D DA/RYLAND h
[k COOPERAT/VE PO. BOX 817 2615 EAST AV SOUTH
- LA CROSSE. WISCONSIN 54601 (608) 788m June 16, 1986 In reply, please refer to LAC-Il673 DOCKET NO. 50-409 Mr. John A. Zwolinski, Director BWR Project Directorate #1 Division of BWR Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)
PROVISIONAL OPERATING LICENSE NO. DPR-45 INTEGRATED PLANT SAFETY ASSESSMENT-SYSTEMATIC EVALUATION PROGRAM NUREG-0827, SECTION 4.I1
REFERENCE:
(1) Letter (LS05-85-08-016) Zwolinski to Linder, dated August 13, 1985.
Dear Mr. Zwolinski:
In the conclusion to the letter referenced above, it was stated that "...the six open items identified in Section 4.11 of the La Crosse ISPAR (NUREG-0827) will be satisfactorily resolved upon completion of the proposed rerouting of the two lines connected to the HPCS suction line." The two lines in question have been rerouted as per LACBWR Facility Change No. 69-85-04, during the recently completed 1986 refueling outage. The necessary drawing changes and procedure changes were completed in April and the Facility Change has been closed out.
IPSAR Section 4.11, Item (1) should, therefore, be resolved. If you have any questions concerning this issue, please contact us.
Very truly yours, DAIRYLAND POWER COOPERATIVE B606240154 860616 PDR ADOCK 05000409 P
PDR James W. Taylo General Manager JWT: REC:sks cc:
Mr. James Keppler, NRC Region III Mr. John Stang, LACBWR Project Manager NRC Resident Inspector
\\
go 3 WP!.3.7