Requests Extension of Time to Respond to Items A-D of IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During...Settings. Util Working W/Bwr Owners Group to Develop Scope of Sys & Set of Assumptions
ML20198E098
Person / Time
Site: Limerick Constellation icon.png
Issue date: 05/14/1986
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Butler W
Office of Nuclear Reactor Regulation
References
CON-#286-231 IEB-85-003, IEB-85-3, OL, NUDOCS 8605270274
Download: ML20198E098 (2)


Text

.

s PHILADELPHI A ELECTRIC COM PANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 JOHNS KEMPER VICE PRESIDEN T May 14, 1986 o.......

..o. u...<

Docket No. 50-353 Mr. U.

R. Butler, Director EWR Project Directorate #4 U.S. Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

Limerick Gcnerating Station, Unit 2 IE Bulletin 85-03

REFERENCE:

IE Bulletin No. 85-03 " Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settir.gs FILE:

GOVT 1-1 NRC May 7, 1986

Dear Mr. Butler:

I.E.

Bulletin 85-03 described " Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings". This bulletin requested a response to Item a and the program and completion schedule for Items b through d.

By this letter, Philadelphia Electric Company is notifying you that we are participating in the BWROG Commit-tee on I.E.

Bulletin 85-03 and requesting an extension of the May 14, 1986 due date.

In order to have a sound technical basis for plant-unique testing and analysis at Limerick 2, we are working with the BWROG Committee on I.E.

Bulletin 85-03 to develop a scope of systems, range of events, and associated set of assumptions.

The BWROG Committee on I.E.

Bulletin 85-03 is scheduled to complete its existing scope of work by Saptember 1, 1986.

We therefore request an exemption from the Bulletin Icquired response date of May 14, 1986.

The Philadelphia Electric Co. response will be provided within 60 days after NRC acceptance of the BWROG Committee position correspondence on I.E.Bulletin 85-03.

J. S. Kemper, Vice President Engineering and Research Department BDC/smd SMD51286L1045 Copy to: See att. ached Service List

\\g\\

ne m mar G

~

.i e

cc: Troy B. Conner, Jr., Esq.

Ann P. Hodgdon, Esq.

Mr. Frank R. Romano Mr. Robert L. Anthony Ms. Phyllis Zitzer Charles W. Elliot, Esq.

Barry M. Hartman, Esq.

Mr. Thcnes Gerusky Director, Penna. Emergency Management Agency Angus R. Love, Esq.

David Wersan, Esq.

Robert J. Sugarman, Esq.

Kathryn S. Lewis, Esq.

Spence W. Perry, Esq.

Jay M. Gutierrez, Esa.

Atunic Safety S Licensing Appeal Board Atanic Safety & Licensing Board Panel Docket & Service.Section Mr. E. M. Kelly Mr. Timothy R. S. Campbell I

I

.