Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198E036 + (ML20198E036)
- ML20198E037 + (ML20198E037)
- ML20198E038 + (ML20198E038)
- ML20198E039 + (ML20198E039)
- ML20198E041 + (ML20198E041)
- IR 05000424/1985045 + (ML20198E044)
- ML20198E045 + (ML20198E045)
- ML20198E046 + (ML20198E046)
- ML20198E047 + (ML20198E047)
- ML20198E048 + (ML20198E048)
- ML20198E050 + (ML20198E050)
- ML20198E052 + (ML20198E052)
- ML20198E054 + (ML20198E054)
- ML20198E055 + (ML20198E055)
- ML20198E056 + (ML20198E056)
- ML20198E057 + (ML20198E057)
- ML20198E059 + (ML20198E059)
- ML20198E060 + (ML20198E060)
- ML20198E063 + (ML20198E063)
- ML20198E064 + (ML20198E064)
- ML20198E065 + (ML20198E065)
- ML20198E067 + (ML20198E067)
- ML20198E070 + (ML20198E070)
- ML20198E071 + (ML20198E071)
- ML20198E074 + (ML20198E074)
- ML20198E076 + (ML20198E076)
- ML20198E079 + (ML20198E079)
- 05000333/LER-1998-013, :on 981117,containment Leakage Rate Exceeds Authorized Limits,Was Determined.Caused by Valve Sealing Failure.Failed Valves Repaired & Retested Satisfactorily Prior to Plant Startup + (ML20198E080)
- ML20198E082 + (ML20198E082)
- ML20198E084 + (ML20198E084)
- ML20198E085 + (ML20198E085)
- ML20198E087 + (ML20198E087)
- 3F1192-15, Provides Info on Interim Maint & Insp Activities Associated W/Nuclear Svcs Closed Cycle Cooling Sys Piping,Per 921117 Telcon.Routine UT Insps of Worst of Five Areas of Pipe Will Be Conducted Every 45 Days + (ML20198E091)
- ML20198E092 + (ML20198E092)
- ML20198E095 + (ML20198E095)
- ML20198E096 + (ML20198E096)
- ML20198E098 + (ML20198E098)
- 05000282/LER-1998-018, :on 981117,discovered That Surveillance Testing of Boric Acid Storage Tank Level Instrumentation Places Plant in Condition Where Single Failure Could Cause Inability to Inject Concentrated Boric Acid + (ML20198E102)
- ML20198E103 + (ML20198E103)
- ML20198E104 + (ML20198E104)
- IR 05000255/1985025 + (ML20198E106)
- ML20198E107 + (ML20198E107)
- ML20198E109 + (ML20198E109)
- ML20198E110 + (ML20198E110)
- ML20198E112 + (ML20198E112)
- ML20198E113 + (ML20198E113)
- PNO-II-85-104, on 851105,operations at Sites Shut Down Due to Flooding of Equalization Ponds,Containing Radioactive Matl Concentrations.Security Surveillance Doubled.Controls Initiated to Assure Process Liquid Waste Not Released + (ML20198E114)
- ML20198E116 + (ML20198E116)
- IR 05000424/1985037 + (ML20198E118)
- 1CAN129803, Withdraws TS Amend Request Re SG Tube Surveillance Program Submitted on 971212.Resubmittal Is Planned in Near Future + (ML20198E119)
- ML20198E120 + (ML20198E120)