ML20196E368
| ML20196E368 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 06/22/1988 |
| From: | Cox R AFFILIATION NOT ASSIGNED |
| To: | NRC OFFICE OF THE SECRETARY (SECY) |
| References | |
| FRN-53FR16435, RULE-PR-50 53FR16435-00899, 53FR16435-899, NUDOCS 8807010607 | |
| Download: ML20196E368 (1) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
DOCKET fluMBER
$7I PROPOSED.ULE b - En Qg.:c.i 53 PR./b 4 3 Sj' i
M M 23 P132 brdune,27, 1988OC5h]t>TIr,&j a
Rathi Secretary of the Comdsrion Attn: Docketing an] Se:vico Branch U. S. Nuclear Reguistori Commission Washington, DC 20555' D$nt Sir, 3
~
4 i
,14.rerongly urge t'co Commission to sul port the proposed "Interpretive Rule" regarding the license rpquirements for low power testing at Seabrook Station.
I tave' worked on Seabrook Project 3.nce 1972 and reside within the 10 mile E?Z.
8
/
,j The' prompt nothdicatiqn system is an'> important aspect of the overall
- I*'M emergency evacuation plan, however, I do not feel it is a requirement for low l'
power teuting.
I base my opinion on my knowledge of the safety and reliability
'lant design.
of the p/
Please resolve this issue so New Englands future power needs can be met.
I Sincerely yours
!]
l
^
Robert R. Cox G.i g.
f 8 Thelma Drive Exeter, Nh 03833 1
/
\\ )<
/
[
i
,s ji
,1 I/
,4
[
A j
j, e
.I 3,
is i
r
/
i t
i 9
/
/
880701060Y B00622 ' i.
t i
PDR Pn
)
.1 s
50 T3FRik435' Png >
~
t' l
OS -/ b
,t _
.(
...w t.
.