Text
,.
,
..
-
.
,
JUN 2 21988
,
Docket No. 50-456
Docket No. 50-457
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Senior Vice President
Post Office Box 767
Chicago, IL 60690
'
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. A. G. Januska and
R. Bocanegra of this office on May 24-26, 31 through June 2, 1988, of activities at
Braidwood Nuclear Power Station, Units 1 and 2, authorized by NRC Operating
Licenses No. NPF-72 and No. NPF-77, and to the discussion of our findings with
Mr. R. Querio and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations _, and
interviews with personnel.
In addition, our Mobile Laboratory was at the
site during the inspection to perform independent measurements of radioactivity.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice.
A written response
is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter, the enclosures, and your response to this letter will be
placed in the NRC Public Document Room.
The responses directed by this letter and the accompanying Notice are not
s
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
'
Sincerely,
"Originni signed by fi. Sno11't
W. D. Shafer, Chief
Radiological Protection Branch
Enclosures:
c
1.
.
JO
2.
Inspection Reports
Q8Q
No. 50-456/88017(DRSS); and
,
gg
No. 50-457/88017(DRSS)
(o o
42
M
g
See Attached Distribution
M
u)@
I 'p %')
SC
RIII
RI
R'
RII
RIII
l
h
d
h
Shafer ['
co a
Januska/ims
Bocanegra
S umacher
M
\\ k
p4
yp/P
O
.
__
.
..
..
,.
'
.
..
'
.
.
.
Commonwealth Edison Company
2-
JUN 22 M
Distribution
cc w/ enclosures:
T. J. Maiman, Vice President,
PWR Operations
H. Bliss, Nuclear
Licensing Manager.
S. Hunsader, Manager of Projects
M. Lohmann, Project Construction
and Startup Superintendent
R. E. Querio, Station Manager
P. L. Barnes, Regulatory
Assurance Supervisor
<
DCD/DCB (RIDS)
i
Licensing Fee Management Branch
l
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
l
,
D..W. Cassel, Jr., Esq.
'
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
i
E. Chan, 0GC
l
G. Berry, 0GC
Stephen P. Sands, NRR
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
The Honorable Ivan W. Smith, ASLB
The Honorable Gary J. Edles, ASLAP
j
The Honorable Dr. W. Reed Johnson, ASLAP
.l
<
The Honorable Christine N. Kohl, ASLAP
l
l