Forwards Summary of NRC Insp Activities Tentatively Planned for Plant During February & March 1998.Purpose of Insp to Assess Readiness to Safely Restart & Operate Plant
ML20199E977
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/23/1998
From: Lanning W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bowling M
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 9802030023
Download: ML20199E977 (11)


Text

4 I

d i

January 23,1998 0

h l h

Mr. M. L. Bowling, Recovery Officer, Unit 2

)j c/o Patricia A. Loftus, Director - Regulatory N

Affairs for Millstone Station M

PO Box 128 Waterford, CT 06385 1 ;

11

SUBJECT:

NRC INSPECTION ACTIVITIES b

Dear Mr. Bowling:

@ is a summary of the NRC inspection activities that are tentatively planned for I!

Millstone Unit 3 during February and March 1998. These terdailve dates have been h

developed to assist both NRC and Northeast Utilities in our respective planning efforts, d

importantly, these dates are dependent upon your completion of corrective actions ii. these 1

areas. These inspections are part of our program for restart assessment and are in addition

]

to the routine resident inspector and contractor activities. Although the inspections of g i program areas will not be conducted by teams, the inspections will generally be staffed h

with two or three inspectors.

As a result of the significant amount of inspection required to be completed in the limited l

time frame, several of the activities will occur concurrently. NRC policy is to schedule inspections to minimize the regulatory impact on licensees. For example, when a team inspection is planned, other activities, such as program area or individual region based inspections, are not scheduled (to the extent possible) for the time period of the team a

inspection.

We request that within 7 days of receipt of this letter that you confirm that you will be

/

able to effectively support the planned inspections without a resultant adverse regulatory ll impact to your organization.

1 Further, the Operational Safety Team inspection (OSTI) will be conducted as described in the NRC Restart Assessment Plan and as noted in Enclosure 1. The purpose of this

-1 inspection is to assess your readiness to safely restart and operate Millstone Unit 3. In e

order to conduct this type of comprehen3ive inspection, we will need to review, in advance of the inspection, certain documents. Attached is a list (Enclosure 2) of documents to be available for review by the team during the onsite OSTI preparation week. The team

=

tentatively plans to conduct ou' onsite preparation commensurate with your approach to r

plant heatup.

I 9802030023 980123 PDR ADOCK 05000423 G

PM

e Mr. M. L. Bowling 2

.Your cooperation with us during this inspection will be appreciated. Should you have any questions regarding this request or the inspection, you may contact Jim Trapp et (610) 337 5186.

Sincerely.

ORIGINAL SIGNED BY]

Wayne D. Lanning, Deputy Director of Inspections Special Project Office 4

cc w/ encl:

B. Kenyon, President and Chief Executive Officer M. H. Brothers, Vice President - Operations J. McElwain, Unit 1 Recovery Officer D. M. Goebel, Vice President, Nuclear Oversight G. D. Hicks, Unit Director - Millstone Unit 3 J. A. Price, Unit Director - Millstone Unit 2 M. J. Ross, Manager - Nuclear Training Assessment Group D. Ams'.ine, Vice President for Engineering and Support Services P. D. Hinnenkamp, Director, Unit 1 Operations F. C. Rothen, Vice President, Work Services J. Stankiewicz, Train't.g Recovery Manager R. Johannes, Director - Nuclear Training S. J. Sherman, Audits and Evaluation L. M. Cuoco, Esquire J. R. Egan, Esquire V. Juliano, Waterford Llorary

-J. Buckingham, Department of Public Utility Control S. B. Comley, We The People State of Connecticut SLO Designee D. Katz, Citizens Awareness Network (CAN) l R. Bassilakis, CAN -

J. M. Block, Attorney, CAN S. P. Luxton, Citizens Regulatory Commission (CRC)

Representative T. Coacannon l

E. Woollacott, Co-Chairman, NEAC l

i t

I i-

Mr. - M. L. Bowflag 3

a a

ec w/enci and Attachri.ont 1:

H. Haynes, Director, Nuclear Training D. Lazarony, Supervisor, Operator Training Distribution w/enci and Attachment 1:

DRS Master Exam File PUBLIC Nuclear Safety information Center (NSIC)

- V. Curley, DRS J. Munro, NRR/DRCH/HOLB Distribution w/ench w/o Attachment 1:

Region l Docket Room (with cong of concurrences) i FILE CENTER, NRR (with Orloinal concurrences)

NRC Resident inspector W. Axelson, DRS

3. Jones, PIMB/ DISP M. Kalanion, SPO, RI W. Lanning, Deputy Director of Inspections, SPO, RI D. Screnci, PAO W. Travers, Director, SPO, NRR J. Wiggins, DRS

- L. Briggs, Chief Examiner, DRS W. Lanning, SPO, RI J. Durr, SPO, RI A. Cerne, SRI DRS OL Facility File S. Stewart, DRS I

t l

l l

J u

a Mr. M. L. Bowling 4

4 Distribution w/ encl: w/o Attachment 1 (VIA E-MAIL):

J. Andersen, PM, SPO, NRR -

M. Callahan, OCA R. Correia, NRR B. McCabe, OEDO S. Dembek, PM, SPO, NRR G. Imbro, Deputy Director of ICAVP Oversight, SPO, NRR D. Mcdonald, PM, SPO, NRR P. McKee, Deputy Director of Licensing, SPO, NRR S. Reynolds, Chief, ICAVP Oversight, SPO, NRR inspection Program Branch (IPAS)

' DOCUMENT NAME: 1:\\BR/E ' 16\\ACTIVITS.98 To,eceive e copy of thee document. Indicew.e the box: *C* = Copy without attachment / enclosure

  • E" = Copy with attachment / enclosure

'N' = No copy OFFICE Rl/DRS l

Rl/SPO lE Rl/SPQ l

Rl/S,PQ; /

NAME TRAPP SCHOLLjff-DU3Rt/

LANMNG DATE 1/ /98 1p /98 '

1/]19 8 1[l/98 OFFICIAL RECORD COPY

'O ENCLOSURE 1*

Team Insoections:

Independent Corrective Action Verification Program (ICAVP) Corrective A'.tlon inspection (2/23,3/2,3/9/98)

NRC Inspection Procedure 40500 " Effectiveness of Licensee Controls in identifying, Resolving, and Proventing Problems" (2/9,2/16/98)

Operational Safety Team Inspection (OSTI) (3/2,3/9/98) 1 Proaram Area insoections:

f Motor Operated Valves (2/9,2/23/98)

Emergency Preparedness (2/23/98) 4 Fire Protection / Appendix R (awaiting licensee completion date)

_ Operator Training / Licensing (3/2,3/9/98)

Deferred issues Review (2/9/98)

Team and program area dates indicate weeks of on-site inspection. There will also be a one week on-site preparation period for the OSTI during the week of 2/2'98.-

ENCLOSURE 2 OSTI DOCUMENT REQUEST LIS_I OPERATIONS Procedures and Procedure Useco Operations Directives (administrative procedures for the conduct of operations),

a include any documentation cf management expectations / goals for operations if not included in the Operations Directives.

System, Abnormal and Alarm operating procedures for the emergency diesel generators, safety injection, and quench spray.

System descriptions, design basis documents and/or training material on the operation of the emergency diesel generators, safety injection, and quench spray systems.

Conduct of Ooerations Records of approvals for operations personnel exceeding administrative overtime guidelines in the past 3-months (if any).

Shift schedule and breakdown of crew assignments.

The ccmpleted plant log sheets for the past week. Also provided a copy of the plant tog sheets that will be used following the Mode changes.

Shift turnover sheets for the past week.

All log book entries for licensed and non-licensed operations personnel for the past week.

Shift Orders / Night Orders for the past week and all Standing Orders.

Trainina and Qualifications Operator training matrix (or other record) which documents both licensed and non-licensed operator participation in requalification training. Also provide records for fire brigade training.

Training material and training records for operator training on modifications and changes to operating procedures made during tha current outege.

Eouloment Status 7

t I

- 2 Administrative procedures for safety tagging and equipment status control.

e Valvo check off lists and associated procedures for the alignment of the Emergency e

. Diesel Gerorators, Safety injection, and Quench Spray.

i List of existing control room deficiencies and operator-work-arounds e

l Command and Can' rol t

Summaries of Condition Reports (CRs) written av.st operations for the past year.

e Techr.ical Specification interpretations (if any).

Schedule of planned operations activities for the next 12' weeks.

. i Copy cf self assessments / oversight audits of operations performed during the past e

6 months, i

MAINTENANCE /SURVElLLANCE

. Plannina end Schedulina 4

-e

- Procedures, process flow charts, or other documents which describe your work -

j planning and scheduling process, i

-e Provide recent assessment'(self or oversight) of the planning and scheduling programs.

. Conduct of Maintenance

{

Maintenance and I&C administrative procedures which describe your corrective, preventive, and predictive maintenance programs.

Documents, including training records, which describes training and re-retraining of j

plant and contractor maintenance personnel.

e' A copy of corrective and preventive maintenance procedures for the emergency -

diesel generators, safety injection and quench sprey systems equipment.

e Schedule for maintenance activities planned to be performed during onsite l

Inspection weeks.

o Copy of recent self assessrnents/QA audits of maintenance activities including any i.

metrics used to routinely measure maintenance performance, j

e Provide maintenance rule implementation information including the performance criteria and basis, corrective action plans (if A(1) system), reliability and 1

i 4

n e

r ug

.m, e

3 unavailability data and other pertinent maintenance rule documentation pertaining to the diesels, quench spray and safety injection systems.

Plant Matecist Condition A list of outstanding equipment deficiencies (AWOs). Provide an indication as to which of these deficiencies are planned for resolut> n prior to plant restart and assessment of basis for deferral (if available).

Provide list of systems being monitored in accordance with (a)(1) of the maintenance rule and provide the corrective action plans associated with these systems.

Preventive Maintenance Proaram A list of preventive maintenance which is beyond the scheduled due dates (if any) and is not planned to be conducted prior to plant restart (not including PMs which require a Mode change prior to perform).

Vendor manual information for major components in the emergency diesels, quench spray and safety injection systems. Also provide administrative procedures for vendor manual updates and any recent assessments of the vendor manual program.

Surveillance Testina Provide 6 schedule of surveillance tests planned during the OSTI onsite inspection e

weeks.

In service test procedures and last completed test for the emergency diesel generators, safety injection, and quench spray systems.

Surveillance test procedures for the diesels generators, safety injection and quench spray systems. Also, provide the completed copy of the last surveillance performed.

MANAGEMENT PROGRAMS & OVERSIGHT Manaaement Processes Provide administrative procedures for employee concerns prer; ram.

Provide documents that provide management's station goals and expectations to the plant staff.

Administrative procedures and findings of management observation programs (if any).

4 Documents demonstrating how PRA insights our used in prioritization and management decision making (if available).

Performance improvement program including st: us (if available).

Corrective Actions Provide administrative procedures for the corrective action program implementation.

In addition, provide a copy of the last 10 completed root cause evaluations.

A list of outstanding corrective action items including CRs, AITTs, UIRs, NCRs, EWRs and indication of those that will not be completed prior to plant restart.

Startun Plans Copy of plant start up plan and power ascension program.

Self-Assessment Provide administrative procedure and last two self-assessment conducted in the areas of operations, maintenance and surveillance, and engineering.

Provide documentation of self-assessments which demonstrate that operations, maintenance and surveillance and engineering are ready to supp. 't restart.

Provide a list of open self-assessment findings and the status of the corrective actions. Also provide a list of the self assessment findings that have been closed in the past 3-months.

Indeoendent Oversloht List of open Oversight /QA findings. Also provide a list of QA findings closed in the past 3 months, y

Provide documentation which substantiates nuclear oversights conclusion that l

operations, maintenance and surveillance and engineering are ready to support restart.

l l

Copy of the Nuclear Oversight Restart Verification Plan.

I Qualitv Review Committees Administrative procedures implementing the PORC. Also provide the Mt 3 meeting minutes and open items list from PORC.

- Administrative procedures implementing the SORC. Also provide the last 3 meeting

5

-)

minutes and open items list from SORC.

Administrative procedures implementing the NSAB. Also provide the last 3 meeting minutes and open items list from NSAB.

ENGINEERING AND TECHNICAL SUPPORT Plant Modifications Administrative procedures for modifications and temporary modifications.

List of currently installed temporary modifications.

List of modifications installed during the current maintenance outage.

i Provide a list of one for-one or like-in-kind replacements performed during the current outage.

List of proposed modifications which are to be deferred until a future outage.

l TechnicalIssue Resolution l

Provide a list of open CRs and corrective action items assigned to System and Design Engineering, j

Provide performance monitoring measures for the timeliness of engineering's response to CRs and AITTS.

Plant Sunnart Provide administrative procedures for system engineering.

Provide self-assessments and/or independent oversight inspections of the system engineering program.

1 l

- Provide status of operator work arounds and control-room-deficiencies that are l

assigned to engineering for resolution.

l l

Provide training matrix that describer status of initial and cont!nuing training for the technical staff.

l-1 i

Confiouration Control List of drawings that require revision.

Administrative procedures for vendor manual program and a list of vendor manuals requiring updates.

____-.m i*

6 Administrative procedures and current status of setpoint control program.

Onoratina Exoerience Administrative procedures for operating experience program.

o Provi_3 a status of open' items from the operating experience program.

. Provide self-assessments and/or independent oversight inspections of the operating experience' program.