Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154L296 + (ML20154L296)
- ML20154L297 + (ML20154L297)
- ML20154L299 + (ML20154L299)
- ML20154L300 + (ML20154L300)
- ML20154L302 + (ML20154L302)
- ML20154L305 + (ML20154L305)
- ML20154L306 + (ML20154L306)
- IR 05000353/1986004 + (ML20154L307)
- ML20154L308 + (ML20154L308)
- 05000321/LER-1988-005-02, :on 880419,reactor Scram Occurred After Personnel Exchanged Turbine Lubrication Oil Coolers.Caused by Personnel Error.Involved Operations Personnel Counseled & Procedures Revised + (ML20154L310)
- ML20154L311 + (ML20154L311)
- ML20154L313 + (ML20154L313)
- ML20154L314 + (ML20154L314)
- ML20154L315 + (ML20154L315)
- ML20154L317 + (ML20154L317)
- PY-CEI-NRR-0427, Certifies That Final Draft Tech Specs Consistent W/Fsar,Nrc SER & Suppls & as-built Plant Per NRC 851119 Request.Tech Spec Review Programs Described in Encl.Nrc 851129 & 1230 & 860307 Concerns Under Review + (ML20154L318)
- ML20154L319 + (ML20154L319)
- ML20154L321 + (ML20154L321)
- BECO-88-137, Forwards Util Response to SALP Rept 50-293/87-99 for 870201-880515.Util Ability to Self Assess & to Set & Meet Rising Stds of Excellence Proven + (ML20154L323)
- ML20154L324 + (ML20154L324)
- ML20154L326 + (ML20154L326)
- 05000333/LER-1988-001, :on 880310,HPCI Turbine Steam Supply Valve Failed to Open in Response to Open Signal.Caused by Procedures Not Including Evaluation of Relubrication of Threads of Valve Stem & Stem Nut + (ML20154L327)
- ML20154L328 + (ML20154L328)
- ML20154L329 + (ML20154L329)
- ML20154L331 + (ML20154L331)
- ML20154L333 + (ML20154L333)
- IR 05000413/1988032 + (ML20154L338)
- ML20154L339 + (ML20154L339)
- ML20154L340 + (ML20154L340)
- ML20154L341 + (ML20154L341)
- ML20154L342 + (ML20154L342)
- ML20154L344 + (ML20154L344)
- ML20154L346 + (ML20154L346)
- ML20154L347 + (ML20154L347)
- LIC-98-0136, Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With + (ML20154L349)
- ML20154L351 + (ML20154L351)
- ML20154L352 + (ML20154L352)
- ML20154L353 + (ML20154L353)
- PNO-IV-88-045, on 880521,plant Startup Followed Extended Outage for Performance of Maint Work.Completion of Testing at 30% Plateau Scheduled for 880526.Upon Satisfactory testing,50% Plateau Will Commence on 880527 + (ML20154L354)
- ML20154L355 + (ML20154L355)
- B17493, Monthly Operating Rept for Sept 1998 for Mnps,Unit 1.With + (ML20154L356)
- ML20154L360 + (ML20154L360)
- B17458, Monthly Operating Rept for Sept 1998 for Mnps,Unit 3.With + (ML20154L361)
- L-98-198, Requests Withdrawal of LARs 242 & 113 Which Were Submitted on 970310,to Allow Use of Framatome SG Sleeving Methodology on Permanent Basis + (ML20154L364)
- ML20154L365 + (ML20154L365)
- ML20154L366 + (ML20154L366)
- PNO-I-88-055, on 880523,worker Slipped & Fell Into Reactor Vessel from Defueling Platform.Caused by Worker Unhooking Himself from Sling to Install Equipment in Reactor Vessel. Worker Decontaminated & Licensee Conducted Event Critique + (ML20154L367)
- ML20154L368 + (ML20154L368)
- ML20154L369 + (ML20154L369)
- HBL-88-047, Replacement Pages for Proposed Safstor Tech Specs,Rev 0 + (ML20154L370)
- ML20154L372 + (ML20154L372)