Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198P645 + (ML20198P645)
- ML20198P647 + (ML20198P647)
- ML20198P648 + (ML20198P648)
- L-97-052, Proposed TS Change Request 243 to License DPR-66,modifying TS Table 3.3-4 Re Emergency Bus Undevoltage Trip Setpoint, Allowable Valve & Time Delay for DG Start + (ML20198P649)
- ML20198P650 + (ML20198P650)
- ML20198P654 + (ML20198P654)
- ML20198P655 + (ML20198P655)
- ML20198P656 + (ML20198P656)
- ML20198P657 + (ML20198P657)
- ML20198P659 + (ML20198P659)
- ML20198P660 + (ML20198P660)
- ML20198P664 + (ML20198P664)
- ML20198P666 + (ML20198P666)
- ML20198P669 + (ML20198P669)
- ML20198P670 + (ML20198P670)
- BSEP-97-0488, Provides 30-day Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps. Commitment Made by Util,Encl + (ML20198P671)
- ML20198P672 + (ML20198P672)
- ML20198P673 + (ML20198P673)
- ML20198P674 + (ML20198P674)
- ML20198P676 + (ML20198P676)
- U-602857, Provides 30-day Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps. Util Will Submit Info Requested within 90 Days + (ML20198P679)
- ML20198P680 + (ML20198P680)
- ML20198P684 + (ML20198P684)
- ML20198P687 + (ML20198P687)
- ML20198P689 + (ML20198P689)
- ML20198P690 + (ML20198P690)
- ML20198P692 + (ML20198P692)
- ML20198P695 + (ML20198P695)
- ML20198P696 + (ML20198P696)
- 05000454/LER-1997-016-04, :on 971007,projected SG Leak Rate Combined with TS Limit for Dose Equivalent Iodine Creates Potential for Operation Outside Design Basis.Caused by Projected Leakage & Leakrate Limits.Sg Are Being Replaced + (ML20198P698)
- ML20198P699 + (ML20198P699)
- BSEP-97-0454, Application for Amends to Licenses DPR-71 & DPR-62,revising Design Basis Qualification Requirements for CREVS & CREVS Instrumentation,For Limited Period of Time + (ML20198P701)
- ML20198P702 + (ML20198P702)
- ML20198P703 + (ML20198P703)
- ML20198P705 + (ML20198P705)
- ML20198P706 + (ML20198P706)
- ML20198P709 + (ML20198P709)
- ML20198P710 + (ML20198P710)
- ML20198P712 + (ML20198P712)
- ML20198P713 + (ML20198P713)
- 05000455/LER-1997-003-08, :on 971010,reactor Trip Occurred,Due to age-related Failures of Redundant Power Supplies That Went Undetected by Alarm Sys.Modification to Power Supply Failure Alarm Will Be Submitted to TRC for Review + (ML20198P715)
- ST-HL-AE-5783, Submits 30-day Rept Re Significant Changes to Accepted Large Break LOCA ECCS Evaluation Model at Units 1 & 2 + (ML20198P717)
- ML20198P718 + (ML20198P718)
- L-97-049, Submits Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps, + (ML20198P721)
- ML20198P723 + (ML20198P723)
- ML20198P725 + (ML20198P725)
- ML20198P726 + (ML20198P726)
- 05000338/LER-1997-008, :on 971027,both EDGs Inoperable During Testing. Caused by TS Surveillance Requirement to Demonstrate Operability of Remaining EDG When One Inoperable.Required TS Actions Cleared Following 1J EDG Testing + (ML20198P727)
- ML20198P728 + (ML20198P728)
- B16842, Provides Revised Commitment Stated in Which Responded to Recommendations Made by Little Harbor Consultants Inc During 970603 Meeting + (ML20198P731)
- ML20198P732 + (ML20198P732)