Requests Revised Response to IE Bulletin 85-003 Re motor- Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings.Response Should Include Description of Program for Maintaining Switches
ML20203J240
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 07/29/1986
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Radford Converse
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
References
IEB-85-003, IEB-85-3, NUDOCS 8608050213
Download: ML20203J240 (2)


Text

,

29 JUL 1966 Docket No. 50-333 Power Authority of the State of New York James A. FitzPatrick Nuclear Power Plant ATTN: Mr. Radford J. Converse Resident Manager P. O. Box 41 Lycoming, New York 13093 Gentlemen:

Subject:

Revised Response to IE Bulletin 85-03 IE Bulletin 85-03, Motor Operated Valve Common Mode Failures During Plant Transients Due To Improper Switch Settings, November 15, 1985, requested a response concerning each licensee's program for selecting, setting and maintaining the switches of the motor-operated valves in the high pressure coolant injection / core spray and emergency feedwater systems.

Your response, letter JAFP-86-0437 dated May 14, 1986, although indicating that a program to accomplish items (b) through (d) of the Bulletin exists, did not supply the program as requested. Accordingly, please submit a revision to your response to IE Bulletin 85-03 which includes a detailed description of your facility's program for selecting, setting and maintaining the switches on the motor operated valves identified in item (a). Additionally, include a synopsis of your program for demonstrating operability of each valve by testing according to item (c), whether or not testing can be accomplished at present.

Please provide your revised response within 30 days of receipt of this letter.

MW Siamed q Richard W. Starostecki, Director Division of Reactor Projects cc w/ enc 1:

L. W. Sinclair, President J. P. Bayne, First Executive Vice President and Chief Operations Officer A. Klausmann, Vice President - Quality Assurance and Reliability R. L. Patch, Quality Assurance Superintendent George M. Wilverding, Chairman, Safety Review Committee Gerald C. Goldstein, Assistant General Counsel NRC Licensing Project Manager Dept. of Public Service, State of New York Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of New York 0FFICIAL RECORD COPY IE BULLETIN - STAIR - 0001.0.0 8608050213 860729 07/18/86 PDR ADOCK 05000333 h () l 0

PDR

e New York Power Authority 2

g $86 bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP Robert J. Bores, DRSS R. J. Kiessel, IE E. L. Jordan, Director, I&E Cliff Anderson H. KISWA g WGalavGG(