Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198E486 + (ML20198E486)
- RBG-44769, Submits Final License Examination Matl for Feb 1999,license Examination for Rbs.Without Attachments + (ML20198E490)
- 05000528/LER-1986-029, :on 860422,surveillance Test of Pressurized Heater Capacity Incorrectly Performed Due to Procedural Deficiency.Caused by Personnel Error & Incorrect Calculation Method Specified in Procedures + (ML20198E491)
- ML20198E496 + (ML20198E496)
- ML20198E498 + (ML20198E498)
- ML20198E499 + (ML20198E499)
- U-600288, Emergency Response Facilities Design Rept + (ML20198E502)
- 05000309/LER-1986-002, :on 851106 & 860417,automatic Reactor Trip on Loss of Load Occurred Due to Main Turbine Trip on High Steam Generator Level.Caused by Controller Malfunction & Faulty Potentiometer.Controller Replaced + (ML20198E503)
- 05000302/LER-1997-044, :on 971209,breaker Trip Setpoint Resulted in Deenergizing of Sre.Caused by Inadequate Setpoint Criteria. Revised Electrical Design Criteria for CR-3 + (ML20198E506)
- ML20198E508 + (ML20198E508)
- TXX-4806, Interim Deficiency Rept CP-85-42 Re Possible Adverse Effects of Substituting Rectangular & Oversized Preformed Sections of Thermolag on Conduit Support Design Installations. Initially Reported on 850920 + (ML20198E509)
- IR 05000423/1986012 + (ML20198E511)
- NUREG/CR-5549, Forwards NUREG/CR-5549, Environmental Assessment Renewal of Materials Licenses for Alaron Corp Northeast Regional Service Facility,Wampum,Pa, for Placement Into Nudocs + (ML20198E514)
- PNO-II-98-001, on 980106,licensee Reported to Fl Bureau of Radiological Health That Troxler,Model 3430,moisture Density Gauge Stolen from Licensee pick-up Truck.State Will Require Licensee to Issue Press Release + (ML20198E517)
- RBG-44783, Provides Entergy Operations,Inc Input as Discussed in Call, for Consideration by NRC in Enforcement Process Re Insp Rept 50-458/98-13 + (ML20198E519)
- TXX-4808, Interim Deficiency Rept CP-84-12 Re Impact of high-energy Line Break Temps on Qualified Equipment Outside Containment. Initially Reported on 840604.Thermal Analysis Completed & Operability of Equipment Under Review.Next Rept by 860716 + (ML20198E521)
- ML20198E523 + (ML20198E523)
- ML20198E524 + (ML20198E524)
- 05000395/LER-1986-007, :on 860422,reactor Bldg Space Spray Pump B Inadvertently Started.Cause Not Determined.Spray Pump Discharge Valve Remained Closed & No Flow Introduced Into Reactor Bldg + (ML20198E525)
- ML20198E528 + (ML20198E528)
- ML20198E529 + (ML20198E529)
- IR 05000409/1998005 + (ML20198E531)
- 05000440/LER-1986-005, :on 860421,0510,17 & 19,control Room HVAC Sys Shifted to Emergency Recirculation Mode Due to High Chlorine Gas Monitor Trip Signal.Caused by Defective Optical Lamp Filament.Lamp Replaced + (ML20198E532)
- ML20198E536 + (ML20198E536)
- ML20198E539 + (ML20198E539)
- ML20198E540 + (ML20198E540)
- ML20198E541 + (ML20198E541)
- 05000275/LER-1986-005, :on 860422,opening Created in Fire Barrier W/O Establishing Continuous Fire Watch.Caused by Misinterpretation of Const Requirements by Plant Fire Protection Personnel.Procedure Revised + (ML20198E542)
- ML20198E543 + (ML20198E543)
- PNO-III-85-094, on 851107,bypass Reactor Trip Breaker B Failed to Operate During Performance of Tests Per IE Bulletin 85-002.Cause Not Stated.Plant Restored to Condition in Which Both Main Reactor Trip Breakers Operable + (ML20198E544)
- ML20198E545 + (ML20198E545)
- 05000413/LER-1986-022, :on 860419,reactor Tripped During Venting of High Pressure Line to RCS Loop C Flow Transmitter.Caused by Defective Procedures.Procedures IP/1/A/3222/15A,B & C Revised + (ML20198E546)
- ML20198E547 + (ML20198E547)
- IR 05000508/1985006 + (ML20198E548)
- ML20198E550 + (ML20198E550)
- ML20198E552 + (ML20198E552)
- ML20198E553 + (ML20198E553)
- ML20198E555 + (ML20198E555)
- 05000458/LER-1986-033, :on 860426,reactor Scrammed Due to Combination of Planned half-scram from Surveillance Test & Unplanned half-scram.Caused by Blown Fuse in Reactor Protection Sys. Fuse Replaced + (ML20198E557)
- ML20198E558 + (ML20198E558)
- ML20198E559 + (ML20198E559)
- ML20198E561 + (ML20198E561)
- ML20198E562 + (ML20198E562)
- RBG-23671, Special Rept:On 860301,actuation of Div III ECCS Occurred Following Unit Scram.Caused by Feedwater Pump Trip Due to Voltage Transient in Associated 13.8-kV Switchgear. Evaluation Continuing + (ML20198E565)
- ML20198E566 + (ML20198E566)
- ML20198E567 + (ML20198E567)
- ML20198E569 + (ML20198E569)
- ML20198E570 + (ML20198E570)
- PNO-III-85-093C, on 851106,licensee Submitted Request for Restart Concurrence,Per 851030 Confirmatory Action Ltr.Insp & Testing of Reactor Trip Breakers Completed.Failed Breakers Shipped to Vendors for Testing & Evaluation + (ML20198E572)
- ML20198E574 + (ML20198E574)
- ML20198E575 + (ML20198E575)