Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203A765 + (ML20203A765)
- ML20203A766 + (ML20203A766)
- 05000423/LER-1998-004, :on 980114,EDG Intercoolant Coolers Were Not Capable of Meeting Design Criteria.Caused by Inadequate Implementation of GL 89-13 Section II Testing.Diesels Operability in Modes 5 & 6 Was Documented Via CAP + (ML20203A767)
- U-603141, Constitutes Utils Final Response to Reporting Requirements Specified by GL 96-01, Testing of SR Logic Circuits. Completion of Requested Actions,Confirmed + (ML20203A769)
- ML20203A770 + (ML20203A770)
- ML20203A771 + (ML20203A771)
- ML20203A772 + (ML20203A772)
- ML20203A773 + (ML20203A773)
- ML20203A776 + (ML20203A776)
- ULNRC-03735, Forwards Rev 10 to Callaway Cycle 9 COLR, Providing Updated Modified Rod Insertion Limits for Cycle 9.Rept Submitted Per TS 6.9.1.9 + (ML20203A777)
- ML20203A778 + (ML20203A778)
- ML20203A779 + (ML20203A779)
- ML20203A781 + (ML20203A781)
- ML20203A788 + (ML20203A788)
- ML20203A789 + (ML20203A789)
- 05000245/LER-1998-001, Forwards LER 98-001-00,re Event Which Occurred on 980109 at Millstone Unit 1.Commitments Made within Ltr,Encl + (ML20203A791)
- ML20203A793 + (ML20203A793)
- ML20203A795 + (ML20203A795)
- ML20203A796 + (ML20203A796)
- ML20203A797 + (ML20203A797)
- 05000263/LER-1986-008, :on 860307,isolations of Reactor Bldg Ventilation Sys & Initiations of Standby Gas Treatment Sys Occurred.Caused by Spurious hi-hi Trip from Channel B Gas Monitor.Test Switches Will Be Installed + (ML20203A798)
- ML20203A805 + (ML20203A805)
- ML20203A806 + (ML20203A806)
- ML20203A808 + (ML20203A808)
- ML20203A809 + (ML20203A809)
- ML20203A811 + (ML20203A811)
- ML20203A812 + (ML20203A812)
- ML20203A813 + (ML20203A813)
- ML20203A814 + (ML20203A814)
- ML20203A817 + (ML20203A817)
- ML20203A819 + (ML20203A819)
- 05000245/LER-1998-001-02, :on 980109,MRP Determined That There Have Been Periods During Power Operation When Backup Pressure Regulator Was Oos.Caused by Inadequate Understanding of Safety Analysis.Evaluation Will Be Performed + (ML20203A820)
- ML20203A822 + (ML20203A822)
- ML20203A824 + (ML20203A824)
- ML20203A826 + (ML20203A826)
- ML20203A829 + (ML20203A829)
- ML20203A831 + (ML20203A831)
- 05000483/LER-1998-002, :on 980115,determined That Missile Shield Had Not Been Closed During Past Eight Refueling Outages.Caused by TS Failing to Address Missile Shield During Refueling Outages.Developed Administrative Controls + (ML20203A832)
- ML20203A834 + (ML20203A834)
- ML20203A836 + (ML20203A836)
- ML20203A837 + (ML20203A837)
- ML20203A839 + (ML20203A839)
- ML20203A840 + (ML20203A840)
- ML20203A841 + (ML20203A841)
- ML20203A842 + (ML20203A842)
- ML20203A843 + (ML20203A843)
- ML20203A844 + (ML20203A844)
- PNO-II-97-062, on 971211,licensee Reported That Between Apr 1995 & Jul 1996 Nine Misadministrations Involving Sr-90 Eye Applicator Occurred,As Result of Apparent Incorrect Decay Calculation of Source.Commonwealth of Pr Will Be Notified + (ML20203A847)
- 05000265/LER-1986-004-06, :on 860314,HPCI Turbine Tripped Due to Turbine Exhaust Pressure Switch 2-2368A Failure.Caused by Corroded Seals in Pressure Switch Allowing Moisture in Casing.Switch Replaced + (ML20203A848)
- ML20203A850 + (ML20203A850)
- ML20203A851 + (ML20203A851)