Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- A97061, Informs NRC of Rev to NOV Commitment Made in Responding to Violations Noted in Insp Repts 50-295/96-06 & 50-304/96-06.Test Requirements Are Now Assigned from post- Maint Testing Matrix During Work Planning Effort + (ML20199L025)
- ML20199L026 + (ML20199L026)
- B17590, Application for Amend to License DPR-65,removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys, from Plant TS + (ML20199L027)
- ML20199L028 + (ML20199L028)
- PNO-I-86-049, on 860706,18-inch Piece of Blading from Low Pressure Turbine 31 Broke Off During Main Generator Startup. Turbine Vendor Evaluating Damage.Repair Expected to Take at Least 1 Wk + (ML20199L029)
- PNO-I-86-048, on 860704,unscheduled Reactor Shutdown Occurred Due to Increasing Unidentified Drywell Leakage.Caused by Packing Leak on Manual LPCI Injection Valve.Manual Valve Backseated.Startup Planned for 860711 + (ML20199L034)
- ML20199L035 + (ML20199L035)
- ML20199L037 + (ML20199L037)
- ML20199L038 + (ML20199L038)
- ML20199L039 + (ML20199L039)
- ML20199L040 + (ML20199L040)
- ML20199L041 + (ML20199L041)
- ML20199L043 + (ML20199L043)
- ML20199L044 + (ML20199L044)
- ML20199L046 + (ML20199L046)
- ML20199L048 + (ML20199L048)
- ML20199L049 + (ML20199L049)
- ML20199L050 + (ML20199L050)
- ML20199L051 + (ML20199L051)
- ML20199L052 + (ML20199L052)
- ML20199L054 + (ML20199L054)
- ML20199L055 + (ML20199L055)
- RBG-44325, Notifies That Actions Associated W/Resolution of Thermo-Lag Issues at Plant Completed,Per GL 92-08.First Phase Completed by Development of Revised Safe Shutdown Analysis + (ML20199L057)
- ML20199L058 + (ML20199L058)
- ML20199L059 + (ML20199L059)
- ML20199L060 + (ML20199L060)
- ML20199L062 + (ML20199L062)
- ML20199L063 + (ML20199L063)
- ML20199L065 + (ML20199L065)
- B12020, Summary of Results of Haddam Neck Probabilistic Safety Study + (ML20199L066)
- ML20199L068 + (ML20199L068)
- 05000443/LER-1998-014, Forwards LER 98-014-00 for Event That Occurred at Seabrook Station on 981222.Encl 2 Is List of Util Commitments Made in Response to LER + (ML20199L069)
- ML20199L070 + (ML20199L070)
- ML20199L071 + (ML20199L071)
- ML20199L072 + (ML20199L072)
- ML20199L073 + (ML20199L073)
- ML20199L074 + (ML20199L074)
- ML20199L076 + (ML20199L076)
- ML20199L077 + (ML20199L077)
- ML20199L078 + (ML20199L078)
- 3F1197-51, Provides Addl Info Requested by NRC During 971119 Telcon Re LAR 218 on Rev of Makeup Sys Letdown Line Failure Accident Analysis + (ML20199L079)
- ML20199L080 + (ML20199L080)
- ML20199L081 + (ML20199L081)
- ML20199L083 + (ML20199L083)
- NSD-NRC-97-5446, Forwards Floppy Disk Containing AP600 Site Meteorological Data for Use in ARCON96 Code & Table Containing Summary of Calculated Dispersion Factors Resulting from Data.W/O Floppy Disk + (ML20199L086)
- ML20199L087 + (ML20199L087)
- ML20199L088 + (ML20199L088)
- ML20199L089 + (ML20199L089)
- ML20199L090 + (ML20199L090)
- ML20199L091 + (ML20199L091)
- ML20199L092 + (ML20199L092)