Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205P342 + (ML20205P342)
- AECM-88-217, Special Rept 88-004:on 881021,containment Ventilation Exhaust Accident Range Radiation Monitor Removed from Svc. Erratic Readings Observed During Surveillance.Caused by Damaged Cable Assembly.Channel 2 Tube Replaced + (ML20205P344)
- ML20205P344 + (ML20205P344)
- ML20205P345 + (ML20205P345)
- 05000412/LER-1999-003-01, :on 990311,containment Equipment Hatch Was Not Completely Closed During Refueling Operations.Caused by Failure to Understand Supporting Function of Chain Hoists. Revised Procedure.With + (ML20205P346)
- ML20205P347 + (ML20205P347)
- ML20205P348 + (ML20205P348)
- ML20205P349 + (ML20205P349)
- 05000346/LER-1986-018, :on 860407,during Stringing of Temporary Instrumentation Cables,Fire/Negative Pressure Breached. Caused by Inadequate Technical Supervision.Test Engineer Released & Test Leader Suspended W/O Pay + (ML20205P350)
- ML20205P351 + (ML20205P351)
- ML20205P352 + (ML20205P352)
- ML20205P353 + (ML20205P353)
- ML20205P354 + (ML20205P354)
- ML20205P355 + (ML20205P355)
- TXX-4802, Part 21 & Final Deficiency Rept CP-86-29 Re Gibbs & Hill Acceptance Testing for air-operated Valves in Instrument Air Sys.Initially Reported on 860414.Item Not Reportable Per 10CFR50.55(e) + (ML20205P357)
- 05000412/LER-1999-004, :on 990312,inadequate Basis for Seismic Instrument Setpoints & Calibration Led to TS Noncompliance. Caused by Discrepancy in Tss.Noncompliances Were Corrected & Appropriate Procedures Were Revised.With + (ML20205P358)
- ML20205P359 + (ML20205P359)
- ML20205P360 + (ML20205P360)
- 2CAN049904, Informs That Based on Discussions with NRC Re 960823 Amend Request,Addl Info Was Added to TS 5.2.2 Re Control Element Assemblies (Ceas) Section of Proposed Change.Associated TS Page (5-1) Has Been Revised & Encl + (ML20205P362)
- 05000305/LER-1986-005, :on 860417,reactor Trip Occurred During Performance of Work Request on Intermediate-Range Nuclear Channel N35.Caused by Premature Removal of Control Power Fuse + (ML20205P363)
- ML20205P364 + (ML20205P364)
- ML20205P365 + (ML20205P365)
- ML20205P367 + (ML20205P367)
- ML20205P368 + (ML20205P368)
- IR 05000458/1985081 + (ML20205P369)
- ML20205P370 + (ML20205P370)
- ML20205P371 + (ML20205P371)
- ML20205P373 + (ML20205P373)
- ML20205P375 + (ML20205P375)
- ML20205P376 + (ML20205P376)
- ML20205P377 + (ML20205P377)
- ML20205P378 + (ML20205P378)
- IR 05000424/1987018 + (ML20205P379)
- 05000289/LER-1998-011-01, Forwards LER 98-011-01,which Updates & Replaces Info Re Thermo-Lag Fire Barriers Found Installed Outside Approved Joint Arrangement.Rept Was Determined Reportable on 980825 & Reported Via LER 98-011-00 on 980923 + (ML20205P380)
- ML20205P382 + (ML20205P382)
- RBG-23566, Suppls 860227 Response to Violations Noted in Insp Rept 50-458/85-81.Departmental Review of All Station Operating Procedures in Main Control Room Controlled Copy 3 Conducted & Station Document Control Reassignment Made + (ML20205P383)
- 1CAN049901, Application for Amend to License DPR-51,revising Requirements Associated with ANO 1 Provisions for RB Testing & Insp + (ML20205P386)
- ML20205P387 + (ML20205P387)
- ML20205P391 + (ML20205P391)
- ML20205P392 + (ML20205P392)
- ML20205P393 + (ML20205P393)
- IR 05000413/1985055 + (ML20205P394)
- ML20205P395 + (ML20205P395)
- IA-87-156, Package Containing Lists of FY86 Phases I & II awards,FY86 Project Summaries for Small Business Innovation Research Program Phases I & II & Lists of Small Business Innovation Research Program Proposals for FY86 + (ML20205P398)
- ML20205P398 + (ML20205P398)
- ML20205P399 + (ML20205P399)
- ML20205P400 + (ML20205P400)
- ML20205P402 + (ML20205P402)
- ML20205P403 + (ML20205P403)
- ML20205P404 + (ML20205P404)
- ML20205P405 + (ML20205P405)