Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- CEO-88-319, Forwards Response to Violations Noted in Insp Rept 50-312/88-29.Response Withheld (Ref 10CFR2.790) + (ML20195D942)
- PNO-I-99-028, on 990608,Susquehanna Unit 2 Automatically Shut Down from 100% Power,Due to Failure in a Main Transformer. Region I Public Affairs Prepared to Respond to Media Inquires.Resident Inspectors on-site & Responded + (ML20195D943)
- ML20195D944 + (ML20195D944)
- ML20195D946 + (ML20195D946)
- ML20195D947 + (ML20195D947)
- ML20195D950 + (ML20195D950)
- ML20195D951 + (ML20195D951)
- ML20195D952 + (ML20195D952)
- ML20195D953 + (ML20195D953)
- 05000455/LER-1987-019-03, :on 871002,reactor Tripped Due to Turbine Trip from High Steam Generator Level.Caused by Equipment Operator Opening Sys Auxiliary Transformer Instead of Main Power Transformer Disconnects.Operator Disciplined + (ML20195D956)
- ML20195D958 + (ML20195D958)
- ML20195D961 + (ML20195D961)
- ML20195D962 + (ML20195D962)
- ML20195D965 + (ML20195D965)
- 05000301/LER-1986-002-01, :on 860430,control Operator Noticed That Analog RPI for Shutdown Bank B Misaligned.Shutdown Bank B Withdrawn.Cause Could Not Be Confirmed But Failure of Mechanical Demand Counter Suspected + (ML20195D966)
- PNO-II-99-023, on 990601,one CEA Descended Into Reactor Core for Unknown Reasons,With Unit 2 Rated Power.Licensee Noted Voltage Fluctuations on CEA Power Supplies.Licensee Is Continuing to Investigate CEA Problems + (ML20195D967)
- ML20195D971 + (ML20195D971)
- IR 05000072/1988001 + (ML20195D972)
- PNO-I-88-115, on 881101,reactor Scrammed from Full Power Due to Main Turbine Trip.Caused by Loss of Electrical Field on Main Generator.Reactor Stabilized in Shutdown Condition & Entered Into 5-day Outage,Including Deinerting of Drywell + (ML20195D975)
- ML20195D979 + (ML20195D979)
- ML20195D981 + (ML20195D981)
- ML20195D982 + (ML20195D982)
- L-98-212, Informs That Necessary Changes to Two Operating Surveillance Tests Can Not Be Completed by 981111.Necessitates Rev to Commitment to Develop New Surveillance Criteria by 981230 + (ML20195D985)
- ML20195D987 + (ML20195D987)
- ML20195D990 + (ML20195D990)
- ML20195D993 + (ML20195D993)
- IR 05000461/1988001 + (ML20195D994)
- ML20195D995 + (ML20195D995)
- B12945, Application for Amend to License NPF-49,decreasing Reactor Trip Setpoint & ESFAS Instrumentation Setpoint for Steam Generator Water Level Low Low Trip Setpoint from 23.5% to 20.73% of Narrow Range Instrument Span.Fee Paid + (ML20195D996)
- ML20195E003 + (ML20195E003)
- ML20195E004 + (ML20195E004)
- ML20195E005 + (ML20195E005)
- ML20195E006 + (ML20195E006)
- 05000275/LER-1984-037, :on 860506,engineers Discovered That 840305 Surveillance Interval for Containment Fan Cooler Unit Exceeded.Caused by Personnel Error.Personnel Counseled + (ML20195E009)
- ML20195E010 + (ML20195E010)
- ML20195E011 + (ML20195E011)
- ML20195E013 + (ML20195E013)
- ML20195E014 + (ML20195E014)
- ML20195E018 + (ML20195E018)
- ML20195E019 + (ML20195E019)
- ML20195E021 + (ML20195E021)
- ML20195E022 + (ML20195E022)
- ML20195E024 + (ML20195E024)
- ML20195E028 + (ML20195E028)
- IR 05000443/1998006 + (ML20195E029)
- ML20195E030 + (ML20195E030)
- ML20195E031 + (ML20195E031)
- IR 05000020/1988004 + (ML20195E035)
- 05000440/LER-1986-008, :on 860430,containment Fire Hose Reel Inboard/ Outboard Supply Isolation Valves Discovered in Open Position.Valves Opened Before Start of Core Alterations on 860321 by Shift Operators.Personnel Counseled + (ML20195E038)
- U-603099, Provides 120-day Response to GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment + (ML20195E040)
- 05000348/LER-1986-006, :on 860429,RHR Sys Train B Inoperable.Caused by Personnel Error,Resulting in Improper Opening & Tagging of Breaker.Personnel Counseled & Main Control Board Verification Procedures Developed + (ML20195E041)