ML20197H042

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/86-20 & 50-457/86-18 on 851008-860425.No Violation Noted
ML20197H042
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/13/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20197H045 List:
References
NUDOCS 8605190037
Download: ML20197H042 (2)


See also: IR 05000456/1986020

Text

l

.

O

MAY 131986

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by J. W. Muffett of this

office on October 8 and November 21, 1985, and February 18-19 and April 25,

1986, of activities at Braidwood Station, Units 1 and 2, authorized by NRC

Construction Permits No. CPPR-132 and No. CPPR-133 and to the discussion of

our findings with D. L. Shamblin at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

1

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

)

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

C ri D :nl S i ". 3 by J. J. !*:; c : r ',

I

J. J. Harrison, Chief

Engineering Branch

Enclosure:

Inspection Reports

No. 50-456/86020(DRS);

No. 50-457/86018(DRS)

See Attached Distribution

.

Yd3

RIII

R

RIII

Y

WJ

R 11

JM

w

Muffett/rr

Little

Gardner

rison

Weil

sj,

p

w

sa

s/ng

8605190037 860513

i

PDR

ADOCK 05000456

ll\\

gg j

--

_ _ .

_

_ _ _ _ _ _ _

_

,

.

Commonwealth Edison Company

2

Nigy 131986

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Superintendent

i

P. L. Barnes, Regulatory

.

Assurance Supervisor

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

l

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Moore, ELD

G. Berry, ELD

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

i