- PNO-III-87-042, on 870322,reactor Scrammed Manually Due to Control Rod Movement Into Reactor Core.Caused by Unexpected Isolation Valve Closure in Instrument Air Sys.Plant Will Be Shutdown for Several Days for Maint + (ML20205G152)
- ML20205G153 + (ML20205G153)
- ML20205G154 + (ML20205G154)
- ML20205G156 + (ML20205G156)
- ML20205G159 + (ML20205G159)
- ML20205G162 + (ML20205G162)
- ML20205G166 + (ML20205G166)
- PNO-II-87-019A, on 870322,NRC Informed That Insp & NDT of Reactor Head Closure Studs Indicated Exterior Corrosion & Evidence of Internal Thread Wasting.Reactor Head Will Be Removed for Insp + (ML20205G167)
- ML20205G170 + (ML20205G170)
- B12470, Forwards Revised Responses to Generic Ltr 83-28,Items 3.1.1, 3.1.2,3.2.1,3.2.2 & 4.5.1 Re post-maint Testing (Reactor Trip Sys Components & All Other safety-related Components) & Reactor Trip Sys Reliability,Per NRC 870310 Request + (ML20205G171)
- ML20205G172 + (ML20205G172)
- ML20205G173 + (ML20205G173)
- ML20205G175 + (ML20205G175)
- ML20205G180 + (ML20205G180)
- IR 05000346/1986017 + (ML20205G184)
- ML20205G185 + (ML20205G185)
- ML20205G186 + (ML20205G186)
- ML20205G187 + (ML20205G187)
- ML20205G188 + (ML20205G188)
- ML20205G189 + (ML20205G189)
- ML20205G191 + (ML20205G191)
- IR 05000458/1986025 + (ML20205G193)
- PNO-IV-87-013, discovered Evidence That UF6 Shipping Cylinders Have Stiffening Rings Fabricated from Matl Not Meeting Requirements of ANSI N 14.1-1971.Licensee Visual Insp of Cylinders Revealed No Defects + (ML20205G194)
- ML20205G196 + (ML20205G196)
- ML20205G197 + (ML20205G197)
- ML20205G199 + (ML20205G199)
- ML20205G200 + (ML20205G200)
- ML20205G201 + (ML20205G201)
- 05000334/LER-1988-014, :on 880923,steam Driven Auxiliary Feedwater Pump Spuriously Started.Caused by Personnel Error.Mod of Motor Driven Auxiliary Feedpump Starting Circuit to Prevent Similar Spurious Actions Performed + (ML20205G202)
- ML20205G203 + (ML20205G203)
- 05000483/LER-1985-043, :on 851003,while Plant in Hot Standby,Hourly Firewatch Patrol Insp of Portion of Area Performed 1 H & 25 Minutes After Sprinkler Sys Declared Inoperable.Caused by Personnel Error.Personnel Retrained + (ML20205G204)
- ML20205G206 + (ML20205G206)
- ML20205G207 + (ML20205G207)
- IR 05000285/1986007 + (ML20205G211)
- ML20205G212 + (ML20205G212)
- ML20205G214 + (ML20205G214)
- ML20205G216 + (ML20205G216)
- ML20205G217 + (ML20205G217)
- ML20205G219 + (ML20205G219)
- ML20205G220 + (ML20205G220)
- ML20205G221 + (ML20205G221)
- ML20205G224 + (ML20205G224)
- RA-99-0071, Forwards Rev 7 to Training & Qualification Plan & Rev 1 to Physical Security & Safeguards Contingency Plan for HBR2,per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld + (ML20205G226)
- ML20205G229 + (ML20205G229)
- IR 05000352/1998009 + (ML20205G230)
- ML20205G231 + (ML20205G231)
- 05000333/LER-1999-001-01, Forwards LER 99-001-01 Re Incorrect EDG line-up During Fire Placing Plant in Outside Design Basis.Suppl Contains Results of Completed Root Cause Evaluations & Subsequent Corrective Actions Taken.Rept Contains No Commitments + (ML20205G234)
- ML20205G235 + (ML20205G235)
- ML20205G236 + (ML20205G236)
- 05000483/LER-1985-044, :on 851003,07 & 08,ESF Actuated as Result of Steam Generator Levels Above hi-hi Trip Setpoint.Caused by Abnormal Component Conditions.Plant Placed in Stable Configuration.Startup Procedures to Be Revised + (ML20205G237)