ML20199L089

From kanterella
Jump to navigation Jump to search
Commits to Provide NRC W/Listed Info Re Testability of Bailey 862 Solid State Logic Modules,To Support Issuance of Full Power License
ML20199L089
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 04/08/1986
From: Corbin McNeil
Public Service Enterprise Group
To: Adensam E
Office of Nuclear Reactor Regulation
References
NUDOCS 8604100289
Download: ML20199L089 (2)


Text

_ _ _ _ _ _ _ _ _ _ _.

.. 1 Public Service Electnc and Gas Company Corbin A. McNeill, Jr.

Pubiic Service Eiectric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609 339-4800 Vice President -

Nuclear April 8, 1986 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20814 Attention:

Ms. Elinor Adensam, Director Project Directorate 3 Division of BWR Licensing

Dear Ms. Adensam:

BAILEY 862 SOLID STATE LOGIC MODULE CONCERNS HOPE CREEK GENERATING STATION DOCKET NO. 50-354 Based upon various telecons and a meeting between representatives of Public Service Electric and Gas Company (PSE&G) and the NRC concerning testability of the Bailey 862 Solid State Logic Modules (SSLM), PSE&G commits to provide the NRC the following information.

1.

Complete listing of those Bailey 862 SSLMs which are surveilled in accerdance with Hope Creek Technical Specifications.

2.

Description of the Technical Specification surveillance testing performed on the Bailey 863 SSLMs.

This description will include simplified schematics and a discussion pertaining to overlap testing of affected modules.

3.

Description of the options available to perform in-situ surveillance testing at power, of the Technical Specification surveilled Bailey 862 SSLMs.

4.

Description of the impact associated with performing the surveillance testing outlined in item 3.

8604100289 860408 PDR ADOCK 05000354 A

pnp DO ll0

Director of Nuclear 2

4/8/86 Reactor Regulation 4

5 The aforementioned information will be provided in a timely manner to support issuance of a full power license for I

Hope Creek Generating Station.

In the event there are any questions in this regard, do not hesitate to contact us.

4 Sincerely, 3

t -

>\\

~~

1 j

Attachment C

D.H. Wagner USNRC Licensing Project Manager 1

R.W.

Borchardt USNRC Senior Resident Inspector l

I l

3 i

i

'l

..,.,.....