Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195D179 + (ML20195D179)
- PNO-II-86-036, on 860515,during Power Escalation Tests at 100% Power,Steam Generator Tube Leak Detected.Unit Out of Svc for 10 Days to Repair Leak + (ML20195D180)
- ML20195D185 + (ML20195D185)
- ML20195D190 + (ML20195D190)
- ML20195D191 + (ML20195D191)
- ML20195D192 + (ML20195D192)
- ML20195D194 + (ML20195D194)
- ML20195D195 + (ML20195D195)
- ML20195D196 + (ML20195D196)
- NG-86-1475, Forwards Preliminary Response to IE Bulletin 85-003,Item E Re motor-operated Valve Common Mode Failures During Plant Transients.Extension Requested Until 45 Days After BWR Owners Group Rept Submitted to NRC + (ML20195D197)
- ML20195D198 + (ML20195D198)
- ML20195D199 + (ML20195D199)
- ML20195D200 + (ML20195D200)
- ML20195D203 + (ML20195D203)
- ML20195D204 + (ML20195D204)
- ML20195D205 + (ML20195D205)
- ML20195D206 + (ML20195D206)
- ML20195D207 + (ML20195D207)
- 1CAN069902, Application for Amend to License DPR-51,revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks + (ML20195D208)
- 3F0586-15, Responds to Violations Noted in Insp Rept 50-302/86-04.No Corrective Action Necessary Since Operations Personnel Trained Annually on Abnormal Procedures + (ML20195D209)
- ML20195D210 + (ML20195D210)
- ML20195D211 + (ML20195D211)
- ML20195D212 + (ML20195D212)
- ML20195D213 + (ML20195D213)
- ML20195D215 + (ML20195D215)
- ML20195D217 + (ML20195D217)
- ML20195D219 + (ML20195D219)
- ML20195D221 + (ML20195D221)
- ML20195D223 + (ML20195D223)
- ML20195D225 + (ML20195D225)
- ML20195D226 + (ML20195D226)
- NUREG-1671, Notice of Reopening of Public Comment Period Unitl 991119 for NUREG-1671 Entitled, Standard Reivew Plan for Recertification of Gaseous Diffusion Plants + (ML20195D227)
- ML20195D230 + (ML20195D230)
- ML20195D231 + (ML20195D231)
- ML20195D233 + (ML20195D233)
- ML20195D234 + (ML20195D234)
- ML20195D236 + (ML20195D236)
- ML20195D237 + (ML20195D237)
- ML20195D238 + (ML20195D238)
- ML20195D239 + (ML20195D239)
- ML20195D241 + (ML20195D241)
- ML20195D242 + (ML20195D242)
- IR 05000277/1988013 + (ML20195D243)
- PY-CEI-NRR-2335, Monthly Operating Rept for Oct 1998 for Perry Nuclear Power Plant,Unit 1.With + (ML20195D244)
- 3F0586-16, Responds to Violations Noted in Insp Rept 50-302/86-11. Corrective Actions:Hydrolasing of Reactor Coolant Pump B Terminated Until Evaluation of Activity & Associated Radiological Hazards Performed + (ML20195D245)
- NRC-88-0239, Provides Correction to 880725 Final Response to NRC Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings + (ML20195D247)
- 05000354/LER-1998-007-02, :on 981009,standby Liquid Control Pump Inoperability Was Noted Due to Incorrectly Performed Ist. Caused by Personnel Error.Revised Test Procedure. with + (ML20195D248)
- ML20195D251 + (ML20195D251)
- ML20195D253 + (ML20195D253)
- ML20195D254 + (ML20195D254)
- ML20195D256 + (ML20195D256)