{{#Wiki_filter:f. "-~ NtiLAi tD CORRES*0N' tM/4 4 a o DOCgf0 UNITED STATES OF AMERICA USN C NUCLEAR REGULATORY COMMISSION before the 'O f,.g ATOMIC SAFETY AND LICENSING BOf I g Dih;ge.': Uicj ) In the Matter of ) ) TEXAS UTILITIES ELECTRIC ) Docket No. 50-445-CPA COMPANY, et al. ) ) (Comanche Peak Steam ) Electric Station, Unit 1) ) ) ) SUPPLEMENTAL RESPONSE OF TEXAS UTILITIES ELECTRIC CO., et al. TO INTERROGATORIES AND REQUESTS FOR DOCUMENTS FILED BY MEDDIE GREGORY UNDER DATE OF MAY 15, 1986 Interrogatory No. 1: 1. Identify all documents upon which Applicants intend to rely to demonstrate that there was a " good cause" for the delay in completion of construction of Unit 1. Supplemental Answer: Applicants currently believe that the documents listed on Attachment A hereto provide part of the basis for their belief about the cause for the delay that prevented Applicants from completing their plant, in a condition where an operating license could be issued, by August 1, 1985. 9607090307 860703 ~' PDR ADOCK 05000445 0 PDR i l L
Interrogatory No. 3: 3. Identify all audits, reviews, diagnoses, evaluations, consultant reports, in-house audits, or other reports which Applicants received from the beginning of construction to the present assessing, analyzing, commenting on, discussing, or offering an opinion on the plant's construction, procedures, compliance with industry or agency standards, or management style or competence. (This should include all source documents listed in Appendix B to CASE's Request for Imposition of Fine, Suspension of Construction Activities, and Hearing on Application to Renew Construction Permit 1/31/86.) Supplemental Answer: Applicants currently believe that the items set forth on Attachment B hereto comprise all the requested documents which might reflect upon their ability to complete construction of the safety-related systems, structures and components of CPSES Unit 1 within the time provided by the construction permit. - -
JUL 3 '86 16:56 LICENSING-TUGC0 PAGE.02 Signatures As to Answers: I, L. Ed Powell, being first duly sworn, do depose and say that I am the Exocutive Accictant to the Vice Precident of Texas Utilities Generating Company ("TUGCO"), that I am familiar with the information contained in the TUGCO files, that I have assisted in the preparation of the foregoing answers, and that the foregoing answers are true, except insofar as they are based on information that is available to TUGCO but not within my personal knowledge, as to which I, based on such information, believe them to be true. _.,~~. y w _. ,8 J. Pd a wt\\
- /- N.
i j., W L. Ed Powell N .-/,. Sworn,tn.deforemethis f# *3t'd' dav of July, 1986: A Notary Pubiic My Commission Expires: JK/@d / /h((.
ATTACHMENT A 18, 1984. Comanche Peak Technical Review Team Letter - September 19, 1984. Comanche Peak Technical Review Team Letter - November Comanche Peak Technical Review Team Letter - January 8,1985. Safety Evaluation Report - Related to the Operation of CPSES Units 1 & 2: Supplement 6 - November,1984 Supplement 7 - January, 1985 l Supplement 8 - February,1985 Supplement 9 - March, 1985 Supplement 10- April, 1985 i Supplement 11-May, 1985 Supplement 12-October, 1985 Supplement 13-May, 1986 Special Investigation Team (Messrs. J. I. Tapia, R. C. Taylor, Dr. J. R. N. 15, 1983 Rajan, Dr. W. P. Chen) - February (SALP) Board Reports - Systematic Assessment of Licensee Performance November 12, 1980 December 3, 1982 4 April 1,1982 May 16, 1984 Cygna Phase I & II Independent Assessment Program Final Report - TR-83090-01, Revision 0, Cygna Phase III Independent Assessment Program Final Report - 4 Vo July 16, 1984. CPSES - Design & Construction - Self-Initiated Evaluation (INP0) - October 1982. Construction Appraisal Inspection (CAT) 50-445/83-18, 50-446/83-12 Apr 1983. Notica of Caseload Forecast Team Meeting and Site 'lisit to Assess Construction Completion Schedule - CPSES Unit 1 - April, 1984. CPSES Plan for the Completion of Outstanding Regulatory Actions - M Report of CPSES Intimidation Panel - Detober, 1985. Motion for Authorization to Issue a License to Load Fuel an Precritical Testing 50.57(c) & Supplement - August 8,1984. 13, 1984. CPSES Special Review Team Report - July 19, 1984 filed by Letter Acknowledging Receipt of Petition - MarchCovernme
Technical Review Team Briefing - CPSES Review - September 18, 1984. Meeting with TUGC0 and NRC/ Technical Review Team - October 19, 1984. Meeting with TUGC0 and NRC/ Technical Review Team - October 23, 1984. Memorandum & Order (Quality Assurance for Design) - December 28, 1983. Texas Utilities CPRT Meeting - Cygna Energy Services in San Francisco - March 14. 1985 and May 21, 1985. Applicants' Statement of Continuing Intent co Withdraw Motions for Summary Disposition - December 6, 1985. Generie Tssues Summary - March 29, 1985. Applicants' Current Management Views and Management Plan for Resolution of All Issues - June 28, 1985. Transcript and Draft Report of Telodyne Engineering Services, Donald F. Landers to Vincent S. Noonan - February 21, 1985. Transcript on Meeting with TUGCO Concerning the Motion for Summary Disposition on QA/QC Program for Design of Piping & Pipe Supports for Comanche Peak - January 15, 1985. A - - - = - - ~ - - - - - - * - ~
ATTACHMENT B S & L REPORT: "SELF-INITIATED EVAL. OF DESIGN & CONSTRUCTION OF CPSES" IABBIN REPORT: " REVIEW OF QA PROG. FOR THE DESIGN AND CONSTRUCTION OF CPSES" B & R HONTNLY CONSTRUCTION PROGRESS REPORTS CPSES STATUS REPORTS SER AND ALL SSERS PSAR QA SERVICES ENGINEER. STAFF REPORT ON FSAR COMPLIANCE VERIF. PROG. FOR VARIOUS SYSTEMS NRC INSPECTION REPORTS TUGCO QA AUDIT REPORTS l COPY OF KAHLER/SPANGLER/KEELEY QC INSPECTOR INTIMIDATION REPORT SPECIAL REVIEW TEAM REPORT GROUP AUDIT REPORTS COMANCME PEAK REVIEW TEAM REPORT AND RECOMMENDATIONS i TMI INVESTIGATION ENGINEERING COMMITTEE REPORT REPORT FROM TECNNICAL SUPPORT GROUP RE: TMI RELATED ITEMS TNE PROGRESS REPORTS QUARTERLY QA TREND REPORTS FSAR FINAL REPORT--REVISED PROCEDURES FOR DOCUMENT CONTROL CENTER CPSES FSAR VERIF. ACTIVITIES STATION SERVICE NATER SYSTEM
SUMMARY
REPORT PRELIMINARY SYSTEM ASSESSMENT REPORT FSAR COMMITMENTS FSAR COMPLIANCE VERIFICATION STATION SERVICE WATER PRELIMINARY SYSTEM ASS. REPT. PRELIMINARY SYSTEM ASSESSMENT REPORT FSAR COMPLIANCE OF SERVICE WATER SYSTEM FSAR COMPLIANCE VERIFICATION PROG. STATION SERVICE WATER SYSTEM ASS. REPT. MONTHLY ACTIVITY REPORTS FOR B&R QA ACTIVITIES ON CPSES. QA SERVICES SURVEILLANCE MONTHLY ACTIVITY REPORTS SITE SURVEILLANCE MONTHLY ACTIVITY REPORTS WEEKLY AS-BUILT STATUS REPORT BACKFIT AND CONDUIT SUPPORT STATUS STATUS REPORT ASME DOCUMENTATION BACKLOG PSI SURVEILIANCE INTERIM STATUS REPORT CORRECTIVE ACTION REPORT CORP. CONSULTING & DEVELOPMENT CO. REPORT RE: EVALUATION OF NON-CONFORMING WELDS QA/QC STAFFING SHORTFALIA ANALYSES BROOKHAVEN NATIONAL LAB REPORT ON PROTECTIVE C0ATINGS SOUTHERN ENGINEERING REPORTS FOR TEX-IA AND BRAZOS COPY OF 1978 MAC REPORT ON QA WESTINGHOUSE PMG AUDIT (10-81) EMERSON CONSULTANTS FINAL REPORT OF 4/79 & 80 SAMPLING STUDIES i l
QUANTITY ANALYSIS REPTS DCC FILE CUSTODIAN QUARTERLY AUDIT REPORT CYGNA IAP REPORT SIT REPORT MEMOS & ANAYSIS JUSTIFYING AUTOMATIC WELDING PROGRAM SALP REPORTS THE DRAWINGS UPDATE ACTIVITIES REPORT TRT REPORTS NRC TREND ANALYSES ASME SURVEY DOCUMENTATION CAT REPORT EGEG REPORT DUKE POWER REVIEW OF TUGCO NUCLEAR ENGINEERING MUENOW AND ASSOCIATES - EVALUATION OF CONCRETE IN UNIT 1 DOME UNIT 2 MUENOW AND ASSOCIATES - EVALUATION OF REFUELING POOL STRUCTURE, EBASCO ANALYSIS OF QA RECORDS MANAGEMENT SYSTEMS 1985 INPO CONSTRUCTION PROJECT EVALUATION NATIONAL BOARD OF BOILER AND PRESSURE VESSEL INSPECTORS AUDITS HARTFORD STEAM BOILER INSPECTION AND INSURANCE COMPANY AUDITS SITE QUALITY STATUS REPORT 3 TRAINING REPORT STATUS QUALITY OPEN ITEMS REPORT NCR'S REQUEST FOR INFORMATION/ CLARIFICATION FIELD DEFICIENCY REPORT DESIGN DEFICIENCY REPORT CORRECTIVE ACTION REPORT DEVIATION REPORT SURVEILLANCE REPORTS / DALLAS & SITE INSPECTION REPORTS EXIT INTERVIEWS RECEIVING INSPECTION REPORTS QUALIFICATION REPORTS (IEEE) AUDITS BY B&R SIS REPORTS BY HARTFORD ERLIN NIME REPORT SIGNIFICANT DEFICIENCY ANALYSIS REPORTS SAFETEAM REPORTS QA INVESTIGATIONS (QAI'S) HOT LINE INVESTIGATIONS SECURITY INVESTIGATIONS PIPE SUPPORT ENGINEERING REPORT (BY EDS) DEFICIENCY REVIEW REPORT SN'S CREN AUDIT REPORTS REPORTS PREPARED FOR AND SUBMITTED WITH MOTIONS FOR AFFIDAVITS FILED IN LICENSING PROCEEDING MAC REPORTS OF BROWN & ROOT ,---n m@~
REPORT ON STONE & WEBSTER REPORT ENGINEERING CORPORATION'S EVALUATION AND RESOLUTION OF GENERIC TECHNICAL ISSUES (CPSES) T-SHIRT REPORT OFFICE OF INVESTIGATION REPORTS COMPREHENSIVE ACTION LIST DALIAS CAR'S PULL OUT TEST ON REBARS & BOLTS. RW HUNT CO. REPAIR OF OMITTED, MISPLACED AND BROKEN REBARS. GIBBS & HILL CEILCOTE 654-N GROUT HIGH TEMPERATURE COMPRESSIVE TESTING ESCOWELD GROUT 7502 STRUCTURAL BOLTING NATERIAL TORQUE / TENSION TEST CORREIATION A490 & A354 GRADE BD BOLTS STRUCTURAL BOLTING MATERIAL TORQUE / TENSION TEST CORRELATION - 1/2" DIAMETER NELSON STUD TENSION / TORQUE CORRELATION DETERMINATION OF TORQUE REQUIREMENTS FOR EXPANSION ANCHORS GROUTED THREADED ROD PULL TESTS ONE-HOLE CIAMP TEST REPORT DETERMINATION OF ICAD CAPACITY FOR UNISTRUT BRACKET (WELDED FOOT HANGER) P2542 THRU P2546 i 1 1/2" RICHMOND INSERT SHEAR TESTS EYENUT CAPACITY TESTS EVALUATION OF NICOPRESS SLEEVE CAPACITY FOR AS-BUILT CONDITION IN UNIT 1 & 2 CONTROL ROOMS 1 1/2" & 1" RICHMOND INSERTS. SHEAR AND TENSION TESTS OVAL "M" AND OVAL "B4" NICOPRESS CAPACITY TESTS SEISMIC QUALIFICATION TEST REPORT OF CONDUIT SUPPORT SYSTEMS A REVIEW OF THE PERFORMANCE OF SUSPENDED CEILINGS IN EARTHQUAKES & ITS APPLICATION TO THE CONTROL CEILING OF THE CPSES THE APPLICATION OF SEISMIC EXPERIENCE DATA TO ARCHITECTURAL FIXTURES AT THE CPSES j AUDITS BY STONE & WEBSTER FINAL REPORT = DAMAGE STUDY REVIEW (EBASCO) REVIEW OF SUB COMPARTMENT PRESSURE / TEMPERATURE ANALYSIS (EBASCO) UPS AREA AIR CONDITIONING SYSTEM - DAMAGE STUDY FIRE HAZARDS (EBASCO) ENFORCEMENT ACTIONS FORM 8-K PROVIDED TO SEC ON CPSES NRC YELIDW BOOK SAFETY EVALUATION OF CPSES UNITS 1 & 2 U.S. AEC, 9/3/74 NRC ADVISORY COMMITTEE ON REACTOR SAFEGUARDS TO NRC CHAIRMAN PALLADINO l
SUBJECT:
REPORT ON COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 REPORT BY DREXEL BURNHAM IAMBERT INC. RE: A COMPARISON OF NUCLEAR POWER i PIANT PROJECTS USING NRC SALP REPORTS. NRC'S CASEI 4AD FORECAST TEAM STUDY OF CPSES ANCO CABLE TRAY TEST REPORT .i SEISMIC QUALIFICATION UTILITY GROUP (SQUG) EQUIPMENT QUALIFICATION PROGRAM i (CONCRETE EXPANSION ANCHOR TEST DATA COLLECTED BY EPRI) l DESIGN REVIEW AND QUALITY REVALIDATION REPORT BY TDI DIESEL GENERATOR 1 OWNERS GROUP TUGCO QA MANAGEMENT REVIEW BOARD REPORTS (1979 SURVEYS) STONE & WEBSTLR MONTHLY PROJECT PROGRESS REPORT STONE & WEBSTER POSITION PAPER ON VISUAL INSPECTION OF SUPPORT WELDS TUGCO RESPONSE TO TRT FINDINGS TUGCO NUCLEAR ENGINEERING DESIGN DEFICIENCY REPORT (TDDR) DEVIATION NOTICES
,w w-n-,-w-,
-,e-. -,---w- - - ---_ma,--,,e__,---ww -,-------n--m--w---- -. - - - -. _ _--- -
PMCS QUARTERLY REPORT U2 WEEKLY STATUS REPORT U2 SCHEDULE REVIEW MONTHLY MANAGER STATUS REPORT U1 STATUS REPORT FIRE PROTECTION PROGRAM REVIEW APPENDIX R AUDIT REPORT THERMOLAG FIELD VERIFICATION WALKDOWN PLANT SURVEILANCE REPORTS HARTFORD 93988 N-3 DATA REPORT N-5 DATA REPORTS EBASCO HVAC ASSESSMENT CIRCULATING WATER INTAME STRUCTURE VORTEXING MANITOWOC STUDY ON MAJOR LIFTS CONSTRUCTION OPERATIONAL TRAVELERS ON MAJOR LIFTS GIBBS & NILL STATUS REPORTS NRC AUDITS OF VENDORS G&H NY QUARTERLY QA TREND ANALYSIS 5 10CFR PART 21 REPORTS G&H NY REPORT ON SUMP PERFORMANCE AFTER A I4CA G&H NY EVALUATION OF CONCRETE IN UNIT 1 DOME G4H NY EVALUATION OF CONCRETE IN SG COMPARTMENT U2 VENDOR AND SURVEILLANCE REPORTS ASSESSMENT OF UNIT 2 ENGINEERING / CONSTRUCTION /STARTUP IAGIC UNIT 2 SCHEDULE, IMPLEMENTATION AND PROGRESS REPORTING EVALUATION OF DAMAGE STUDY PROGRAM FOR COMANCHE PEAK -- FIRE PROTECTION DESIGN, JET IMPINGEMENT ANALYSIS / PROTECTION DESIGN, CIASS 5 PIPE / TRAIN C SEISMIC DECLASSIFICATION PROGRAM COMANCHE PEAK CALIBRATION REPORT FOR QC PROGRAMS COMANCHE PEAK REPORT ON QUALITY STANDARDS & PRACTICES FOR CONSTRUCTION, M&TE CALIBRATION IARGE BORE FIELD WALEDOWN REPORT CPPP-5 SMALL BORE WALKDOWN REPORT PIPING AND SUPPORT SYSTEM ENGINEERING WALKDOWN FINAL REPORT SEISMIC ANALYSIS VERIFICATION STUDY PRE-INPO EVALUATIONS
SUMMARY
OF SURVEILLANCE ACTIVITIES SCHEDULE OF SURVEILIANCE ACTIVITIES SITE QA ACTIVITY
SUMMARY
WEEKLY ACTIVITY REPORT EXECUTIVE SUMMARIES BY IARRY PLATT FOR DCC TNE INTERNAL SURVEILIANCES FOR ADHERANCE TO PROCEDURES WESTINGHOUSE PROJECT EXTENSION ENGINEERING LOG GEM ACTION ITEMS LIST UNIT 1 & 2 LESSONS LEARNED B.R. CLEMENTS PAPERWORK ISSUES ENGINEERING BUDGET STATUS i ENGINEERING TDCR STATUS j IEC G&H OPEN ITEMS LIST WESTINGHOUSE OPEN ITEMS LIST HANGER CERTIFICATION STATUS l ENGINEERING STATUS REPORT FIELD JOB ORDER
OPEN ENGINEERING ITEMS REPORTS EVALUATION OF IE BULLETINS, CIRCULARS, NOTICES APPLICA@LE TO CPSES PMG REPORT EXPEDITING TRIP REPORTS WESTINGHOUSE OPEN ORDERS STATUS REPORT GENERAL ELECTRIC OPEN ORDERS STATUS REPORT PAPCO OPLM ORDER STATUS REPORT l WESTINGHOUSE PNG STATUS REPORT WESTINGHOUSE OWNERS GROUP REPORT DUKE POWER REPORT ON HVAC SUBCONTRACT WEEKLY STATUS REPORT BAHNSON STATUS REPORT GRINNELL STATUS REPORT i BISCO STATUS REPORT CBI STATUS REPORT j CONSOLIDATED BUSINESS PERFORMANCE REVIEW i JOURNEYMAN HELPER RATIO REPORT ASSESSMENT OF THE PRODUCTIVITY OF THE CABLE TRAY HANGER DESIGN VERIFICATION PROGRAM AT CPSES UNIT 2 EBASCO MONTHLY PROGRESS REPORTS STONE & WEBSTER PROGRESS REPORTS I IMPELL MONTHLY PROGRESS REPORTS CTH PROGRAM PRODUCTIVITY ANALYSIS - DUKE POWER CTH TRENDING - DUKE POWER VENDOR NONCONFORMANCE REPORTS COMPLETIONS GROUP DEPARTMENT MANAGEMENT SURVEY 1979 CONCRETE EVALUATION SEMI-ANNUAL PROJECT TRAINING REPORT ENGINEERING STATUS REPORT PMG EXPEDITING, PURCHASING & SUBCONTRACTS WEEKLY STATUS REPORT i ACPSI PROGRESS REPORT EBASCO TOOL CALIBRATION REPORT GEM SITE ENGINEERING REVIEW GEH AUDIT REPORTS TUGC0 MONTMLY PROGRESS REPORT PIPE HANGER STATUS PHYSICAL PERCENT COMPLETE MONTHLY REPORT PROJECT CONTROL WEEKLY REPORT BULK COMMODITY PRODUCTION ANALYSES SUSCONTRACTS STATUS REPORT HUMAN FACTORS ENGINEERING EVALUATION OF CPSE U1 STEAM ELECTRIC CONTROL ROOM HUMAN FACTORS ENGINEERING PRELIMINARY ASSESSMENT OF CP UNIT 1 CONTROL ROOM 1 SCHEDULE ALERT REPORTS METALLURGICAL EVALUATION OF 80 JOINTS OF 3/8" 0.D. CPSES DAMAGE STUDY EVALUATION OF WESTINGHOUSE ANALYZED PIPING AS-BUILT VERIFICATION PROGRAM AS-BUILT ACTION ITEM REPORT
SUMMARY
OPERATING EXPERIENCE REPORT PRIORITY WORK REPORT VENDOR DOCUMENTATION DEFICIENCY REPORT TRANSAMERICA DELAVAL INSPECTION AND MAINTENANCE REPORT ~_
PIPING ANALYSIB REPORT - DELAVAL DIESEL GENERATORS SEISMIC TEST REPORT FOR DELAVAL SEISMIC TEST REPORT ACTION TESTING CORP. SEISMIC REPORT ON 17-TON, 27-FEET SPAN OVERHEAD CRANE AND 130-TON, 67-FEET SPAN OVERHEAD CRANE FOR TUSI JORGENSEN Co. STRUT CERTIFIED MATERIAL TEST REPORT G&H MAIN HOIST REDUCER TEST REPORT SEISMIC QUALIFICATION REPORT OF 2-TON GANBRY CRANE LETDOWN HEAT EXCHANGER ANCHORS REPORT REPORT OF SEISMIC TEST ON RE REPORT OF SEISMIC TEST ON XM SEISMIC QUALIFICATION TEST REPORT FOR FLEXIBLE METAL INSTRUMENT HOSE ASSEMBLY UNC NUCLEAR INDUSTRIES ALARA DESIGN REVIEW QUALIFICATION OF CHANNELS, TEST DATA REPORTS l 1 I l
- TOTAL PAGE.07 **
CERTIFICATE OF SERVICE I, William S. Eggeling, one of the attorneys for the Applicants herein, hereby certify that on July 3, 1986, I made service of the within " Supplemental Response of Texas Utilities Electric Co. et al. to Interrogatories and Requests for Documents Filed by Meddie Gregory Under Date of May 15, 1986" by mailing copies thereof, postage prepaid, to: Peter B. Bloch, Esquire Mr. James E. Cummins Chairman Resident Inspector Administrative Judge Comanche Peak S.E.S. Atomic Safety and Licensing c/o U.S. Nuclear Regulatory Board Commission U.S. Nuclear Regulatory P.O. Box 38 Commission Glen Rose, Texas 76043 Washington, D.C. 20555 Dr. Walter H. Jordan Mr. William L. Clements Administrative Judge Docketing & Services Branch 881 W. Outer Drive U.S. Nuclear Regulatory Commission Oak Ridge, Tennessee 37830 Washington, D.C. 20555 Chairman Chairman Atomic Safety and Licensing Atomic Safety and Licensing Appeal Panel Board Panel U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Commission Washington, D.C. 20555 Washington, D.C. 20555 Stuart A. Treby, Esquire Mrs. Juanita Ellis Office of the Executive President, CASE Legal Director 1426 S. Polk Street U.S. Nuclear Regulatory Dallas, Texas 75224 Commission Washington, D.C. 20555 i
h Renea Hicks, Esquire Ellen Ginsberg, Esquire Assistant Attorney General Atomic Safety and Licensing Environmental Protection Division Board Panel P.O. Box 12548, Capitol Station U.S. Nuclear Regulatory Commission Austin, Texas 78711 Washington, D.C. 20555 _)(- Anthony Roisman, Esquire Joseph Gallo, Esquire Executive Director Isham, Lincoln & Beale Trial Lawyers for Public Justice 1120 Connecticut Avenue, N.W. 2000 P Street, N.W., Suite 611 Suite 840 Washington, D.C. 20036 Washington, D.C. 20036 Dr. Kenneth A. McCollom Mr. Lanny A. Sinkin Administrative Judge Christic Institute 1107 West Knapp 1324 North Capitol Street Stillwater, Oklahoma 74075 Washington, D.C. 20002 Ms. Billie Pirner Garde Mr. Robert D. Martin Citizens Clinic Director Regional Administrator, Government Accountability Project Region IV 1901 Que Street, N.W. U.S. Nuclear Regulatory Commission Washington, D.C. 20009 Suite 1000 611 Ryan Plaza Drive Arlington, Texas 76011 Elizabeth B. Johnson Geary S. Mizuno, Esquire Administrative Judge Office of the Executive Oak Ridge National Laboratory Legal Director P.O. Box X, Building 3500 U.S. Nuclear Regulatory Commission Oak Ridge, Tennessee 37830 Washington, D.C. 20555 Nancy Williams Cygna Energy Services, Inc. 101 California Street Suite 1000 San Francisco, California 94111 j yyD Willia 5n S. Egge g =}}