Other: LD-87-013, Informs That CESEC-III Computer Code Applicable to Analysis of FSAR Chapter 14 Events (Excluding ATWS) for Facility. Models Included in Code Applicable to Operating Conditions at Plant & Cover All Features of Facility NSSS, ML20093K990, ML20134N012, ML20204F478, ML20204F585, ML20204F631, ML20205D780, ML20206A626, ML20206K125, ML20206K572, ML20207P678, ML20209G723, ML20211M517, ML20211M527, ML20214H464
|
MONTHYEARML20093K9901984-10-0808 October 1984 Submits Addl Info Re CESEC-III Code for Reload Core Analysis Methodology,Per 840511 Request.Code Applicable to Facility Due to Digital Simulation of C-E PWR NSSS Project stage: Other ML20134N0121985-08-20020 August 1985 Advises That Util 850613 Submittal of Rev 1 to OPPD-NA-8301-P, Reload Core Analysis Methodology Overview Will Be Withheld from Public Disclosure,Per 10CFR2.790 Project stage: Other ML20214H4641986-11-17017 November 1986 Forwards Proprietary Rev 2 to OPPD-NA-8301-P, Omaha Public Power District Nuclear Analysis Reload Core Analysis Methodology Overview, Incorporating Methodology Changes for Cycle 11.Rept Withheld (Ref 10CFR2.790(b)(1)).Fee Paid Project stage: Other ML20211M5271986-11-30030 November 1986 Partially Withheld Nonproprietary Omaha Batch M Reload Fuel Design Rept (Ref 10CFR2.790) Project stage: Other ML20211M5171986-12-15015 December 1986 Forwards CEN-347(O)-NP & CEN-347(O)-P, Omaha Batch M Reload Fuel Design Rept, Re Core Reload Methodology Changes for Cycle 11,per D Sells Request.Proprietary Version Withheld (Ref 10CFR2.790(b)(1)).Affidavit Also Encl Project stage: Other ML20207J7061986-12-22022 December 1986 Forwards Request for Addl Info Re Util 861117 Submittal on Core Reload Methodology.Info Requested by 870130 to Meet Schedule for Cycle 11 Reload.Need for Receipt of Reload Amend Application by 870130 Emphasized Project stage: RAI ML20207P6781987-01-14014 January 1987 Advises That CEN-347(0)-P, Omaha Batch M Reload Fuel Design Rept, Contains Trade Secrets or Proprietary Commercial Info & Will Be Withheld from Public Disclosure Per 10CFR2.790 Project stage: Other ML20209G7231987-01-26026 January 1987 Forwards Rev 1-P to CEN-347(O)-P Omaha Batch M Reload Fuel Design Rept, & Responses to Cycle 11 Core Reload Methodology Change Questions for Review.Affidavit Also Encl. Rept Withheld (Ref 10CFR2.790) Project stage: Other LD-87-013, Informs That CESEC-III Computer Code Applicable to Analysis of FSAR Chapter 14 Events (Excluding ATWS) for Facility. Models Included in Code Applicable to Operating Conditions at Plant & Cover All Features of Facility NSSS1987-02-27027 February 1987 Informs That CESEC-III Computer Code Applicable to Analysis of FSAR Chapter 14 Events (Excluding ATWS) for Facility. Models Included in Code Applicable to Operating Conditions at Plant & Cover All Features of Facility NSSS Project stage: Other ML20212N0151987-03-0909 March 1987 Forwards Proprietary & Nonproprietary Revised Reload Methodology Overview Repts,Incorporating Comments & Correcting Typos.Application for Withholding Proprietary Repts (Ref 10CFR2.790) Encl Project stage: Request ML20204F3931987-03-18018 March 1987 Forwards Corrected Pages to Proprietary & Nonproprietary Revs to Core Reload Methodology Changes for Cycle 11, Correcting Typos.Application for Withholding Proprietary Repts (Ref 10CFR2.790) Encl Project stage: Request ML20204F5851987-03-18018 March 1987 Errata to Rev 1 to Neutronics Design Methods & Verification Project stage: Other ML20204F6311987-03-18018 March 1987 Errata to Rev 1 to Reload Core Analysis Methodology Overview Project stage: Other ML20204F4781987-03-18018 March 1987 Errata to Rev 2 to Reload Core Analysis Methodology Overview Project stage: Other ML20205D7801987-03-23023 March 1987 Forwards Proprietary Info on Cycle 11 Core Reload Methodology,Including List of CESEC-III Basedeck Input Data descriptions,plant-specific Model Values & Specific Input Data.Info Withheld (Ref 10CFR2.790(b)(1)) Project stage: Other ML20206A6261987-03-30030 March 1987 Advises That Proprietary Rev 1-P to CEN-347 (O)-P, Omaha Batch M Reload Fuel Design Rept, Will Be Withheld (Ref 10CFR2.790),per 870126 Request & C-E 870126 affidavit.C-E Reasons for Withholding Document from Public Listed Project stage: Other ML20206G8511987-04-0303 April 1987 Forwards Safety Evaluation Re 861117,870126,0309 & 18 Ltrs Concerning Changes to Listed Reload Core Methodology Repts for Cycle 11.Changes Acceptable Project stage: Approval ML20206G8671987-04-0303 April 1987 Safety Evaluation Re 861117,870126,0309 & 18 Ltrs Concerning Changes to Listed Reload Core Methodology Repts for Cycle 11.Changes Acceptable Project stage: Approval ML20206K1251987-04-14014 April 1987 Informs That 861117 & 870309 Requests for Withholding Identified Documents from Public Disclosure Granted Project stage: Other ML20206K5721987-04-15015 April 1987 Notifies of Determination That Util CESEC-Code Basedeck Listing Should Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended,In Response to Util 870323 Request & Supporting Affidavit Project stage: Other 1987-01-26
[Table View] |
Text
.
Omaha Public Power District 1623 Harney Omaha. Nebraska 68102 2247 402!536-4000 March 23, 1987 LIC-87-180 Mr. Ashok C. Thadani, Project Director PWR Project Directorate #8 Division of PWR Licensing - B Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
References:
1.
Docket No. 50-285 2.
"0 PPD Nuclear Analysis Reload Core Analysis Methodology, Transient and Accident Analysis Methods and Verification", OPPD-NA-8303-P, Rev. 01, November 1986
Dear Mr. Thadani:
SUBJECT:
Additional Information on Cycle 11 Core Reload Methodology Attachment I contains the Fort Calhoun Station Cycle 11 CESEC-III basedeck which is being submitted to support your review of Reference 2.
The in-tormation consists of a listing of the basedeck input data descriptions, the plant specific model values and Cycle 11 specific input data.
It should be noted that the CESEC basedeck is updated every cycle to accommo-date changes in the fuel reload pattern and plant modifications (if any). contains information excerpted from the analysis evaluating the Cycle 11 changes.
These changes in plant operating characteristics are either reflected as changes to the basedeck or used as case specific input data for the various transients.
Please note that this submittal contains client specific information and methods which have been designated proprietary by Combustion Engineering, Inc.
8703300484 870323
/
\\
PDR ADOCK 05000285
\\
i p
PDR q
_ = = -
j
Mr. Ashok C. Thadani March 23, 1987 Page Two If you require any additional information, please contact us.
Sincerely, N' 2 R. L. Andrews Division Manager Nuclear Production RLA/bjb c:
LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Ave., N.W.
Washington, D.C.
20036 Mr. W. A. Paulsen, NRC Project Manager Mr. P. H. Harrell, NRC Senior Resident Inspector Attachments
(
i T'
.,:=
BEFORE THE UNITED STATES NUCLEAR'REGULkTORYCOMMISSION In the matter of
)
)
OMAHA PUBLIC POWER DISTRICT
)
Docket No. 50-285 (Fort Calhoun Station,
)
Unit No. I)
)
APPLICATION FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE Pursuant to Section 2.790(b)(I) of _ the regulations of the Nuclear Regulatory Commission ("the Commission"), Omaha Public Power District ("the District")
submits this application to withhold certain information from public dis-closure. - Applicant has obtained this information from documents which identify this information as being owned by Combustion Engineering, Inc. (CE).
It is the opinion of CE that the information in question contains trade secrets and/or privileged or confidential commercial or financial information.
The CE information was purchased by the District under e proprietary information agreement.
The information for which proprietary treatment is-sought is contained in the 7
following document:
CESEC III code basedeck listing which includes the input data description and the Fort Calhoun Station model input data valid for Cycle II.
These documents have been appropriately designated as proprietary.
e
i
-2.
~This information was obtained by the District from documents for which CE has executed affidavits which set forth the bases on which the information may be withheld from public disclosure by the Commission.
Respectfully Submitted, OMAHA PO IC OWER DISTRICT By R. L. Andrews Division Manager Nuclear Production Sworn to before me on this M
R3 day of March 1987 GENEAAL NTA8f*0tsee of Esbegehe us,VA L EVAIIS g m, c.... sie. S-11-BB 1H kl%\\D
\\
N6tsry
.