Confirms Dates of 881114-18 for NRC Reg Guide 1.97 Insp Re post-accident Monitoring Instrumentation.List Provided of Areas to Be Inspected
ML20205P900
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 11/03/1988
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 8811090009
Download: ML20205P900 (2)


Text

r

,J, NOV 3 1988 Docket No. 50-254 Docket No. 50-265 Commonwealth Edison Company ATTN: Mr. Cordell Reed Senior Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

SUBJECT:

Regulatory Guide (RG) 1.97 Inspection - Quad Cities Nuclear Power Station - Units 1 and 2 This letter confirms the dates of November 14-18, 1988, for the NRC RG 1.97 inspection in regard to post-accident monitoring instrumentation. These dates were established during a telephone conversa', ion between Ms. Irene Johnson of your staff and Mr. A. S. Gautam of my staff.

The inspection will be performed by a three member inspection team with Mr. A. S. Gautam as lead inspector.

We plan to inspect the following areas:

Review of master equipment list for inclusion of Category 1 and 2 instruments, and for justification of omission of any items or variables required by RG 1.97 and the final NRC RG 1.97 SER.

Review of adequacy of demonstrated instrument loop accuracy for selected Category 1 and 2 instruments.

Review of range of installed RG 1.97 instruments, adequacy of equipment interfaces, and direct measurement of parameter by sensors.

Review of frequency of testing and calibration of selected RG 1.97 l

instruments.

Review of installation of instruments in the plant; adequacy of display and recording signals in the control room; and identification in the li control room of selected r,G 1.97 instrumentation (plant walkdown).

L Review of instrument redundancy, physical and electrical separation of circuits and power supplies; and integrity of power sources of selected RG 1.97 instrumentation.

Review of previously identified 10 CFR 50.49 findings and any new EQ equipment.

0009 83 Q3

^~aow)a)y

-mg

[

a

o-Commonwealth Edison Company 2

NOV 3 1988 A management entrance meeting is seneduled for 2:00 p.m. on November 14, 1988.

I A plant walkdown is scheduled for November 16, 1988, and an NRC exit meeting is scheduled for 11:00 a.m. on Novemoer 18, 1988.

To facilitate NRC preparation for this inspection, your staff has been requested to submit the following documents no later than November 8, 1988:

1.

Licensee's master equipment list identifying RG 1.97 Categories 1 and 2 instruments.

2.

Final NRC SER on RG 1.97 equipment, as well as any NRC acceptance of deviations to RG 1.97, i

3.

Final NRC SER's on DCRDR and SPDS reviews.

I 4.

Status of previously identified 10 CFR 50.49 findings.

l You are requested to make a presentation at the entrance meeting to address your implemen*ation of RG 1.97 and arrangements for a plant walkdown.

Should you have any questions regarding this inspection,or Mr. A. S. Gautam (please conta Mr. R. N. Gardner at (312) 790-5524 312) 790-5523.

Sincerely, i

Original signed by D.11. Danielson (for)

J. J. Harrison, Chief i

Engfneering Branch cc:

H. Bliss, Nuclear Licensing Manager R. L. Bax, Station Manager DCD/DCB (RIOS)

T. Rost, NRR D. Potapovs, NRR Licensing Fee Management Branch Resident Inspector, RI!!

Richard Hubbard i

J. W. McCaffrey, Chief, Public Utilities Division i

R!!I RIJ I R l l ! 't

R!ll R!ll

/t F(I' q#4 W

b 1//

1 g /jk Kopp Gautam Ring Gardner

& Harrison 11/03/08 11/ 3 /88 11/ 3 /88 11/3 /E8 11/j/88 l