Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154B758 + (ML20154B758)
- ML20154B759 + (ML20154B759)
- 05000443/LER-1988-004, :on 880810,vital Buses E5 & E6 Tripped on Loss of Offsite Power Causing Actuation of Diesel Generator 1A Onto Bus E5.Caused by Personnel Error.Addl Training Will Be Established + (ML20154B761)
- ML20154B762 + (ML20154B762)
- 05000456/LER-1998-004-06, :on 980903,MSSVs Tested in Excess of Required Setpoint.Caused by Metallic Bonding Between Disc & Nozzle Seats.Valves Were Adjusted as Necessary & Retested for Placement Into Accepted Tolerance Range Prior to LCO Exit + (ML20154B763)
- ML20154B764 + (ML20154B764)
- ML20154B765 + (ML20154B765)
- ML20154B769 + (ML20154B769)
- ML20154B770 + (ML20154B770)
- 05000369/LER-1988-018-02, :on 880715,performance Determined During Testing Revealed Inability to Demonstrate Each Diesel Generator Operable.Caused by Inadequate Tech Specs. Procedures Revised + (ML20154B771)
- ML20154B772 + (ML20154B772)
- BECO-86-018, Application for Amend to License DPR-35,incorporating Proposed Change 86-02,modifying Surveillance Testing of Diesel Fuel Oil.Fee Paid + (ML20154B773)
- ML20154B775 + (ML20154B775)
- ML20154B778 + (ML20154B778)
- ML20154B780 + (ML20154B780)
- ML20154B781 + (ML20154B781)
- 05000245/LER-1988-006-02, :on 880806,standby Gas Treatment Sys Initiated Automatically & Reactor Bldg Ventilation Sys Isolated Due to Spurious High Radiation Signal.Caused by Electronic Equipment Failure.Relays & Capacitors Tested + (ML20154B783)
- ML20154B784 + (ML20154B784)
- ML20154B785 + (ML20154B785)
- ML20154B786 + (ML20154B786)
- ML20154B787 + (ML20154B787)
- ML20154B788 + (ML20154B788)
- ML20154B792 + (ML20154B792)
- IA-98-345, Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 + (ML20154B793)
- ML20154B793 + (ML20154B793)
- ML20154B795 + (ML20154B795)
- ST-HL-AE-2780, Requests Meeting W/Region IV to Discuss Schedule for Lock Down Security Schedule of Facility.Meeting Tentatively Scheduled for 880908 + (ML20154B796)
- ML20154B797 + (ML20154B797)
- ML20154B798 + (ML20154B798)
- ML20154B799 + (ML20154B799)
- ML20154B800 + (ML20154B800)
- ML20154B801 + (ML20154B801)
- NPL-98-0777, Forwards Addl Info Re GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. Rev 0 to Calculation 98-0132, Evaluation of 23.6 EFPY P-T Limit & LTOP Applicability Date & Pressurized Thermal Shock at 32 EFPY, Encl + (ML20154B803)
- ML20154B804 + (ML20154B804)
- ML20154B805 + (ML20154B805)
- ML20154B806 + (ML20154B806)
- ML20154B807 + (ML20154B807)
- ML20154B810 + (ML20154B810)
- IR 05000354/1986005 + (ML20154B811)
- ML20154B813 + (ML20154B813)
- ML20154B815 + (ML20154B815)
- 05000213/LER-1998-008, :on 980721,determined That Main Stack Radiation Monitor RMS-14B Samples Were Not Analyzed to Required Detection Level.Caused by Inadequate Design.Immediately Controlled Temp of Radiation Monitor Room.With + (ML20154B816)
- ML20154B817 + (ML20154B817)
- ML20154B819 + (ML20154B819)
- ML20154B820 + (ML20154B820)
- ML20154B821 + (ML20154B821)
- ML20154B822 + (ML20154B822)
- U-601265, Ro:On 880901,HPCS Initiated & Injected Water Into Reactor for 28 During Maint Surveillance Activities on Reactor Water Level Transmitter.Injection Valve & HPCS Pump Secured. Notification of Unusual Event Lasted Approx 10 Minutes + (ML20154B824)
- PY-CEI-NRR-0440, Forwards Suppl to Info Provided in 860212 & 28 Ltrs Re Seismic Event Evaluation,Including Natural Frequency of Seismic Instrumentation Mounting Arrangement & Strong Motion Data from Aftershock + (ML20154B825)
- ML20154B827 + (ML20154B827)
- ML20154B828 + (ML20154B828)