Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000414/LER-1986-033-01, :on 860711,Phase a Containment Isolation Occurred,Closing Nonessential Containment Penetration Isolation Valves.Cause Not Determined.Valves Will Be Tested to Verify Proper Operation.Tech Specs Will Be Revised + (ML20206N124)
- ML20206N125 + (ML20206N125)
- ML20206N127 + (ML20206N127)
- ML20206N128 + (ML20206N128)
- 05000414/LER-1986-032, :on 860709,main Feedwater Isolation Occurred Due to hi-hi Level in Steam Generator C.Caused by Leaking Control Valves.Procedures Revised to Isolate Control Valves When Providing Flow W/Control Bypass Valves + (ML20206N129)
- 3F0599-16, Rev 0 to LAR 251 to License DPR-72,revising CR-3 ITS Administrative Controls Section 5.8, High Radiation Area. Util Requests NRC Approval by June 30,2000 + (ML20206N130)
- ML20206N131 + (ML20206N131)
- IR 05000293/1985015 + (ML20206N132)
- ML20206N135 + (ML20206N135)
- ML20206N136 + (ML20206N136)
- ML20206N140 + (ML20206N140)
- ML20206N141 + (ML20206N141)
- ML20206N142 + (ML20206N142)
- IR 05000293/1986015 + (ML20206N143)
- ML20206N144 + (ML20206N144)
- ML20206N145 + (ML20206N145)
- ML20206N147 + (ML20206N147)
- ML20206N148 + (ML20206N148)
- ML20206N149 + (ML20206N149)
- ML20206N150 + (ML20206N150)
- BSEP-99-0062, Forwards Latest Revs of COLR & Suppl Reload Licensing Rept, for Bsep,Unit 2.Proprietary Rev 6,Suppl 2 to NEDC- 31624P & EMF-2168P,included.Proprietary Encls Withheld, Per 10CFR2.790 & 10CFR9.17 + (ML20206N151)
- JAFP-87-0297, Forwards Rev 5 to Ja Fitzpatrick Nuclear Power Plant Offsite Dose Calculation Manual & Util Response to NRC Questions Re Commission Review of Manual,Per Hi Abelson 861002 Request + (ML20206N156)
- ML20206N157 + (ML20206N157)
- 05000338/LER-1986-007-03, :on 860729,diesel-driven Fire Pump Out of Svc Greater than 7 Days.Caused by Test Coordinating Error Which Produced Delay.Personnel Responsible Counseled to Prevent Recurrence + (ML20206N158)
- ML20206N159 + (ML20206N159)
- ML20206N160 + (ML20206N160)
- ML20206N164 + (ML20206N164)
- ML20206N166 + (ML20206N166)
- 05000302/LER-1986-012, :on 860731,discovered That Surveillance Procedure SP-312, Heat Balance Calculations, Not Performed.Caused by Personnel Error.Procedure Conducted. Personnel Counseled + (ML20206N167)
- ML20206N168 + (ML20206N168)
- ML20206N171 + (ML20206N171)
- ML20206N172 + (ML20206N172)
- ML20206N173 + (ML20206N173)
- TXX-6386, Responds to Violations Noted in Insp Repts 50-445/85-18 & 50-446/85-15.Date of Full Compliance for Notice of Violation,Item C Revised.Corrective Actions:Design Change Authorization 13023 Revised + (ML20206N174)
- ML20206N175 + (ML20206N175)
- ML20206N177 + (ML20206N177)
- ML20206N178 + (ML20206N178)
- ML20206N179 + (ML20206N179)
- ML20206N181 + (ML20206N181)
- ML20206N182 + (ML20206N182)
- ML20206N183 + (ML20206N183)
- ML20206N185 + (ML20206N185)
- ML20206N187 + (ML20206N187)
- ML20206N189 + (ML20206N189)
- ML20206N191 + (ML20206N191)
- ML20206N192 + (ML20206N192)
- 05000327/LER-1986-033, :on 860717,seismic Qualification of Charcoal Filter Trays Not Verified in Listed Sys.Caused by Untraceability of Trays.Qualified Trays Will Be Installed Prior to Start Up + (ML20206N194)
- ML20206N195 + (ML20206N195)
- ML20206N196 + (ML20206N196)
- ML20206N200 + (ML20206N200)
- ML20206N204 + (ML20206N204)