Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195D149 + (ML20195D149)
- ML20195D150 + (ML20195D150)
- ML20195D151 + (ML20195D151)
- ML20195D152 + (ML20195D152)
- TXX-4740, Responds to NRC Re Deviations Noted in Insp Repts 50-445/85-13 & 50-446/85-09.Corrective Actions:Engineers Reinstructed in Section 5.2 of Procedure CPP-008 & out-of- Scope Observation in Remarks Column Discussed W/Inspector + (ML20195D154)
- ML20195D156 + (ML20195D156)
- ML20195D157 + (ML20195D157)
- ML20195D159 + (ML20195D159)
- ML20195D160 + (ML20195D160)
- AECM-86-0136, Responds to Violations Noted in Insp Rept 50-416/86-06. Corrective Actions:Technical Section Procedure 09-S-02-400, Control Rod Sequences & Movement Control Revised to Aid Verification to Reactor Plant Control Sys Constraints + (ML20195D161)
- ML20195D162 + (ML20195D162)
- ML20195D163 + (ML20195D163)
- ML20195D165 + (ML20195D165)
- ML20195D166 + (ML20195D166)
- ML20195D168 + (ML20195D168)
- LIC-98-0154, Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With + (ML20195D169)
- ML20195D170 + (ML20195D170)
- IR 05000219/1988013 + (ML20195D171)
- 2CAN069901, Forwards Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14. Replacement of SGs Planned for Next Refueling Outage (2R14) Scheduled for Fall of 2000 + (ML20195D176)
- 05000412/LER-1988-015-01, :on 880928,util Informed of Cracking & Spalling at Support Pads of Diesel Generator Exhaust Silencers 2EDG*SIL3A & 3B.Caused by Bent Anchor Bolts.Increased Surveillance Recommended.Part 21 Related + (ML20195D178)
- ML20195D179 + (ML20195D179)
- PNO-II-86-036, on 860515,during Power Escalation Tests at 100% Power,Steam Generator Tube Leak Detected.Unit Out of Svc for 10 Days to Repair Leak + (ML20195D180)
- ML20195D185 + (ML20195D185)
- ML20195D190 + (ML20195D190)
- ML20195D191 + (ML20195D191)
- ML20195D192 + (ML20195D192)
- ML20195D194 + (ML20195D194)
- ML20195D195 + (ML20195D195)
- ML20195D196 + (ML20195D196)
- NG-86-1475, Forwards Preliminary Response to IE Bulletin 85-003,Item E Re motor-operated Valve Common Mode Failures During Plant Transients.Extension Requested Until 45 Days After BWR Owners Group Rept Submitted to NRC + (ML20195D197)
- ML20195D198 + (ML20195D198)
- ML20195D199 + (ML20195D199)
- ML20195D200 + (ML20195D200)
- ML20195D203 + (ML20195D203)
- ML20195D204 + (ML20195D204)
- ML20195D205 + (ML20195D205)
- ML20195D206 + (ML20195D206)
- ML20195D207 + (ML20195D207)
- 1CAN069902, Application for Amend to License DPR-51,revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks + (ML20195D208)
- 3F0586-15, Responds to Violations Noted in Insp Rept 50-302/86-04.No Corrective Action Necessary Since Operations Personnel Trained Annually on Abnormal Procedures + (ML20195D209)
- ML20195D210 + (ML20195D210)
- ML20195D211 + (ML20195D211)
- ML20195D212 + (ML20195D212)
- ML20195D213 + (ML20195D213)
- ML20195D215 + (ML20195D215)
- ML20195D217 + (ML20195D217)
- ML20195D219 + (ML20195D219)
- ML20195D221 + (ML20195D221)
- ML20195D223 + (ML20195D223)
- ML20195D225 + (ML20195D225)
- ML20195D226 + (ML20195D226)