Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000354/LER-1999-006-01, :on 990518,unexpected Actuation of B Channel PCIS Occurred.Caused by Personnel Error.Addl Training Will Be Provided to Operations Personnel to Preclude Addl Unexpected ESF Actuations + (ML20196A557)
- ML20196A559 + (ML20196A559)
- ML20196A561 + (ML20196A561)
- ML20196A562 + (ML20196A562)
- ML20196A563 + (ML20196A563)
- ML20196A564 + (ML20196A564)
- ML20196A565 + (ML20196A565)
- ML20196A566 + (ML20196A566)
- ML20196A567 + (ML20196A567)
- ML20196A569 + (ML20196A569)
- ML20196A571 + (ML20196A571)
- IR 05000352/1987020 + (ML20196A572)
- ML20196A574 + (ML20196A574)
- ML20196A578 + (ML20196A578)
- ML20196A579 + (ML20196A579)
- ML20196A580 + (ML20196A580)
- ML20196A581 + (ML20196A581)
- ML20196A583 + (ML20196A583)
- 05000322/LER-1988-018, :on 881101,RWCU Isolation Occurred.Caused by Inadequate Job Briefing Between Watch Engineer & Operating Crew.Operators Actions During Future Performance of Faston Tab Installations Will Be Proceduralized + (ML20196A584)
- ML20196A586 + (ML20196A586)
- 05000382/LER-1988-013, :on 880528,fire Protection Sprinkler Found Isolated After Restoration from Testing.Caused by Personnel Error.Procedures Being Revised to Require Contaminated Valve Lineup Sheets Be Photocopied or Verified + (ML20196A587)
- IR 07100116/2012031 + (ML20196A594)
- ML20196A597 + (ML20196A597)
- IR 05000346/1987031 + (ML20196A598)
- ML20196A599 + (ML20196A599)
- ML20196A600 + (ML20196A600)
- ML20196A602 + (ML20196A602)
- 1CAN069905, Forwards non-proprietary Version of Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs + (ML20196A604)
- ML20196A605 + (ML20196A605)
- ML20196A606 + (ML20196A606)
- ML20196A611 + (ML20196A611)
- ML20196A612 + (ML20196A612)
- ML20196A613 + (ML20196A613)
- ML20196A614 + (ML20196A614)
- ML20196A615 + (ML20196A615)
- ML20196A616 + (ML20196A616)
- ML20196A617 + (ML20196A617)
- ML20196A618 + (ML20196A618)
- ML20196A619 + (ML20196A619)
- ML20196A620 + (ML20196A620)
- ML20196A622 + (ML20196A622)
- PY-CEI-NRR-2328, Submits Response to Reporting Requirement Two of NRC GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, .Seventh RFO Is Tentatively Scheduled to Begin on 990410 + (ML20196A623)
- ML20196A625 + (ML20196A625)
- ML20196A627 + (ML20196A627)
- ML20196A628 + (ML20196A628)
- ML20196A629 + (ML20196A629)
- B17525, Forwards Revised NRC Form 396, Certification of Medical Exam by Facility Licensee Supporting Physician Rept for Licensed Operator.Encl Withheld,Per 10CFR2.790(a)(6) + (ML20196A630)
- IR 07100020/2012030 + (ML20196A634)
- 05000219/LER-1998-018, :on 981023,DG 2 Failed to Start from App R Local Shutdown Panel During Functional Test.Caused by Incorrectly Designed Wiring.Incorrect Wiring Was Modified & Demonstrated by Testing to Be Correct.With + (ML20196A635)
- IA-88-461, Trip Rept of 610313 Prelicensing Visit to Atlantic Refining Co Re Qualifications of Radiography Personnel & Institution of Training Program Proposed in Jk Deichler 601006 & 1202 Ltrs + (ML20196A636)
- ML20196A636 + (ML20196A636)