Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205D777 + (ML20205D777)
- ML20205D779 + (ML20205D779)
- ML20205D780 + (ML20205D780)
- ML20205D783 + (ML20205D783)
- 3F0399-10, Forwards Rev 7-2 to Crystal River Unit 3 Psp.Plan Withheld from Public Disclosure,Per 10CFR73.21 + (ML20205D784)
- IR 05000250/1986029 + (ML20205D785)
- ML20205D787 + (ML20205D787)
- ML20205D788 + (ML20205D788)
- IR 05000458/1999002 + (ML20205D789)
- ML20205D790 + (ML20205D790)
- ML20205D791 + (ML20205D791)
- ML20205D793 + (ML20205D793)
- ML20205D797 + (ML20205D797)
- ML20205D798 + (ML20205D798)
- 05000270/LER-1986-004-05, :on 860708,reactor Tripped from 100% Full Power When Turbine & Main Feedwater Pumps Tripped.Caused by Failure of Feedwater Flow Transmitter A2.Unit Stabilized in Hot Shutdown Conditions + (ML20205D799)
- ML20205D800 + (ML20205D800)
- ML20205D801 + (ML20205D801)
- ML20205D804 + (ML20205D804)
- ML20205D805 + (ML20205D805)
- ML20205D806 + (ML20205D806)
- 05000327/LER-1986-029, :on 850118,ERCW Pump K-A Failed to Meet Acceptance Criteria as Determined by Measured Total Flow Rate & Appropriate Baseline Curve.Caused by Personnel Error. Operating Procedures Will Be Revised + (ML20205D809)
- ML20205D810 + (ML20205D810)
- ML20205D815 + (ML20205D815)
- ML20205D818 + (ML20205D818)
- ML20205D819 + (ML20205D819)
- JPN-99-008, Forwards Application for Amend to License DPR-59,converting CTS to Be Consistent with Improved Std TS in NUREG-1433, Rev 1.Synopsis of LAR for Conversion to Its,Pending Lars, List of Subsections,Scope of Changes & Commitments,Encl + (ML20205D820)
- ML20205D825 + (ML20205D825)
- ML20205D827 + (ML20205D827)
- ML20205D831 + (ML20205D831)
- IA-84-559, Responds to Appeal Re Denial of FOIA Request for Documents Re Philippine Nuclear Power Plant.Appeal Denied.Documents Withheld (Ref FOIA Exemption 4) + (ML20205D833)
- ML20205D833 + (ML20205D833)
- ML20205D834 + (ML20205D834)
- ML20205D835 + (ML20205D835)
- ML20205D839 + (ML20205D839)
- ML20205D842 + (ML20205D842)
- ML20205D843 + (ML20205D843)
- ML20205D845 + (ML20205D845)
- ML20205D847 + (ML20205D847)
- IR 05000275/1987009 + (ML20205D848)
- ML20205D850 + (ML20205D850)
- ML20205D851 + (ML20205D851)
- ML20205D853 + (ML20205D853)
- IA-85-614, Forwards Applicant Motion for Reconsideration of ASLB 841218 Order Re Matl False Statements on Torquing of U-bolts.W/o Encl + (ML20205D857)
- ML20205D857 + (ML20205D857)
- ML20205D860 + (ML20205D860)
- ML20205D864 + (ML20205D864)
- ML20205D865 + (ML20205D865)
- ML20205D868 + (ML20205D868)
- ML20205D870 + (ML20205D870)
- ML20205D874 + (ML20205D874)
- 05000440/LER-1986-035, :on 860714,RWCU Sys Automatically Isolated While Discharging Water to Main Condenser During Normal Operation.Caused by Technician Inadvertently Skipping Surveillance Instruction Step + (ML20205D876)