Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198A745 + (ML20198A745)
- 05000280/LER-1983-030-03, /03l-0:on 830707,at 100% Power,Breaker for Heat Tracing Circuit 26A on Panel 9 Found Open.Breaker Closed. Circuit Verified Operational + (ML20198A746)
- ML20198A749 + (ML20198A749)
- ML20198A751 + (ML20198A751)
- ML20198A753 + (ML20198A753)
- ML20198A754 + (ML20198A754)
- 05000245/LER-1985-008-01, :on 850114,after Return to Full power,5% Increase in Recirculation Flow Required to Attain Same Core Thermal Power.Caused by Injection of Oxides from Condensate Booster Pump Into RCS + (ML20198A756)
- ML20198A757 + (ML20198A757)
- ML20198A760 + (ML20198A760)
- ML20198A762 + (ML20198A762)
- ML20198A764 + (ML20198A764)
- 05000278/LER-1985-015-02, :on 850930,combined Leakage of Type B & C Containment Leak Tests Exceeded Allowable Leak Rate Limit. Cause Will Be Investigated During Valve Insp.Valves to Be Repaired & Retested + (ML20198A767)
- ML20198A769 + (ML20198A769)
- ML20198A770 + (ML20198A770)
- ML20198A771 + (ML20198A771)
- ML20198A773 + (ML20198A773)
- IR 05000413/1998016 + (ML20198A775)
- ML20198A776 + (ML20198A776)
- ML20198A778 + (ML20198A778)
- IR 05000269/1985034 + (ML20198A779)
- ML20198A783 + (ML20198A783)
- ML20198A784 + (ML20198A784)
- ML20198A786 + (ML20198A786)
- PY-CEI-NRR-0375, Forwards Proprietary Rev I,Change 2 to SS-001, Process Control Program for NUS Process Svcs Corp Radwaste ..., Incorporating 850930 Changes to Rev H.Rev I,Change 2 Incorporated Into Rev 3 to Perry Process Control Program + (ML20198A788)
- ML20198A790 + (ML20198A790)
- ML20198A791 + (ML20198A791)
- ML20198A792 + (ML20198A792)
- ML20198A800 + (ML20198A800)
- ML20198A801 + (ML20198A801)
- ML20198A805 + (ML20198A805)
- IR 05000819/2010017 + (ML20198A806)
- ML20198A808 + (ML20198A808)
- ML20198A809 + (ML20198A809)
- ML20198A810 + (ML20198A810)
- ML20198A811 + (ML20198A811)
- ML20198A814 + (ML20198A814)
- IR 05000269/1985032 + (ML20198A816)
- 05000364/LER-1983-026-03, /03L-0:on 830602,during Auxiliary Bldg Battery Quarterly Verification,Battery Bank 2A Declared Inoperable. Caused by Decrease in Cell Voltage on Individual Cell.Top of Cell Cleaned & Cell Charged + (ML20198A820)
- ML20198A821 + (ML20198A821)
- IR 05000387/1985025 + (ML20198A822)
- ML20198A825 + (ML20198A825)
- 05000317/LER-1985-012, :on 851002,main Turbine Tripped on Erroneous Feedwater Heater 12C hi-hi Signal to Turbine Trip Circuit. Caused by Grounded Feedwater Heater Level Control Switch. Ground Control Switch Repaired + (ML20198A827)
- IR 05000327/1998010 + (ML20198A828)
- ML20198A833 + (ML20198A833)
- ML20198A834 + (ML20198A834)
- ML20198A835 + (ML20198A835)
- IR 05000456/1985041 + (ML20198A836)
- ML20198A837 + (ML20198A837)
- ML20198A839 + (ML20198A839)
- ML20198A842 + (ML20198A842)
- ML20198A843 + (ML20198A843)