490 + (ML20206P490)
- ML20206P491 + (ML20206P491)
- ML20206P492 + (ML20206P492)
- ML20206P494 + (ML20206P494)
- B17578, Informs That Util Implemented Programmatic Enhancements to Provide Severe Accident Mgt Capability for Units 2 & 3. Operator Training on SAMG Has Been Completed.No Commitments Contained within Ltr + (ML20206P497)
- ML20206P499 + (ML20206P499)
- B17606, Submits Response to NRC Question Re SG Blowdown Isolation Valves Credited in Accident Analysis.No Commitments Made + (ML20206P500)
- ML20206P501 + (ML20206P501)
- ML20206P502 + (ML20206P502)
- B17517, Application for Amend to License DPR-65,incorporating Changes to ESF Pump Testing Contained in TSs 3.5.2,3.6.2.1, 3.7.1.2,3.7.3.1 & 3.7.4.1 + (ML20206P505)
- ML20206P506 + (ML20206P506)
- ML20206P510 + (ML20206P510)
- ML20206P511 + (ML20206P511)
- ML20206P512 + (ML20206P512)
- ML20206P513 + (ML20206P513)
- ML20206P514 + (ML20206P514)
- ML20206P515 + (ML20206P515)
- U-603139, Informs That Jp Mcelwain Has Been Appointed as Chief Nuclear Officer of Cps,Effective 990105,replacing Wg Macfarland + (ML20206P516)
- ML20206P517 + (ML20206P517)
- ML20206P518 + (ML20206P518)
- ML20206P519 + (ML20206P519)
- ML20206P520 + (ML20206P520)
- ML20206P522 + (ML20206P522)
- B17607, Informs of Determination That Util Will Be Ready for Commencement of 40500 Insp, Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems, on 990118 + (ML20206P525)
- ML20206P527 + (ML20206P527)
- ML20206P529 + (ML20206P529)
- IR 05000395/1999002 + (ML20206P530)
- PNO-III-87-052, on 870408,licensee Reported That Channel Check of Containment High Pressure Instrumentation Not Performed Once Per Shift.Caused by Incorrect Designation of Instrument or Omission in Surveillance Procedure + (ML20206P531)
- ML20206P532 + (ML20206P532)
- ML20206P535 + (ML20206P535)
- ML20206P536 + (ML20206P536)
- IR 05000341/1986014 + (ML20206P538)
- ML20206P539 + (ML20206P539)
- ML20206P540 + (ML20206P540)