Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NSD-NRC-98-5525, Provides W Responses to FSER Open Items on AP600.Summary of Encl Responses,Fser Open Item Number,Associated Oits Number & Status to Be Designated in W Status Column of Oits + (ML20198Q773)
- ML20198Q774 + (ML20198Q774)
- ML20198Q775 + (ML20198Q775)
- ML20198Q779 + (ML20198Q779)
- ML20198Q780 + (ML20198Q780)
- ML20198Q781 + (ML20198Q781)
- ML20198Q783 + (ML20198Q783)
- ML20198Q784 + (ML20198Q784)
- PNO-II-84-061, on 840916,plant,Unit 1 Shut Down Due to Steam Leak Inside Turbine Bldg.Region II Dispatched Insp & Failed Assembly Being Sent off-site for Independent Verification + (ML20198Q786)
- SNRC-1261, Rev 1 to Transient Analysis Lesson Plan + (ML20198Q787)
- PNO-V-84-010, on 840218,reactor Trip Safety Injection Occurred,When Replacement of Fuse During Isolation Valve Surveillance Test Caused Voltage Drop on Preferred Instrument Bus.State of or Notified + (ML20198Q789)
- ML20198Q790 + (ML20198Q790)
- ML20198Q793 + (ML20198Q793)
- ML20198Q794 + (ML20198Q794)
- PNO-IV-84-014A, on 840626,licensee Committed to Maintain Fort St Vrain in Shutdown Condition Until Cause of Failure of Six Rod Pairs to Drop on Reactor Trip Identified,Corrective Measures Taken & NRC Authorizes Return to Operations + (ML20198Q795)
- ML20198Q797 + (ML20198Q797)
- ML20198Q798 + (ML20198Q798)
- ML20198Q801 + (ML20198Q801)
- ML20198Q802 + (ML20198Q802)
- ML20198Q803 + (ML20198Q803)
- ML20198Q804 + (ML20198Q804)
- ML20198Q807 + (ML20198Q807)
- NSD-NRC-98-5521, Provides W Responses to FSER Open Items on AP600.Summary of Encl Responses,Fser Open Item Number,Associated Oits Number & Status to Be Designated in W Status Column of Oits, Included in Table 1 + (ML20198Q808)
- ML20198Q809 + (ML20198Q809)
- ML20198Q811 + (ML20198Q811)
- ML20198Q812 + (ML20198Q812)
- 3F1197-03, Provides Response to Violations Noted in Insp Rept 50-302/97-13.Corrective Actions:Installed Scaffolding Reviewed Against Specific Scaffolding Seismic Requirements + (ML20198Q813)
- ML20198Q814 + (ML20198Q814)
- ML20198Q815 + (ML20198Q815)
- ML20198Q818 + (ML20198Q818)
- ML20198Q819 + (ML20198Q819)
- ML20198Q820 + (ML20198Q820)
- ML20198Q821 + (ML20198Q821)
- ST-HL-AE-1679, Informs of Projected 85% Installation of safety-related Equipment by 860801.Master Lists for Environ & Seismic Qualification Will Be Submitted by 860616.Encl Revised Response to Question 110.29 Confirms Dates + (ML20198Q822)
- IR 05000243/1998202 + (ML20198Q823)
- ML20198Q826 + (ML20198Q826)
- ML20198Q833 + (ML20198Q833)
- ML20198Q834 + (ML20198Q834)
- ML20198Q835 + (ML20198Q835)
- ML20198Q836 + (ML20198Q836)
- ML20198Q837 + (ML20198Q837)
- NSD-NRC-98-5527, Forwards Rev 4 to WCAP-12600, AP600 QA Program Plan, Which Has Been Updated to Reflect Current Project Position on QA Requirements for Sys,Structures & Components to Which Regulatory Treatment on non-safety Sys Criteria Apply + (ML20198Q839)
- ML20198Q840 + (ML20198Q840)
- ML20198Q842 + (ML20198Q842)
- ML20198Q848 + (ML20198Q848)
- BSEP-97-0411, Forwards Suppl Response to NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in Bwrs.Rept Summarizes Actions Taken for NRC Bulletin 96-003 + (ML20198Q849)
- ML20198Q852 + (ML20198Q852)
- ML20198Q853 + (ML20198Q853)
- ML20198Q854 + (ML20198Q854)
- NSD-NRC-98-5526, Provides Proprietary Westinghouse Responses to NRC FSER Open Items 480.1085F (Oits 6187) & 480.1086F (Oits 6188) Re Wgothic Evaluation Model.Proprietary Responses Withheld,Per 10CFR2.790 + (ML20198Q856)
- ML20198Q857 + (ML20198Q857)