Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195H898 + (ML20195H898)
- ML20195H899 + (ML20195H899)
- ML20195H902 + (ML20195H902)
- PY-CEI-NRR-2405, Informs NRC That PNPP Staff Has Implemented Formal Industry Position on Severe Accident Mgt + (ML20195H903)
- ML20195H904 + (ML20195H904)
- ML20195H905 + (ML20195H905)
- ML20195H906 + (ML20195H906)
- ML20195H907 + (ML20195H907)
- ST-HL-AE-2445, Responds to NRC Re Violation Noted in Insp Rept 50-499/87-70.Corrective Actions:Review of Design Details for nonsafety-related Civil/Structural Attachments to Category I (Class 3) Structural Steel in Unit 2 Performed + (ML20195H908)
- IR 05000267/1988013 + (ML20195H909)
- ML20195H911 + (ML20195H911)
- W3P88-1987, Forwards Addl Info to Support Util 880920 Request for Amend to License NPF-38 Deleting Fire Protection Requirements from Tech Spec & Adopting Std Fire Protection License Condition + (ML20195H914)
- ML20195H915 + (ML20195H915)
- PNO-II-99-025, on 990615,CR Operators Manually Shutdown Unit 2 Reactor from 41% Power,Due to Decreasing Condenser Vacuum. Cause of Decreasing Vacuum Has Not Been Determined.All Rods Installed as Required & All Safety Sys Functioned Properly + (ML20195H918)
- ST-HL-AE-2468, Responds to NRC Re Violations Noted in Insp Repts 50-498/87-70 & 50-499/87-70.Corrective Actions:Reanalysis Performed Assuming Bolt Preload Resulting from Applied Torque of 25 ft-pounds + (ML20195H919)
- ML20195H922 + (ML20195H922)
- ML20195H923 + (ML20195H923)
- ML20195H924 + (ML20195H924)
- ML20195H926 + (ML20195H926)
- ML20195H927 + (ML20195H927)
- ML20195H928 + (ML20195H928)
- 05000461/LER-1999-008, :on 990514,reactor Vessel Level Transient Was Noted.Caused by Failure of Motor Driven Reactor FW Pump Regulating Valve.Initiated Manual Scram & Fixed Procedure Discrepancies + (ML20195H929)
- ML20195H930 + (ML20195H930)
- ML20195H931 + (ML20195H931)
- ML20195H932 + (ML20195H932)
- ML20195H934 + (ML20195H934)
- A99019, Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With + (ML20195H935)
- ML20195H936 + (ML20195H936)
- ML20195H937 + (ML20195H937)
- 05000382/LER-1987-028, :on 871211,reactor Trip Occurred Due to Inadvertent Shutting of Msiv.Caused by Solenoid Valve Stuck Open During Testing.Solenoid Valve Replaced & MSIV Tested Successfully Prior to Restarting of Plant + (ML20195H938)
- ML20195H939 + (ML20195H939)
- ML20195H940 + (ML20195H940)
- ML20195H941 + (ML20195H941)
- ML20195H942 + (ML20195H942)
- ML20195H943 + (ML20195H943)
- ML20195H945 + (ML20195H945)
- ML20195H950 + (ML20195H950)
- ML20195H951 + (ML20195H951)
- ML20195H952 + (ML20195H952)
- ML20195H955 + (ML20195H955)
- IR 05000267/1988015 + (ML20195H957)
- ML20195H959 + (ML20195H959)
- ML20195H961 + (ML20195H961)
- ML20195H962 + (ML20195H962)
- 05000461/LER-1999-007, :on 990513,main Steam Isolation Valve Leakage Control Sys Was Noted Outside Design Basis.Caused by Design Error.Revised Setpoint for Each MSIV-LCS Flow Measurement Channel to Meet Design Basis of Plant + (ML20195H963)
- ML20195H964 + (ML20195H964)
- ML20195H965 + (ML20195H965)
- ML20195H967 + (ML20195H967)
- ML20195H970 + (ML20195H970)
- ML20195H972 + (ML20195H972)
- ML20195H973 + (ML20195H973)