ML20195D944
| ML20195D944 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 10/28/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20195D948 | List: |
| References | |
| NUDOCS 8811070199 | |
| Download: ML20195D944 (3) | |
See also: IR 05000498/1988062
Text
_ - _ _ - _ - _ _ _ _ _ _ _ _ - - _ _ _ _ _ _
'
,
.
,
OCT 2 81998
-
In Reply Refer To:
Dockets:
50-498/88-62
50-499/88-62
Houston Lighting & Power Company
ATTH:
J. H. Goldberg, Group Vice
President, Nuclear
P.O. Box 1700
Houston, Texas 77001
Gentlemen:
This refers to the two part inspectinn conducted by Messrs. H. F. Bundy and
T. O. McKernon of this office during the period September 12-14, 1988, and
October 10-14, 1088, of activities aathorized by NRC Operating License NPF-76
and Construction Permit CPPR-129, for the South Texas Project, Units 1 and 2,
and to the discussion of our findings with Messrs. M. Wisenberg, S. Head,
M. Polishak and other members of your staff at the conclu'lon of the inspection.
Areas examined during the inspection included preoperational test procedure
review, preoperational test witnessing, location of manual trip circuits, I w
fuel receipt, and followup to previously identified inspection concerns.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
i
observations by the NRC inspectors. The inspection findings are documented in
1
the enclosed inspection report,
Within the scope of the inspection, no violationt ,,
deviations were
identified.
An unresuved item is identified in paragraph 5 of the enclosed ir;spection
report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely.
Origin 2) syned By
L 1. Callan
L. J. Callan, Directoi
Division of Reactor Preaecos
Enclosure:
(see next page)
%h
D:DRPo\\p\\$
- RIV:RI
- RI
- C:TPS
- ICS
- D: DkS
HBund//ld THcKeNon MSeidle RElreland JLHilhoan
LJCallan
/ /88
/ /88
/ /88
/ /88
/ /88
j0 /d/88
- previously concurred
$@MO[$b : $!b f
(
o
___ _____ __ _ _ _ _ _ _ _ .
. _ . . _
L, '
'
'
.-
"
.
,
Houston Lighting & Power Company
-2-
,
,
'
Enclosure:
Appendix - NRC Inspection Report
50-498/88-62 w/ attachment
S0-499/88-62 w/ attachment
'
cc w/ enclosure:
'
Houston Lighting & Power Company
!
ATTN:
H. A. Mc3urnett, Manager
Operations Support Licensing
'
P.O. Box 289
Wadsworth. Texas 77483
Houston Lighting & Power Company
ATTN: Gerald E. Vaughn, Vice President
,.
Nuclear Operations
P.O. Box 289
,
Wadsworth, Texas 77483
Houston Lighting & Power Company
ATTN:
J. T. Westermeier, General Manager
South Texas Project
P.O. Box 289
Wadsworth. Texas 77483
'
Central Power & Light Coropany
ATTN:
R. L. Range /H. P. Verret
P.O. Box 2121
Corpus Christi, Texas 78403
t
!
City of Austin Electric Utility
!
ATTN:
R. J. Miner, Chief Operating
Officer
721 Barton Springt Road
l
.
'
- Newman & Holtzinger, P.C.
i
ATTN:
J. R. Newman, Esquire
1615 L Street, N.W.
Washington, D.C.
20036
,
i.
Houston Lighting & Power Company
,
ATTN:
S. L. Rosen
>
P.O. Box 289
,
Wadsworth, Texas 77483
l
l
1
i
Houston Lighting & Power Company
l
l
ATTN:
R. W. Chewning, Chairinan
l
!
Nuclear Safety Review Board
,
P.O. Box 289
I
Wadsworth Texas 77483
I
i
_ _ . . _ _
- _ _ _ _ - - _ _ . _ _
,
.
,
.
.
Houston Lighting & Power Company
-3-
<
City Public Service Board
ATTN:
R. J. Costello/M. T. Hardt
P.O. Box 1771
San Antonio, Texas 78296
Houston Lighting & Power Company
ATTN:
Licensing Representative
Suite 610
Three Metro Center
Bethesda, Maryland 20814
Texas Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- DRP
- RRI-OPS
- SectionChief(DRP/0)
- 3RS
- MIS System
- RPB-DRSS
Lisa Shea, RM/ALF
- RIV File
R. Bachmann. 0GC
- RSTS Operator
- G. Dick, NRR Project Manager
- Project Engineer, DRP/D
- RRI-CONST
- H.
Bundy
- T. McKernon
- W. Seidle
- R. E. Ireland
- w/766