ML20196A567

From kanterella
Jump to navigation Jump to search
Notifies of Change in Operator Status of Pr Schelenz, License OP-11243.Determined That Individual No Longer Meets Standards as Set Forth in Section 5.4 of Ansi/Ans 3.4-1983
ML20196A567
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/23/1998
From: Von Suskil J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9811300052
Download: ML20196A567 (4)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ ,

r James D. von Su:kil Vce Presidant

& Lirnerick Generatnig Station w

PECO NUCLEAR PEco Energy cornpany A Unit of PECO Energy $1iI sanato0a, PA 19464-0920 61o 718 3000 / Fax 61o 718 3008 Pager 1800 672 2285 #0271 Internet address: jvonsuskil@ peco-energy com 10CFR50.74(c) 10CFR55.25 November 23,1998 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Limerick Generating Station, Units 1 and 2 Notification of a Change in Operator Status This letter serves as notification in accordance with the requirements of 10CFR55.25 and 10CFR50.74(c) of the diagnosis of certain medical conditions and the resulting change in status of the Reactor Operator identified below.

Name Docket No. License No.

Peter R. Schelenz 55-62081 OP-11243 On October 21,1998, a medical examiner from PECO Energy Company's Occupational Health and Safety Department determined that this individual no longer meets the standards as set forth in Section 5.4 of American Nuclear Society Standard ANSI /ANS 3.4-1983, Medical Certification and Monitoring of Personnel Requiring Operator Licenses for Nuclear Power Plants," as originally certified to the NRC.

The specific medical condition for this individual is identified in Attachment 2, which contains confidentialinformation, the disclosure of which would constitute an unwarranted invasion of the personal privacy of the individual involved. Therefore, the information in Attachment 2 is being submitted to the Commission with a request that it be withheld from public disclosure in accordance with 10CFR2.790(a)(6) of the Commission's Regulations, and is only being submitted to the Regional Administrator, U.S. NRC Region 1. Attachment 1 to this letter is an Affidavit setting forth the reasons in support of this request to withhold from public disc!osure. The medical condition for this individual is being accommodated through an appropriate medical regime prescribed by the individual's primary care provider.

l 9811300052 981123 U PDR ADOCK 05000352L V PDRi

$60035 W 1

L Docket Nos. 50-352 and 50-353

- November 23,1998 Page 2 In accordance with the requirements of 10CFR55.23(b), also attached for this Reactor Operator is a completed NRC Form 396, " Certification of Medical Examination by Facility Licensee," requesting a conditional license for the individual.

If you have any questions or require any additional information, please contact Ruth Brobst, Nurse Practitioner at (610) 718-2055. Thank you for your attention in this matter.

Very truly yours, l

Attachments (Region I only) l cc: H. J. Miller, Administrator, Region I, USNRC w/ attachments A. L. Burritt, USNRC Senior Resident inspector, LGS w/o attachments I

6 I

t i

I I

i e  :

1 i l l ATTACHMENT 1 i

Limerick Generating Station Units 1 and 2 i Docket Nos. 50-352 50-353 j License Nos. NPF-39 NPF-85 November 23,1998 Affidavit i

i r

I e , . ,.,4 . . , _ , . , . , y_. - -._... .

a Attachment 1 COMMONWEALTH OF PENNSYLVANIA ss.

COUNTY OF MONTGOMERY .

1 James D. von Suskil, being first duly swom, deposes and states as follows:

1. I am Vice President, Limerick Generating Station of PECO Energy Company and I am duly authorized to execute this affidavit. j
2. PECO Energy Company has requested, in accordance with Section 2.790 of the Commission's Regulations, that certain information being submitted to  !

the Commission in Attachment 2 to this letter be withheld from public disclosure. j

3. This information contains personnel and medical files, the disclosure of which would constitute a clearly unwarranted invasion of the personal privacy of the individualinvolved.
4. The information contained in Attachment 2 is of the type customarily held in confidence by PECO Energy Company and is not customarily disclosed to the public. The information has not been disclosed to the public and is not available from public sources.
5. The information should be withheld from public di:: closure by the NRC because such disclosure is not required in the public interest and such disclosure would constitute an unwarranted invasion of the personal privacy of theindividualinvolved.

Jpgies D. von Suskil Vtc'e President - LGS Subscribed and swom to before me this)3#day of November,1998.

OA Y Notarf9ublic NoterialSeal i

SWJ. Adams.Nessay F%eec Umsnak Tsup., Monegamery Couer MyCommissionEnsures Aug.31,300f Member, Pennevwme Assocean at Notenes