- 05000304/LER-1997-002, Forwards LER 97-002-00,per 10CFR50.73(a)(2)(v)(B),which Requires 30 Day Written Rept.Commitments Associated W/Correspondence,Encl + (ML20199A402)
- ML20199A404 + (ML20199A404)
- ML20199A409 + (ML20199A409)
- ML20199A411 + (ML20199A411)
- ML20199A413 + (ML20199A413)
- ML20199A414 + (ML20199A414)
- ML20199A415 + (ML20199A415)
- ML20199A419 + (ML20199A419)
- ML20199A420 + (ML20199A420)
- ML20199A424 + (ML20199A424)
- ML20199A425 + (ML20199A425)
- 3F1197-41, Forwards Corrected First Page to Re Response to RAI for LAR 218,rev of Makeup Sys Letdown Line Failure Accident Analysis + (ML20199A428)
- ML20199A433 + (ML20199A433)
- ML20199A435 + (ML20199A435)
- ML20199A438 + (ML20199A438)
- ML20199A439 + (ML20199A439)
- ML20199A441 + (ML20199A441)
- L-98-015, Requests NRC Review & Approval of Proposed Change to BVPS Unit 1 Ufsar.Proposed Rev to UFSAR Change to Address Recent Rev to CR Radiological Dose Calculations + (ML20199A442)
- 05000269/LER-1997-003-01, Forwards LER 97-003-01 Re post-LOCA Boron Dilution Design Basis Not Being Met.Rept Includes Updated Info & Revised Corrective Action + (ML20199A443)
- NPL-99-0010, Requests Enforcement Discretion from Specific Plant TS Requirements Re Inoperability of Both SI & Both CS Pumps for Unit 1.Subject Pumps Were Declared Inoperable Upon Discovery of Failed Freeze Protection Circuit + (ML20199A444)
- ML20199A447 + (ML20199A447)
- ML20199A448 + (ML20199A448)
- ML20199A449 + (ML20199A449)
- 05000304/LER-1997-004, Forwards LER 97-004-00,per 10CFR50.73(a)(2)(i).Commitments Associated W/Correspondence,Encl + (ML20199A452)
- ML20199A454 + (ML20199A454)
- 05000304/LER-1997-004-08, :on 971015,small Bore Containment Penetration Line Inadequately Supported Since Plant Construction Was Noted.Cause Cannot Be determined.Non-destructive Exams Performed to Determine Condition & Integrity of Pipe + (ML20199A459)
- ML20199A460 + (ML20199A460)
- IR 05000027/1997201 + (ML20199A463)
- ML20199A465 + (ML20199A465)
- ML20199A468 + (ML20199A468)
- ML20199A470 + (ML20199A470)
- IR 05000275/1998003 + (ML20199A471)
- PNO-I-97-066A, on 971107,return of Intermodal Containers to Cabot Corp Update Made.Nrc Continuing to Review & Evaluate Cabot Efforts to Characterize Ores Filtered Press Cake & Package in Compliance W/Dot Regulations for Shipment + (ML20199A472)
- ML20199A474 + (ML20199A474)
- ML20199A475 + (ML20199A475)
- IR 05000382/1998016 + (ML20199A476)
- ML20199A477 + (ML20199A477)
- ML20199A478 + (ML20199A478)
- ML20199A481 + (ML20199A481)
- ML20199A484 + (ML20199A484)
- ML20199A485 + (ML20199A485)
- ML20199A488 + (ML20199A488)
- ML20199A489 + (ML20199A489)
- ML20199A490 + (ML20199A490)
- ML20199A492 + (ML20199A492)
- ML20199A495 + (ML20199A495)
- ML20199A497 + (ML20199A497)
- ML20199A499 + (ML20199A499)
- ML20199A500 + (ML20199A500)
- ML20199A501 + (ML20199A501)