Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20197H003 + (ML20197H003)
- ML20197H004 + (ML20197H004)
- ML20197H005 + (ML20197H005)
- IA-86-174, Discusses Strategy for Review & Approval of Util Requests for License Extension to 40 Yrs from Date of Ol.Strategy Consists of Safety Issues Analysis & Review of Fes + (ML20197H006)
- ML20197H006 + (ML20197H006)
- ML20197H007 + (ML20197H007)
- ML20197H008 + (ML20197H008)
- ML20197H009 + (ML20197H009)
- IA-88-319, Final Response to FOIA Request for Documents.Document Listed in App a Maintained Among PDR Files + (ML20197H010)
- ML20197H010 + (ML20197H010)
- ML20197H011 + (ML20197H011)
- ML20197H013 + (ML20197H013)
- ML20197H014 + (ML20197H014)
- ML20197H016 + (ML20197H016)
- ML20197H017 + (ML20197H017)
- IA-88-330, Final Response to FOIA Request for documents.NUREG-0200, Licensed Operating Reactor Status Summary Rept Contains Info on Nuclear Power Plant Reactor Outages.Data for May 1988 Expected First Wk of Jul 1988 + (ML20197H020)
- ML20197H020 + (ML20197H020)
- TXX-4787, Interim Significant Deficiency Rept CP-86-23 Re Potential Failure of P-10 Reactor Protection Sys Permissive.Initially Reported on 860403.Evaluation Continuing.Next Rept Will Be Submitted by 860604 + (ML20197H022)
- ML20197H023 + (ML20197H023)
- ML20197H025 + (ML20197H025)
- ML20197H026 + (ML20197H026)
- IA-88-334, Final Response to FOIA Request for Documents.Staff Located No Records Other than Insp Rept Located in PDR + (ML20197H029)
- ML20197H029 + (ML20197H029)
- IR 05000322/1984016 + (ML20197H030)
- ML20197H032 + (ML20197H032)
- ML20197H034 + (ML20197H034)
- LIC-97-0195, Forwards Proprietary Revs to FCS EPIPs & Rerp,Including Revised EPIP Index,Issued 971201,rev 33 to EPIP-OSC-2,rev 18 to EPIP-OSC-15,revised RERP Index Issued 971203 & Rev 8 to RERP Section K.Proprietary Info Withheld + (ML20197H035)
- ML20197H038 + (ML20197H038)
- ML20197H039 + (ML20197H039)
- ML20197H042 + (ML20197H042)
- ML20197H043 + (ML20197H043)
- ML20197H044 + (ML20197H044)
- 05000458/LER-1986-029, :on 860405,standby Svc Water Sys Experienced Inadvertent Start.Caused by Electrical Transient.Standby Svc Water Pump Secured + (ML20197H047)
- ML20197H048 + (ML20197H048)
- ML20197H050 + (ML20197H050)
- ML20197H051 + (ML20197H051)
- ML20197H053 + (ML20197H053)
- ML20197H057 + (ML20197H057)
- ML20197H058 + (ML20197H058)
- ML20197H060 + (ML20197H060)
- IR 05000277/1997007 + (ML20197H061)
- RBG-23-657, NPDES Noncompliance Notification:On 860505,plant Cooling Towers Overflowed.Caused by Sharp Increase in Cooling Water Due to Loss of Heat Load Precipitated by Shutdown.Water Discharged Through Yard Drains + (ML20197H063)
- ML20197H064 + (ML20197H064)
- IR 05000456/1986020 + (ML20197H066)
- 1CAN129801, Forwards Response to NRC 971202 RAI Re ANO-1 Third 10-yr ISI Program.Rev 1 to Third 10-Yr Interval ISI Program for ANO-1, Encl + (ML20197H067)
- ML20197H069 + (ML20197H069)
- NPL-97-0828, Forwards Revisions to Point Beach Nuclear Plant Security Plan sections,1.1,1.2,1.5,2.1,2.4,3.1,3.3 & 5.1,dtd 971226, Per 10CFR50.54(p).Encl Withheld Per 10CFR2,50,70 & 73 + (ML20197H073)
- ML20197H074 + (ML20197H074)
- ML20197H076 + (ML20197H076)
- ML20197H077 + (ML20197H077)
- ML20197H079 + (ML20197H079)