ML20198B314
| ML20198B314 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 12/31/1997 |
| From: | Boyce R PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20198B317 | List: |
| References | |
| NUDOCS 9801060267 | |
| Download: ML20198B314 (1) | |
Text
. -.
n.6.,t c n.,o Ptnt min: Der t.imonck Gener: ting Station PECO ENERGY 23 r;;m, Po Don 2300 Sanstga, PA 19464 491'O P15 3311'00 Ext. 20rJ/
l December 31, 1997 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20*55
SUBJECT:
Limerick Generating Station, Units 1 and 2 Ar.nual 10CFR50.59 and Commitment Revision Report for the period July 1, 1996 through June 30, 1997 Attached is the Annual'10CFR50.59 Report as required by 10CFR50.59(b).
If you have any questions or require additional information, l --
please contact us.
Sincerely, eka h &) f -
f R. W. Boyce BDD:bdd
[
cc:
H.
J. Miller, Administrator Region I, USNRC A.
L.
Burritt, USNRC Senior Resident Inspector, LGS
$0/
~ 9901060267 971231
=
POR APDCK 05000352-R
.PDR,
i
.q t
n
. ~ -