ML20195E022

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-443/98-06 on 980823-1003.No Violations Noted
ML20195E022
Person / Time
Site: Seabrook 
Issue date: 11/06/1998
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Feigenbaum T, Harpster T
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
Shared Package
ML20195E027 List:
References
50-443-98-06, 50-443-98-6, NUDOCS 9811180218
Download: ML20195E022 (3)


See also: IR 05000443/1998006

Text

November 6,1998

Mr. T. C. Feigenbaum

Executive Vice President and Chief Nuclear Officer

Seabrook Station

North Atlantic Energy Service Corporation

c/o Mr. Terry L. Harpster

P. O. Box 300

Seabrook, NH 03874

SUBJECT:

NRC INTEGRATED INSPECTION REPORT NO. 50-443/98-06

Dear Mr. Feigenbaum:

On October 3,1998,the NRC completed an inspection at Seabrook Station. The enclosed

report contains the details of that inspection.

The plant was operated safely during the period. Operators responded well to prevent the

closing of a main steam isolation valve during surveillance testing. Maintenance and

engineering personnel provided good plant support, particularly in response to a service

water pump failure, in addition, we found that you continued to implement effective

radiological, environmental and meteorological monitoring prograrns. No cited violations

were identified this period, however, we observed instances where plant personnel were

slow to initiate adverse condition reports. Your continued strong rnanagement attention to

this area is warranted.

In accordance with 10 CFR 2.790 of the NRC " Rules of Practice," a copy of this letter and

its enclosures will be placed in the NRC Public Document Room.

Sincerely,

Original Signed By:

Curtis J. Cowgill, Chief

# " 'V

Projects Branch 5

.

'"3

Division of Reactor Projects

/

Docket No. 50-443

License No: NPF-86

Enclosure: NRC Inspection Report No. 50-443/98-06

.

'

9811180218 981106

PDR

ADOCK 05000443

G

PM

I

,

.

_

_ . _ .

.,

.

. _ _ _ .

. . . . _ . . .

.

_ _

. . . . . - _ . . _ ~ . -

-

,

,

Mr. Ted C. Feigenbaum

2

cc w/ encl:

B. D. Kenyon, President - Nuclear Group

, J. S. Streeter, Recovery Officer - Nuclear Oversight

W. A. DiProfio, Station Director - Seabrook Station

1

R. E. Hickok, Nuclear Training Manager - Seabrook Station

D. E. Carriere, Director, Production Services

.

L. M. Cuoco, Senior Nuclear Counsel

)

W. Fogg, Director, New Hampshire Office of Emergency Management

D. C. McEihinney, RAC Chairman, FEMA RI, Boston, Mass.

R. Backus, Esquire, Backuc, Meyer and Solomon, New Hampsb!'e

D. Brown-Couture, Director, Nuclear Safety, Massachusetts Emergency

Management Agency

F. W. Getman, Jr., Vice President and General Counsel - Great Bay Power

Corporation

R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts

Seacoast Anti-Pollution League

D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire

S. Comley, Executive Director, We the People of the United States

W. Meinert, Nuclear Engineer

l

t

1

.

l

I

L

I

!

I

i

-

.

.

,

-

-

-

..

.

- . - .

-

.

i

l

'

Mr. Ted C. Feigenbaum

3

Distribution w/er,ci:

Region i Docket Room (with concurrences)

PUBLIC

Nuclear Safety Information Center (NSIC)

NRC Resident inspector

H. Miller, RA /W. Axelson, DRA

C. Cowgill, DRP

R. Summers, DRP

i

D. Cullison, DRP

C. O'Daniell, DRP

' Distribution w/encis (VIA E-MAIL):

B. McCabe, OEDO

i

C. Thomas, PD l-3, NRR (COT)

J. Harrison, PD l-3, NRR

R. Correia, NRR (RPC)

F. Talbot, NRR

D. Screnci, PAO, ORA

'

inspection Program Branch, NRR (IPAS)

DOCDESK

DOCUMENT NAME: G:\\ BRANCH 5\\3-SB\\lNSPECT\\9806.WPD

To receive a copy of this document. huNcate in the box:

'C' = Copy without attachment / enclosure

  • E* = Copy with attachtnant/ enclosure
  • N* = No copy

g

OFFICE

Rl/DRP dt, pl

Rl/DRP fp

l

l

f

NAME

RLorson

L

CCowgill

DATE

ft /4/98

f t /4/98

-

OFFICIAL RECORD COPY