Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196G134 + (ML20196G134)
- ML20196G135 + (ML20196G135)
- ML20196G136 + (ML20196G136)
- ML20196G137 + (ML20196G137)
- ML20196G138 + (ML20196G138)
- ML20196G141 + (ML20196G141)
- ML20196G142 + (ML20196G142)
- ML20196G145 + (ML20196G145)
- ML20196G146 + (ML20196G146)
- ML20196G147 + (ML20196G147)
- ML20196G149 + (ML20196G149)
- RC-97-0093, Radiological Environ Monitoring Rept VC Summer Nuclear Station for Operating Period 960101-1231 + (ML20196G151)
- ML20196G152 + (ML20196G152)
- ML20196G153 + (ML20196G153)
- ML20196G154 + (ML20196G154)
- BSEP-98-0228, :on 980708,excessive Feedwater Temperature Reduction as Result of Loss of Stator Cooling Water with Main Turbine,Was Determined.Caused by Failure to Analyze Worst Case Lfwh Transient.Databank Updated.With + (ML20196G155)
- ML20196G157 + (ML20196G157)
- HL-5790, Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants + (ML20196G159)
- ML20196G160 + (ML20196G160)
- ML20196G162 + (ML20196G162)
- ML20196G163 + (ML20196G163)
- ML20196G164 + (ML20196G164)
- ULNRC-03927, Forwards Response to NRC RAI Re TS Section 3.3, Instrumentation, Converting to Improved Tech Specs. Requested Info Is Encl as Well as Any Addl Changes Needed for Section 3.3 as Identified by Licensee + (ML20196G165)
- 05000369/LER-1996-005, Forwards Suppl Info Re LER 96-005,rev 1 Re TS Required Shutdown of Both Units Due to Failed Surveillance Test of Vital Battery Bank Evcc.Rev Changes Commitment Re Vital Battery Vank Evcc + (ML20196G168)
- ML20196G171 + (ML20196G171)
- ML20196G173 + (ML20196G173)
- ML20196G174 + (ML20196G174)
- ML20196G175 + (ML20196G175)
- 05000443/LER-1997-006, :on 970407,determined That Potential Fuel Handling Accident in Containment Could Result in Radiological Consequences.Cause Due to non-conservative Assumptions.Evaluated CA Options + (ML20196G176)
- 05000298/LER-1997-002, :on 970409,SRVs Were Found Outside TS Limiting Safety Sys Setting.Caused by Corrosion Bonding of Pilot Disc to Pilot Seat.New Platinum-Stellite Has Been Installed in All Eight SRVs Prior to Reinstallation + (ML20196G179)
- ML20196G180 + (ML20196G180)
- ML20196G181 + (ML20196G181)
- 05000245/LER-1997-023, Forwards LER 97-023-00 Per 10CFR50.73(a)(2)(iv).Commitments Made by Util,Submitted + (ML20196G182)
- ML20196G184 + (ML20196G184)
- ML20196G186 + (ML20196G186)
- ML20196G187 + (ML20196G187)
- 05000245/LER-1997-023-01, :on 970409,ESF Actuation Occurred While Testing Was Being Conducted on Reactor Vessel Level Indicating Switch.Caused by Personnel Error.I&C Personnel Were Briefed to re-emphasize Roles & Responsibilities + (ML20196G188)
- ML20196G189 + (ML20196G189)
- ML20196G192 + (ML20196G192)
- ML20196G193 + (ML20196G193)
- 05000263/LER-1997-006, :on 970408,emergency DG Started While Electrical Maintenance Personnel Were Performing Monthly Degraded Safeguards Bus Voltage Surveillance.Caused by Personnel Error.Lessons Learned Meeting,Held + (ML20196G196)
- ML20196G197 + (ML20196G197)
- LIC-99-0056, Forwards Rev 2 to EA-FC-90-082, Potential Over- Pressurization of Containment Penetration Piping Following Main Steam Line Break in Containment, to Facilitate Review of Response to GL 96-06 + (ML20196G199)
- PNO-II-97-028, on 970514,notified NRC of Discovered Loss of Six Sealed Sources,Formerly Used to Calibr Their Dose Calibrator.Licensee Investigating Incident & Intends to Develop Action Plan to Prevent Recurrence + (ML20196G200)
- ML20196G201 + (ML20196G201)
- 05000309/LER-1997-008, :on 970411,IST Deficiencies That Affected Operability Were Discovered.Valves Were Not Considered Part of IST Program.Operability Determination & Initial Engineering Evaluations Performed + (ML20196G202)
- ML20196G203 + (ML20196G203)
- ML20196G206 + (ML20196G206)
- ML20196G208 + (ML20196G208)
- 05000482/LER-1997-005, :on 970411,violation of TS 3.8.1.1 B EDG Operability Was Identified.Caused by Human Error.Performance Improvement Request Initiated to Document Event + (ML20196G209)
- ML20196G210 + (ML20196G210)