Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205P839 + (ML20205P839)
- ML20205P840 + (ML20205P840)
- ML20205P841 + (ML20205P841)
- ML20205P846 + (ML20205P846)
- ML20205P848 + (ML20205P848)
- ML20205P850 + (ML20205P850)
- ML20205P851 + (ML20205P851)
- ML20205P853 + (ML20205P853)
- ML20205P854 + (ML20205P854)
- 05000295/LER-1987-005-03, :on 870227,reactor Trip Signal on Steam Generator 1D lo-lo Level Generated.Caused by Inadvertent Opening of Loop D MSIV Bypass Valve in failed-closed Position.Valve Reclosed Manually + (ML20205P855)
- ML20205P858 + (ML20205P858)
- ML20205P859 + (ML20205P859)
- SVP-99-065, Requests That License SOP-31516,for Jf Graham,Be Terminated, Per 10CFR50.74(b).Individual Was Removed from License Duty on 990319 & No Longer Requires Operator License + (ML20205P860)
- ML20205P861 + (ML20205P861)
- RBG-44968, Submits Addl Info Re 981008 LAR 1998-02 Re Implementation of Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long- Term Solution.Clarifies Certain Aspects of Proposed Ts,Per 990406 Telcon with NRC + (ML20205P862)
- ML20205P863 + (ML20205P863)
- ML20205P864 + (ML20205P864)
- ML20205P865 + (ML20205P865)
- 05000269/LER-1999-002-01, :on 990317,identified Problem Associated with Ability to Establish Flow Pressure LPI Discharge Headers within 15 Minutes.Caused by Inadequate Validation Process. Engineering Analysis Performed.With + (ML20205P867)
- 05000498/LER-1988-056, :on 880930,determined That Two Primary Penetration Protection Circuit Breakers Not Included in Surveillance Test Program as Required by Tech Spec.Caused by Use of Licensing Basis Document + (ML20205P868)
- ML20205P869 + (ML20205P869)
- ML20205P870 + (ML20205P870)
- ML20205P871 + (ML20205P871)
- ML20205P872 + (ML20205P872)
- ML20205P873 + (ML20205P873)
- ML20205P875 + (ML20205P875)
- ST-HL-AE-2819, Advises That Facility Will Be Ready to Load Fuel During Wk of 881219.Ongoing Work Will Be Planned & Controlled That No Effect on Fuel Load & Subsequent Testing Anticipated.Status of Facility at Fuel Load Encl + (ML20205P876)
- ML20205P877 + (ML20205P877)
- ML20205P878 + (ML20205P878)
- IR 05000309/1988017 + (ML20205P879)
- ML20205P880 + (ML20205P880)
- ML20205P882 + (ML20205P882)
- ML20205P883 + (ML20205P883)
- ML20205P884 + (ML20205P884)
- ML20205P885 + (ML20205P885)
- ML20205P886 + (ML20205P886)
- ML20205P887 + (ML20205P887)
- ML20205P888 + (ML20205P888)
- ML20205P889 + (ML20205P889)
- ML20205P890 + (ML20205P890)
- ML20205P892 + (ML20205P892)
- ML20205P897 + (ML20205P897)
- 05000352/LER-1988-030, :on 881003,determined That Unit Operating in Unanalyzed Condition from Receipt of OL Until 880419.Caused by Personnel Error Due to Design Change Not Implemented During Const.Fire Damper Doors Inspected + (ML20205P898)
- ML20205P899 + (ML20205P899)
- ML20205P900 + (ML20205P900)
- ML20205P901 + (ML20205P901)
- ML20205P902 + (ML20205P902)
- ML20205P903 + (ML20205P903)
- ML20205P904 + (ML20205P904)
- ML20205P905 + (ML20205P905)
- ML20205P906 + (ML20205P906)