ML20199L049
| ML20199L049 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 02/02/1998 |
| From: | Mccoy C SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| RTR-REGGD-01.133, RTR-REGGD-1.133 LCV-1161, NUDOCS 9802090084 | |
| Download: ML20199L049 (1) | |
Text
_
C K.McCoy Southern Nuclear
%ce President Opersting Company. ine.
%gtle Puget 40 Invemoss Center Pa4way PO Box 1295 Dirmegbam. Alabama 35201 ic! 205 932 7122 Fex 205 932 D403 SOUTHERN A COMPANY February 2, 1998 Energy ro serre Your wid" Docket Nos. 50-424 LCV 1161 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 l
l Ladies and Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT Unit 1 CliANGE TO ALARM SETTING FOR DIGITAL METAL IMPACT MONITORING SYSTEh,1 Per the requirements of the Final Safety Analysis Report a-d Regulatory Guide 1.133,
" Loose Part Detection Program For the Primary System of Light-Water-Cooled Reactors," Vogtle Electric Generating Plant (VEGP) hereby reports the following change in an alarm setting to the Digital Metal Impact Monitoring System. On December 3, 1997, the Unit 1, channel 756 alert setpoint was changed from 2.5g to 3.4g. This increase in setpoint was due to a 20 mV increase in background noise levels.
If there are any questions or comments, please contact my office.
Sincerely, C.K.McCo CKM/TEW cc:
Southern Nuclear Operatina Company Mr. J. B. Beasley, Jr.
Mr. M. Sheibani
/(US.
NORMS
,myai3 I
U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. D. Jaffe, Senior Project Manager, NRR Mr. J. Zeiler, Senior Resident inspector, Vogtle
\\[' kkil l l kk I I 9002090084 980202 DR i
p ADOCK 05000424 PDR _
-