ML20205G188

From kanterella
Jump to navigation Jump to search

Forwards Revised Tech Spec Page Re Changes to Action Statements in Event That RCS Leakage Exceeds 1 Gpm,Per Util 870218 Submittal.Key Phrase for Action d1 Inadvertently Omitted
ML20205G188
Person / Time
Site: Mcguire, Catawba, McGuire, 05000000
Issue date: 03/23/1987
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20205G192 List:
References
TAC-61680, TAC-61681, NUDOCS 8703310396
Download: ML20205G188 (2)


Text

.

DUKE POWER GOMP)LNY P.O. HO x 3 3180 CHAMLOTTE. N.O. 28242

"^t ";."T.""

<>Wa%Li March 23, 1987 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 9

Subject:

McGuire Nuclear Station Docket Numbers 50-369, -370 Catawba Nuclear Station Docket Numbers 50-413, -414 Proposed Technical Specification To Revise Allowable Unidentified Leakage Gantlemen:

By letter of February 18, 1987 Duke submitted proposed Technical Specification changes to revise the ACTION statements in the event RCS leakage exceeds 1 gpm.

Unfortunately, ACTION dl was miswritten in that a key phrase was inadvertently omitted. The first sentence of ACTION di in the proposed Technical Specifications for both stations should read, in part, "... identify leakage or reduce to less than or equal to 1 gpm within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least Hot Standby in the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and at least Cold Shutdown in the following 102 hours0.00118 days <br />0.0283 hours <br />1.686508e-4 weeks <br />3.8811e-5 months <br />."

(Omitted phrase underlined). Attached are replacement pages which supersede the appropriate pages in each station's proposed Technical Specification revision.

We regret any inconvenience this may he.be caused.

Very truly yours,

-864&_

Hal B. Tucker SAG /65/j gm Attachment 3310396 870323 p

ADOCK 05000369 PDR

[

Document Control Desk March 23, 1987 Page 2 a

xc:

Dr. J. Nelson Grace, Regional Administrator U.S. Nuclear Regulatory Commission - Region II 101 Marietta Street, Suite 2900 Atlanta, Georgia 30323 Mr. W.T. Orderc NRC Resident Inspector McGuire Nuclear Station NRC Resident Inspector Catawba Nuclear Station Mr. Darl Hood, Project Nhnager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Dr. K.N. Jabbour, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 4

l I

i i

i i

k i

r 1

4 v.-

,,,.-en--,..~

-w,

--m--,r.m n,,---r--,,--,--.g

,-v,,--r,--

.-e.,m.-,---

---,,-e,

-e

_,,w,--