Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199E915 + (ML20199E915)
- ML20199E916 + (ML20199E916)
- ML20199E917 + (ML20199E917)
- ML20199E919 + (ML20199E919)
- B16954, Application for Amend to License NPF-49,changing TS Bases Section 3/4.5.1 by Rewording Section to Clarify Ref to IEEE Standard 279-1971 Re Operating Bypasses + (ML20199E921)
- ML20199E929 + (ML20199E929)
- IR 05000461/1986040 + (ML20199E930)
- ML20199E932 + (ML20199E932)
- ML20199E936 + (ML20199E936)
- ML20199E938 + (ML20199E938)
- BSEP-97-0537, Forwards Biological Assessment of Impact to Sea Turtles at CP&L Brunswick Steam Electric Plant, to Support Endangered Species Act Section 7 Consultation Between NRC & National Marine Fisheries Svc + (ML20199E941)
- 3F0686-12, Application for Amend to License DPR-72,consisting of Tech Spec Change Request 145,increasing Setpoint for Reactor High Pressure Trip & Adding Two Anticipatory Reactor Trips,In Response to NUREG-0737 & Generic Ltr 82-16.Fee Paid + (ML20199E942)
- ML20199E943 + (ML20199E943)
- 3F1197-47, Updates Publication Date for Hard Copy of Rev 24 to FSAR Which Is to Be Issued Prior to Restart from Current Outage + (ML20199E946)
- ML20199E949 + (ML20199E949)
- ML20199E950 + (ML20199E950)
- ML20199E951 + (ML20199E951)
- ML20199E952 + (ML20199E952)
- ML20199E953 + (ML20199E953)
- ML20199E954 + (ML20199E954)
- ML20199E955 + (ML20199E955)
- ML20199E956 + (ML20199E956)
- PNO-V-86-033, on 860616,reactor Taken Critical.Caused by Physics Testing.Reactor Will Be Returned to Power on 860618. Problems W/Reactor Control Sys Thermal Expansion & Control Room Ventilation Sys Resolved + (ML20199E959)
- ML20199E960 + (ML20199E960)
- ML20199E961 + (ML20199E961)
- ML20199E962 + (ML20199E962)
- ML20199E964 + (ML20199E964)
- ML20199E965 + (ML20199E965)
- BVY-97-120, Informs That Two Design Basis Documents Have Been Approved & 18 Are in Review Process.Remaining 3 Should Be in Draft Form by End of 1997.Review & Approval Process for All 23 Design Basis Documents Will Be Completed in 1998 + (ML20199E966)
- ML20199E967 + (ML20199E967)
- ML20199E968 + (ML20199E968)
- IR 05000298/1986018 + (ML20199E970)
- ML20199E971 + (ML20199E971)
- ML20199E972 + (ML20199E972)
- ML20199E973 + (ML20199E973)
- ML20199E974 + (ML20199E974)
- 05000255/LER-1998-012, :on 981215,discovered That MSIVs Were Slightly Open Based on Local Stem Position.Caused by High Packing Friction Introduced by Packing Replacement During 1998 Rfo. Completed Actions to Assure MSIVs Will Fully Close + (ML20199E975)
- ML20199E977 + (ML20199E977)
- ML20199E978 + (ML20199E978)
- ML20199E980 + (ML20199E980)
- ML20199E981 + (ML20199E981)
- ML20199E982 + (ML20199E982)
- GO2-99-011, Forwards Rev 38 to Physical Security Plan,Per 10CFR50.54(p). Rev Does Not Decrease Effectiveness of Approved Plan.Encl Withheld,Per 10CFR2.790(a)(3) + (ML20199E984)
- ML20199E985 + (ML20199E985)
- ML20199E986 + (ML20199E986)
- ML20199E987 + (ML20199E987)
- ML20199E988 + (ML20199E988)
- ML20199E990 + (ML20199E990)
- ML20199E991 + (ML20199E991)
- ML20199E993 + (ML20199E993)
- ML20199E994 + (ML20199E994)