Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195H824 + (ML20195H824)
- ML20195H826 + (ML20195H826)
- ML20195H829 + (ML20195H829)
- ML20195H834 + (ML20195H834)
- ML20195H835 + (ML20195H835)
- ML20195H838 + (ML20195H838)
- ML20195H840 + (ML20195H840)
- ML20195H841 + (ML20195H841)
- IR 05000382/1998013 + (ML20195H842)
- ML20195H843 + (ML20195H843)
- ML20195H845 + (ML20195H845)
- ML20195H846 + (ML20195H846)
- ML20195H850 + (ML20195H850)
- ML20195H852 + (ML20195H852)
- ML20195H853 + (ML20195H853)
- ML20195H854 + (ML20195H854)
- B17485, Forwards Rev 4 to Operational Readiness Plan for Millstone Unit 2.Plan Covers Restart Readiness,Operational Assessment, Startup & Power Ascension + (ML20195H855)
- ML20195H856 + (ML20195H856)
- ML20195H857 + (ML20195H857)
- ML20195H858 + (ML20195H858)
- PY-CEI-NRR-2409, Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With + (ML20195H860)
- RA98-826, Responds to NRC Re Violations Noted in Insp Rept 70-0036/98-04.Corrective Actions:Radiation Worker Refresher Training Was Conducted for Plant Operations Personnel & NCS Training Was Provided for Plant Personnel + (ML20195H863)
- ML20195H864 + (ML20195H864)
- 3F0688-11, Forwards Rept Re Seismic Qualifications of Control Complex Control Air Sys.Until Appropriate Util Mods Completed, Operability of Sys During Design Basis Seismic Event Based on Listed Conditions + (ML20195H865)
- ML20195H866 + (ML20195H866)
- ML20195H868 + (ML20195H868)
- ML20195H871 + (ML20195H871)
- ML20195H873 + (ML20195H873)
- 3F0699-07, Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With + (ML20195H874)
- B17804, Monthly Operating Rept for May 1999 for Mnps,Unit 2.With + (ML20195H875)
- ML20195H876 + (ML20195H876)
- U-603223, Illinova Corp 1998 Annual Rept. with + (ML20195H878)
- ML20195H879 + (ML20195H879)
- ML20195H880 + (ML20195H880)
- ML20195H881 + (ML20195H881)
- AECM-88-0121, Forwards Addl Info Re Generic Ltr 83-28,Item 2.2.1, Equipment Classification & Vendor Interface (Program for All Safety-Related Components), Per 880511 Request. Discussion of Computer Data Base Features Encl + (ML20195H882)
- ML20195H884 + (ML20195H884)
- ML20195H886 + (ML20195H886)
- ML20195H887 + (ML20195H887)
- ML20195H888 + (ML20195H888)
- ML20195H889 + (ML20195H889)
- 05000336/LER-1999-008, :on 990511,AFW Regulating Valve Failed Monthly Inservice Operability Test,Which Strokes Valve Through Full Range of Motion.Caused by Mechanical Failure of AFW Regulating Valve non-safety Positioner.Procedures Revised + (ML20195H893)
- ML20195H895 + (ML20195H895)
- 3F1198-09, Requests Extension for CR-3 Plant Specific Responses to GL 97-01,until 990115 + (ML20195H896)
- ML20195H897 + (ML20195H897)
- ML20195H898 + (ML20195H898)
- ML20195H899 + (ML20195H899)
- ML20195H902 + (ML20195H902)
- PY-CEI-NRR-2405, Informs NRC That PNPP Staff Has Implemented Formal Industry Position on Severe Accident Mgt + (ML20195H903)
- ML20195H904 + (ML20195H904)
- ML20195H905 + (ML20195H905)