_ _ _ _ _ _ - - _ - _ _ - _ _ - _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - - _ _ _ _ _ _
et CSEC A Clobal Energy Company JAuss H. MILLER Dm: (301) ss4 330s Vice PRESIDENT, PRODUCTION fax: (301)571 8279 February 25,1998 GDP 98 0031 Dr. Carl J. Paperiello Director, Office of Nuclear Material Safety and Safeguards Attention: Document Control De.k U.S. Nuclear Regulatory Commission Washington, D.C. 20555 0001 Paducah Gaseous Diffusion Plant (PGDP)
Docket No. 70 7001 Request for Enforcement Discretion
Dear Dr. Paperiello:
Pursuant to discussions held between USEC and NRC on February 23 and 24,1998, the purpose of this letter is to request enforcement discretion associated with the potential consequences of postulated seismically induced failures in the liquid withdrawal facilities (i.e. Buildings C.
310/310A and C 315). The enforcement discretion is necessary to allow continued operation pending the development and submittal for NRC approval of a Certificate Amendment Request to address this concern.
USEC letter GDP 981013 dated February 20,1998 (see Enclosure 1), notified NRC that the potential exists for higher volumes ofliquid UF. in the C 301/310-A and C-315 liquid withdrawal systems including the condensers, accumulators, and connecting piping. Therefore, the consequences of postulated seismic failures currently reported in Chapter of the Application Safety Analysis Report (SAR) and Compliance Plan Issue 36 may be increased. The reference USEC letter further describes the compensatory actions that USEC has taken to restrict plant operations to compensate for the potential increase in the release ofliquid UF. as a result of postulated seismic failures in the C-301/310 A and C 315 withdrawal areas.
9003040000 900225 PDR ADOCK 07007001
', [
l C
pq
,u I
6903 Rockledge Drive. Bethesda MD 208.1 1818 M')L Telephone 301564 3:00 Fu 301564 3201 http://www.usec.com
/
OtTices in thermore. CA Paducah, KY Pommouth. OH Lhington. DC
,i Dr. Carl J. Paperiello February 25,1998 GDP 98-0031 Page 2 As requested by NRC, during the conference call on February 24,1997. Enclosure 2 to this letter is a Justification for Continued Operation. Enclosure 3 to this letter provides thejustification for enforcement discretion as required by NRC Inspection Manual Chapter 9900, " Operations -
Notice of Enforcement Discretion for Gaseous Diffusion Plants."
. Should you have any questions regarding this matter, please contact Larry Jackson at (502) 441-6796 or Steve Routh at (301) 564 3251. Commitments contained in this submittal are identified in Enclosure 4.
Since4ely, l
h.ba L
J, es H. Miller
/ ice President, Production
Enclosures:
- 2. Justification for Continued Operation
- 3. Justification for Request for Enforcement Discretion
- 4. List of Commitments cc:[Nd6DEMCoidiol Desli']"
NRC'Resi6n 111 Office' ~."
NRC Resident inspector PODP Mr. Robert C. Pierson, NRC HQ Mr. Randall M, DeVault, DOE
_._________d
FNCLOSURE1 GDP 98-0031 USEC Letter GDP 981013 Dated February 20,1998