Forwards Insp Repts 50-413/85-55 & 50-414/85-68 on 851226-860201 & Notices of Violation & Deviation.Response Should Describe Corrective Actions to Improve Mgt Controls Sys
ML20205P246
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/18/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20205P249 List:
References
NUDOCS 8605210285
Download: ML20205P246 (2)


See also: IR 05000413/1985055

Text

_ . - -

_ _ _ _

@va C\\ k

>.

,

.

'

s

APR 181986

Duke Power Company

ATTN: Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT:

REPORT NOS. 50-413/85-55 AND 50-414/85-68

On December 26, 1985 - February 1,1986, NRC inspected activities authorized by

NRC Operating License No. NPF-35 and Construction Permit No. CPPR-117 for your

Catawba facility.

At the conclusion of the inspection, the findings were

discussed with those members of your staff identified in the enclosed inspection

report.

Area.; examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC require-

ments and other activities appeared to deviate from a commitment to the NRC. The

violations and deviations, with pertinent references and elements to be included

in your response, are presented in the enclosed Notices.

In addition to the need for corrective action regarding the specific matters

identified in Notice of Violation No.1, we are concerned about the implementa-

,

tion of your management controls system that permitted this situation to develop.

Consequently, your response should describe those particular actions taken or

planned to improve the effectiveness of your program.

Your attention is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC's Public Document Room.

The responses directed by this letter and the enclosed Notices are not subject to

the clearance procedures of the Office of Management and Budget,' issued under the

Paperwork Reduction Act of 1980, PL 96-511.

[ kDON

G

L

i

,

.

-.

___

__

APR 181986

,

.

-

6

Duke Power Company

2

o

Should you have any questions concerning this letter, please contact us.

Sincerely,

Original Signed by.

Luis A. Reyes /for

Roger D. Walker, Director

Division of Reactor Projects

Enclosures:

I

1.

Notice of Violation

2.

Notice of Deviation

3.

Inspection Report Nos. 50-413/85-55

and 50-414/85-68

cc w/encis:

R. L. Dick, Vice President - Construction

)(J.W.Hampton,StationManager

"

\\ cc w/encis:

b

4K. N. Jabbour, NRR

State of South Carolina

Document Control Desk

kNRCResidentInspector

r

i

.

-

E

%?

RII

RII

RI

'

f

CB ger:bhg

VBr 'nlee

GJen Wns

03 $ 86--

43/ 5-/8fr--

034(,/86

3

f//7/M

'tl 1lt b