Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196E330 + (ML20196E330)
- PNO-V-88-014, on 880219,inadvertent Safety Injection Actuation Occurred While Testing of Actuation Logic Matrix Was in Progress & W/Unit at 100% Power.Unit Stabilized W/O Complication & Safety Injection Components Restored + (ML20196E332)
- ML20196E333 + (ML20196E333)
- ML20196E334 + (ML20196E334)
- SNRC-1431, Shoreham Nuclear Power Station Annual Operating Rept,Jan- Dec 1987 + (ML20196E336)
- ML20196E337 + (ML20196E337)
- ML20196E338 + (ML20196E338)
- ML20196E339 + (ML20196E339)
- ML20196E340 + (ML20196E340)
- ML20196E341 + (ML20196E341)
- ML20196E342 + (ML20196E342)
- ML20196E344 + (ML20196E344)
- ML20196E349 + (ML20196E349)
- ML20196E350 + (ML20196E350)
- ML20196E352 + (ML20196E352)
- ML20196E354 + (ML20196E354)
- ML20196E358 + (ML20196E358)
- ML20196E362 + (ML20196E362)
- ML20196E363 + (ML20196E363)
- ML20196E364 + (ML20196E364)
- ML20196E365 + (ML20196E365)
- ML20196E366 + (ML20196E366)
- ML20196E368 + (ML20196E368)
- ML20196E369 + (ML20196E369)
- ML20196E370 + (ML20196E370)
- ML20196E371 + (ML20196E371)
- IR 05000425/1988065 + (ML20196E372)
- IR 05000259/1988006 + (ML20196E376)
- ML20196E377 + (ML20196E377)
- IR 05000322/1987021 + (ML20196E378)
- ML20196E380 + (ML20196E380)
- ML20196E381 + (ML20196E381)
- IR 05000298/1988020 + (ML20196E382)
- ML20196E384 + (ML20196E384)
- ML20196E385 + (ML20196E385)
- RBG-27450, Corrected Monthly Operating Rept for Jan 1988 + (ML20196E386)
- ML20196E387 + (ML20196E387)
- ML20196E388 + (ML20196E388)
- ML20196E391 + (ML20196E391)
- BECO-88-026, Forwards GE Proprietary Rept, Tech Spec Improvement Analysis for Reactor Protection Sys for Pilgrim Nuclear Power Station, Supporting Proposed Changes to Tech Spec Tables 3.1.1 & 3.2.A.Rept Withheld (Ref 10CFR2.790(b)(1)) + (ML20196E394)
- ML20196E397 + (ML20196E397)
- ML20196E398 + (ML20196E398)
- PNO-II-88-069, on 881129,spurious Actuation of 19 Out of 30 Alert & Notification Sirens Occurred.Preliminary Info Indicated That Spurious False Activation Caused by Old Activation Sys Decommissioned Later on Same Day + (ML20196E400)
- ML20196E403 + (ML20196E403)
- ML20196E404 + (ML20196E404)
- ML20196E405 + (ML20196E405)
- ML20196E406 + (ML20196E406)
- ML20196E408 + (ML20196E408)
- ML20196E409 + (ML20196E409)
- ML20196E410 + (ML20196E410)
- 05000254/LER-1988-004, :on 880126,Impell Corp Notified Station That Line 1-0216-1/2 Inches Not Qualified to FSAR Criteria for Allowable Stress.Caused by Design Error.Impell Corp Developing Mod to Correct Condition + (ML20196E413)