Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198B293 + (ML20198B293)
- ML20198B297 + (ML20198B297)
- ML20198B298 + (ML20198B298)
- ML20198B299 + (ML20198B299)
- ML20198B301 + (ML20198B301)
- ML20198B302 + (ML20198B302)
- ML20198B303 + (ML20198B303)
- ML20198B304 + (ML20198B304)
- ML20198B307 + (ML20198B307)
- ML20198B308 + (ML20198B308)
- ML20198B309 + (ML20198B309)
- ML20198B310 + (ML20198B310)
- ML20198B312 + (ML20198B312)
- ML20198B314 + (ML20198B314)
- 05000316/LER-1985-013, :on 850726,frost Accumulation in Excess of Tech Spec Found within Ice Condenser Flow Passages.Caused by Excessive Moisture in Air or Sublimation of Ice.Frost Buildup Removed on 850728 + (ML20198B315)
- ML20198B319 + (ML20198B319)
- ML20198B320 + (ML20198B320)
- PLA-4828, Expresses Appreciation for Support Received by Former Project Manager C Poslusny + (ML20198B321)
- ML20198B324 + (ML20198B324)
- ML20198B325 + (ML20198B325)
- 05000271/LER-1985-010, :on 851003,insp of Conductors Revealed Contact W/Sharp Edge of End of Electrical Penetration Assembly Sleeve.Edgeguard/Insulating Matl Installed & Addl Insp Planned + (ML20198B328)
- 05000423/LER-1998-044, :on 981111,manual Reactor Trip Initiated When Differential Pressure Between a & B CWS Condensers Measured Greater than 2 Inches Water Gauge.Caused by High Levels of Debris Impinging.Modified Procedures + (ML20198B330)
- 05000255/LER-1985-019, :on 850930,review of Tech Spec Surveillance Test Procedures Identified Deficiency Re Failure to Verify Containment Isolation Initiation Due to Containment High Radiation Signal.Caused by Inadequate Review + (ML20198B331)
- ML20198B332 + (ML20198B332)
- ML20198B333 + (ML20198B333)
- ML20198B334 + (ML20198B334)
- ML20198B335 + (ML20198B335)
- ML20198B337 + (ML20198B337)
- 05000271/LER-1985-009, :on 851007,scram Signal Received from Manual Scram Circuit While Implementing Design Change.Caused by Lifting Coil Wire on Sensor Relay.Valves Shut.Contaminated Water Cleaned Up.Scram Reset + (ML20198B338)
- ML20198B339 + (ML20198B339)
- ML20198B340 + (ML20198B340)
- ML20198B341 + (ML20198B341)
- ML20198B343 + (ML20198B343)
- ML20198B346 + (ML20198B346)
- ML20198B348 + (ML20198B348)
- ML20198B349 + (ML20198B349)
- ML20198B354 + (ML20198B354)
- ML20198B355 + (ML20198B355)
- ML20198B359 + (ML20198B359)
- ML20198B360 + (ML20198B360)
- 05000483/LER-1985-046, :on 850928,Tech Spec Leak Rate Surveillances for Containment Personnel & Emergency Access Air Locks Not Performed on Due Dates of 850928 & 1005,respectively. Surveillances Completed on 851011 + (ML20198B363)
- ML20198B365 + (ML20198B365)
- 05000364/LER-1983-011-03, /03L-0:on 830208,600-volt Load Ctr 1-2R Declared Inoperable When Incoming Power Supply Breaker ER02-1 Opened. Caused by Procedural Inadequacy.Caution Tags Placed in Appropriate Locations + (ML20198B366)
- ML20198B367 + (ML20198B367)
- ML20198B368 + (ML20198B368)
- U-603113, Submits Update to Statements Made in Re Plant Plan for Excellence & Final Response to NRC Special Evaluation Team Rept + (ML20198B370)
- ML20198B372 + (ML20198B372)
- ML20198B374 + (ML20198B374)
- ML20198B375 + (ML20198B375)
- ML20198B378 + (ML20198B378)
- ML20198B380 + (ML20198B380)