Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000456/1986013 + (ML20195E480)
- VPN-059-98, Forwards Rev 51 to Trojan Nuclear Plant Security Plan.Rev Withheld,Per 10CFR73.21 + (ML20195E481)
- ML20195E482 + (ML20195E482)
- ML20195E484 + (ML20195E484)
- ML20195E485 + (ML20195E485)
- ML20195E488 + (ML20195E488)
- ML20195E489 + (ML20195E489)
- ML20195E491 + (ML20195E491)
- ML20195E493 + (ML20195E493)
- ML20195E494 + (ML20195E494)
- ML20195E496 + (ML20195E496)
- ML20195E497 + (ML20195E497)
- ML20195E498 + (ML20195E498)
- ML20195E499 + (ML20195E499)
- ML20195E501 + (ML20195E501)
- ST-HL-AE-1670, Submits Revised Schedule for Response to 10CFR50.62, Requirements for Reduction of Risk from ATWS Events.... Response Will Be Submitted within 180 Days of Receipt of NRC SER on WCAP 18585, ATWS Mitigation Sys Actuation.. + (ML20195E502)
- ML20195E505 + (ML20195E505)
- ML20195E506 + (ML20195E506)
- ML20195E513 + (ML20195E513)
- ML20195E514 + (ML20195E514)
- 05000498/LER-1988-057, :on 881004,during Maint Outage,Train a ESF Load Sequencer Actuated,Initiating Short Circuit Which Caused Cascading Failure & Malfunctions of Sequencer Components. Caused by Personnel Error.Module Replaced + (ML20195E515)
- ML20195E516 + (ML20195E516)
- ML20195E517 + (ML20195E517)
- ML20195E519 + (ML20195E519)
- NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With + (ML20195E521)
- ML20195E522 + (ML20195E522)
- ML20195E523 + (ML20195E523)
- ML20195E524 + (ML20195E524)
- ML20195E527 + (ML20195E527)
- ML20195E528 + (ML20195E528)
- ML20195E531 + (ML20195E531)
- ML20195E532 + (ML20195E532)
- ML20195E534 + (ML20195E534)
- AECM-86-0128, Withdraws Apr 1982 Commitment to Add Four motor-operated Valves to Msiv,Rhr & LPCS Instrument Lines,Deferred to Second Refueling Outage by Dec 1985 Request.Withdrawal Based on Results of Encl Engineering Analysis & Evaluation + (ML20195E535)
- ML20195E536 + (ML20195E536)
- ML20195E537 + (ML20195E537)
- 05000338/LER-1998-007-01, :on 981015,3B Casing Cooling Pump Failed to Develop Discharge Pressure & Recirculation.Caused by Air Binding.Subject Pump Was Vented of Air,Started & Tested Satisfactorily.With + (ML20195E539)
- ML20195E540 + (ML20195E540)
- ML20195E541 + (ML20195E541)
- ML20195E542 + (ML20195E542)
- ML20195E543 + (ML20195E543)
- ML20195E544 + (ML20195E544)
- ML20195E545 + (ML20195E545)
- ML20195E546 + (ML20195E546)
- ML20195E547 + (ML20195E547)
- ML20195E548 + (ML20195E548)
- ML20195E549 + (ML20195E549)
- ML20195E551 + (ML20195E551)
- ML20195E552 + (ML20195E552)
- ML20195E553 + (ML20195E553)
- 0CAN068601, Responds to Generic Ltr 86-04 & 860213 Request Re Plans Concerning Mods to Shift Technical Advisor Program in Light of Policy Statement on Engineering Expertise on Shift. Program Described + (ML20195E554)