ML20199E938

From kanterella
Jump to navigation Jump to search
Advises That Proposed Rerouting of Two Lines Connected to HPCS Suction Line Completed During 1986 Refueling Outage,Per Integrated Plant SAR,(NUREG-0827),Section 4.11.Drawing, Procedure & Facility Changes Completed.Item 1 Resolved
ML20199E938
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 06/16/1986
From: Taylor J
DAIRYLAND POWER COOPERATIVE
To: Zwolinski J
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0827, RTR-NUREG-827 LAC-11673, NUDOCS 8606240154
Download: ML20199E938 (1)


Text

D DA/RYLAND h [k COOPERAT/VE PO. BOX 817 2615 EAST AV SOUTH

  • LA CROSSE. WISCONSIN 54601 June 16, 1986 (608) 788m In reply, please refer to LAC-Il673 DOCKET NO. 50-409 Mr. John A. Zwolinski, Director BWR Project Directorate #1 Division of BWR Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)

PROVISIONAL OPERATING LICENSE NO. DPR-45 INTEGRATED PLANT SAFETY ASSESSMENT-SYSTEMATIC EVALUATION PROGRAM NUREG-0827, SECTION 4.I1 l

REFERENCE:

(1) Letter (LS05-85-08-016) Zwolinski to Linder, dated August 13, 1985.

Dear Mr. Zwolinski:

In the conclusion to the letter referenced above, it was stated that "...the six open items identified in Section 4.11 of the La Crosse ISPAR (NUREG-0827) will be satisfactorily resolved upon completion of the proposed rerouting of the two lines connected to the HPCS suction line." The two lines in question have been rerouted as per LACBWR Facility Change No. 69-85-04, during the recently completed 1986 refueling outage. The necessary drawing changes and procedure changes were completed in April and the Facility Change has been closed out.

IPSAR Section 4.11, Item (1) should, therefore, be resolved. If you have any questions concerning this issue, please contact us.

Very truly yours, DAIRYLAND POWER COOPERATIVE B606240154 860616 PDR P

ADOCK 05000409 PDR James W. Taylo General Manager JWT: REC:sks cc: Mr. James Keppler, NRC Region III Mr. John Stang, LACBWR Project Manager NRC Resident Inspector \

go 3 WP!.3.7  ; 'O i