Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205P242 + (ML20205P242)
- ML20205P243 + (ML20205P243)
- ML20205P244 + (ML20205P244)
- ML20205P246 + (ML20205P246)
- ML20205P247 + (ML20205P247)
- ML20205P250 + (ML20205P250)
- ML20205P251 + (ML20205P251)
- ML20205P253 + (ML20205P253)
- ML20205P254 + (ML20205P254)
- ML20205P255 + (ML20205P255)
- 05000312/LER-1986-006, :on 860414,failure to Implement Fire Protection Deluge Sys 3-yr Flow Test Identified.Caused by Confusion Over Tech Spec Requirements.Spray Sys Reviewed.Procedures Reviewed for mods.Cross-reference List Revised + (ML20205P257)
- ML20205P260 + (ML20205P260)
- ML20205P262 + (ML20205P262)
- ML20205P265 + (ML20205P265)
- ML20205P266 + (ML20205P266)
- ML20205P267 + (ML20205P267)
- ML20205P268 + (ML20205P268)
- ML20205P269 + (ML20205P269)
- ML20205P273 + (ML20205P273)
- 05000499/LER-1999-003, :on 990312,ESFA & Entry Into TS 3.0.3 Occurred Following Partial Loss of Offsite Power.Caused by Failure of Switchyard Breaker.Licensee Provided Addl Training on Importance of Conducting Appropriate Functional Tests + (ML20205P274)
- ML20205P275 + (ML20205P275)
- 05000483/LER-1986-011, :on 860416 & 17,continuous Sampling of Effluent Releases from Radwaste Bldg Vent Sys Not Performed.Caused by Isolation & Nonstarting of Radiation Sampler & Miscommunication.Procedures Revised + (ML20205P276)
- ML20205P277 + (ML20205P277)
- BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With + (ML20205P278)
- ML20205P279 + (ML20205P279)
- ML20205P280 + (ML20205P280)
- ML20205P281 + (ML20205P281)
- ML20205P282 + (ML20205P282)
- ML20205P283 + (ML20205P283)
- ML20205P284 + (ML20205P284)
- 05000255/LER-1999-001, :on 990310,noted Failure to Perform TS Surveillance Channel Check of Auxiliary Feedwater Flow Indication.Caused by Misinterpretation of Definition of Channel Check.Implementing Procedure Has Been Revised + (ML20205P287)
- ML20205P291 + (ML20205P291)
- ML20205P292 + (ML20205P292)
- ML20205P293 + (ML20205P293)
- ML20205P294 + (ML20205P294)
- ML20205P295 + (ML20205P295)
- ML20205P296 + (ML20205P296)
- ML20205P298 + (ML20205P298)
- ML20205P299 + (ML20205P299)
- ML20205P301 + (ML20205P301)
- ML20205P302 + (ML20205P302)
- ML20205P304 + (ML20205P304)
- ML20205P305 + (ML20205P305)
- ML20205P307 + (ML20205P307)
- ML20205P309 + (ML20205P309)
- ML20205P311 + (ML20205P311)
- ML20205P312 + (ML20205P312)
- ML20205P313 + (ML20205P313)
- ML20205P314 + (ML20205P314)
- IR 05000458/1986005 + (ML20205P315)
- ML20205P316 + (ML20205P316)