Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203J177 + (ML20203J177)
- ML20203J182 + (ML20203J182)
- ML20203J184 + (ML20203J184)
- ML20203J185 + (ML20203J185)
- ML20203J186 + (ML20203J186)
- ML20203J190 + (ML20203J190)
- ML20203J191 + (ML20203J191)
- ML20203J193 + (ML20203J193)
- ML20203J194 + (ML20203J194)
- ML20203J196 + (ML20203J196)
- ML20203J198 + (ML20203J198)
- ML20203J199 + (ML20203J199)
- ML20203J202 + (ML20203J202)
- ML20203J206 + (ML20203J206)
- ML20203J209 + (ML20203J209)
- ML20203J211 + (ML20203J211)
- 05000346/LER-1986-025, :on 860701,review of Tech Spec 3.3.3.8 Revealed Four Differences Between Installed Fire Detection Zones & Operability Requirements.Caused by Personnel Error.Fire Watch Established + (ML20203J213)
- NG-97-2035, Submits Revised Evaluation of Change Per 10CFR50.92.Revs Do Not Alter Conclusion That Proposed Operating License Amend Will Not Involve Significant Hazards Consideration + (ML20203J214)
- ML20203J216 + (ML20203J216)
- 3F1297-45, Confirms Mode 2 EOP Issues Discussed W/Nrc Region II Mgt on 971215,as Result of EOP Insps Conducted at Facility During Weeks of 971020 & 1208.Info Will Be Available to NRC by 980105.List of Commitments Attached + (ML20203J217)
- ML20203J223 + (ML20203J223)
- ML20203J224 + (ML20203J224)
- ML20203J225 + (ML20203J225)
- ML20203J226 + (ML20203J226)
- ML20203J227 + (ML20203J227)
- ML20203J230 + (ML20203J230)
- ML20203J232 + (ML20203J232)
- ML20203J233 + (ML20203J233)
- ML20203J236 + (ML20203J236)
- 05000461/LER-1997-029, :on 971113,failure to Follow Plant Procedure When Erecting Scaffold Resulted in SR Area Cooler Becoming Inoperable Due to Seismic Qualification Concerns.Caused by Failure to Follow Plant Procedure.Modified Scaffold + (ML20203J237)
- ML20203J239 + (ML20203J239)
- ML20203J240 + (ML20203J240)
- ML20203J243 + (ML20203J243)
- ML20203J244 + (ML20203J244)
- ML20203J246 + (ML20203J246)
- CY-98-001, Transmits Util Response to NRC Bulletin 94-001, Potential Fuel Pool Drain Down Caused by Inadequate Maint Practices at Dresden,Unit 1, + (ML20203J247)
- ML20203J248 + (ML20203J248)
- ML20203J249 + (ML20203J249)
- ML20203J250 + (ML20203J250)
- ML20203J252 + (ML20203J252)
- ML20203J254 + (ML20203J254)
- ML20203J258 + (ML20203J258)
- ML20203J259 + (ML20203J259)
- ML20203J260 + (ML20203J260)
- ML20203J261 + (ML20203J261)
- ML20203J262 + (ML20203J262)
- ML20203J263 + (ML20203J263)
- 05000483/LER-1986-026, :on 860707,Tech Spec Surveillance of Large Stationary 125-volt Batteries Not Performed.Caused by Personnel Error.Personnel Reminded of Weekly Surveillance Responsibilities + (ML20203J267)
- ML20203J268 + (ML20203J268)
- ML20203J269 + (ML20203J269)
- ML20203J270 + (ML20203J270)